ML16014A224

From kanterella
Revision as of 14:21, 30 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Millstone, Units 1, 2, and 3 - Revision 003 to CP 3804L, PASS Containment Air Sample
ML16014A224
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 12/29/2015
From:
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP 3804L, Rev. 3
Download: ML16014A224 (41)


Text

TPCKOZToFacilityAddress:DOCUMENT CONTROL DESK:MP Department:

U.S. NUCLEAR REGULATORY COMMISSION DOCUMENT CONTROL DESK (0140)WASHINGTON, DC 20555-0001 PASSPORT DOCUMENTTRANSMITTAL Page:Dlillllii D i 11111111111 From : CONTROLLED Date/Time
12/29/15 13:Trans No. : 000153267 Total Items: 00001DOCUMENTS Transmittal Group Id: 1511845Item Facility Type Sub Document Number/ITitle Sheet Revision Doc Date Copy # Media Copies* 0001 MP PROC CH CP 3804L 003 P 01PASS CONTAINMENT AIR SAMPLEPlease check the appropri~ate response and return form to NDS Bldg 475/3Millstone Power Station or Fax to 860-440-2057.

3 All documents received.

Documents noted above not received (identify those not received).

I olonger require distribution of these documents.

Date:Date:Signature:

I , ,S Dominio-° A dministrative Correction A uthorization CP 3804L -*03PASS Containment Air Sample4. Requestor(s)

Print Name(s) / Locations

5. Date 6. Requestor PhoneGreg D'Auria 12/29/15 45757. Applicable Nuclear Station(s)

Millstone

[] North Anna LI Surry LI8. Please check below to indicate the type of administrative correction needed.[] Updating titles, names, phones numbers, document format, procedure

numbers, or references LI Misspellings (e.g., "adn" instead of "and")LI Incorrect step number sequencer eg. "6.3.1, 6.3.3, 6.3.2" instead of"'6.3.1, 6.3.2, 6.3.3")LI Incorrect page numbers in the headers and attachments (e.g., "PAGE 82 of 80" instead of "PAGE 82 of 82")LI Incorrect pagination, such as incorrect page breaksLii Incorrect transitions,
branches, and references (e.g., referenced procedure has been renumbered)

LI Mistakes occurring during duplication (cloning) of procedures (e.g., Unit 1 panel number, equipment location number, orprocedure number in a Unit 2 procedure)

LI Incorrect equipment location

numbers, if the noun descriptor fits the application LI Incorrect noun descriptor, if the equipment location number is accurateLI Mistakes or computer file corruptions that occurred during the posting process[] Other: Changed instances of VERIFY to CHECK or ENSURE as applicable.

Errors in setpoints, measurements, or quantitative acceptance criteria shall not be considered an administrative correction Authorization for Permanent Administrative Correction

9. Procedure Process Management SignatureA
10. Date11. M'anager Nuclear Operations Signature (Required for E--s FCAs, or FSGs) 12. DateN/AAdministrative Correction Completed By ____________

Jeff D. Urgitis NOTE: The individual(s) posting an Administrat~,e to EDM re responsible for ensuring Nuclear E-Formsis updated.16. Nuclear E-Forms Updated for Site(s)?

17. Nuclear E-Forms Updated Print Namne/Signature
18. DateLIMP LINA LISU M]N/A NIA19. Technical Procedure Number: 20. Revision:
21. Effective I~ate.cP 3804. 003/iForm No. 730689(May 2015)

MILLSTONE POWER STATIONCHEMISTRY PROCEDURE STOPTHINKAii¸i¸ RE'IEPASS Containment Air Sample 6.28]CP 3804LRev. 003NOTEA review by the Emergency Planning Department is required whenever this procedure isrevised or whenever changes are made to this procedure which impact the ability tocollect and analyze a PASS sample.Apprval DatUe:EffetiveuDate 12/29/1512/29/15Level of UseContinuous Millstone Unit 3Chemistry Procedure PASS Containment Air SampleTABLE OF CONTENTS1. PURPOSE..................................................

22. PREREQUISITES

...........................................

23. PRECAUTIONS

.............................................

74. JINSTRUCTIONS

............................................

84.1 Preparation for PASS Sample Acquisition

.....................

84.2 Sample Acquisition.....................................

154.3 System Flush Prior To Sample Retrieval

.....................

174.4 Retrieval of Containment Air Samples ......................

184.5 Sample Analysis........................................

214.6 Gas Isotopic Analysis....................................

224.7 Gas Composition Analysis

...............................

244.8 Restoration from PASS Sample Acquisition

..................

255. REVIEW AND4T SIGNOFF.............

........................

316. REFERENCES

.............................................

317. SUMMARY OF CHANGES ...................................

33ATTACHMENTS ANT) FORMSAttachment 1, "Initial System Alignment Check" ...................

35Attachment 2, "Gas Activity Worksheet"

..........................

36Attachment 3, "C3SSP-SAS2 Septum Replacement"

..................

37Attachment 4, "Containment Air PASS Simplified Drawing".

..........

38CP 3804L-OO1,"PASS Containment Air Sample Data"CP 3804L-OO2,"PASS Containment Air Sample Restoration Lineup"Level of Use CP 3804LContinuous STOP THINK ACT REVIEW Rev. 003

1. PURPOSE1.1 Objective Provide instructions for operation of the Unit 3 containment air postaccident sample system for containment air sample acquisition when high iradioactivity levels, may preclude the normal (conventional) samplingmethod.This procedure satisfies regulatory commitment B 18443-01 to maintaincontingency plans for obtaining and analyzing highly radioactive samplesof the containment atmosphere.

This procedure was developed using the reactor technical manual for thecontainment air PASS (Ref.6.2) and other documents identified herein. I1.2 Discussion If conditions arise that will not allow Sections 4.1 through 4.4 to becompleted, the procedure user will be directed to Section 4.8,"Restoration from PASS Sample Acquisition,"

to return the system tonormal.Attachment 4 contains a simplified drawing of the containment air post iaccident sample system. I1.3 Applicability This procedure is applicable when in-plant radioactivity levels are too ihigh to permit containment air sampling via the normal (conventional)

-@method.1.4 Frequency As required during periods of elevated in-plant levels. E2. PREREOUISITES 2.1 General/ 2.1.1 Heat tracing panel 3HTS-PNLA3 (OP 3352) has been energized for at least 1/2 hour./ 2.1.2 To prevent condensation and iodine plate-out in the samplelines, verify containme~nt temperature is less than or equal to1'70° ELevel of Use CP 3804LContinuous STOP THINK ACT REVIEW Rlev. 0032 of 38 Lee/fUCotna/2.1.3 Key has been obtained to unlock the following:

Train A Train B3SSP*V51 3SSP*V523SSP*V59 3SSP*V603HCS*V2 3HCS*V93HCS*V3 3HCS*V103HCS*V6 3HCS*V132.1.4 Health Physics has been notified that a containment air PASSsample will be taken.2.1.5 Health Physics has evaluated need for RWP.2.1.6 Lab ventilation is operating.

2.1.7 Lead brick shielding has been placed in lab ventilation hood.2.1.8 Computer radioisotopic analysis system in operation andcalibrated.

2.1.9 Gas chromatograph has been set up and calibrated, or calibration has been initiated for PASS containment air sample analysis ifdesired.2.1.10 Proper operation of sample syringes in PASS suitcase has beenverified.

2.1.11 13 cc gas vial has been stoppered and evacuated.

2.1.12 One train of SLCRS in operation.

  • 0STOPTHINKCP 3804LACT REVIEW Rev. 0033 of 38 2.1.13 Manager of Radiological Dose Assessment (MRDA) or theAssistant Manager of Radiological Dose Assessment (AMRDA)has requested a containment air sample to include the following:

Check Reouested Analysis Samnle Eauioment Needed-- --i-- I I[]Gas isotopicEI] Gas composition "GAS ISOTOPIC" syringe,stoppered and evacuated 13 cc gasvial*0"GAS COMP" syringeCheck Sample PointI] Hydrogen Recombiner Train A[] Hydrogen Recombiner Train B2.1.14 Containment Air PASS Team has completed pre-job brief asfollows:*Manager of Operational Support Center (MOSC) -designates, assembles, and briefs the Containment Air PASSTeam for implementation of this procedure o Operational Support Center Assistant Radiological Protection Supervisor (OSC ARPS) with the concurrence of the Managerof Radiological Consequence Assessment (MRCA) -specifies the radiological controls required for implementation of thisprocedure

2.2 Documents

2.2.1 C CP 803.12, "Operation and Calibration of the Varian CP-4900Micro -GC"2.2.2 C CP 803.6, "Gamma Spectroscopy Counting SystemMaintenance and Operation" 2.2.3 CP 3804K Attachment, "PASS Sample Equipment Inventory" 2.2.4 PI-AA- 200, "Corrective Action"2.2.5 WM-AA- 100, "Work Management" 02.2.6 RWIP for PASS sample collection.

2.2.7 Gas sample isotopic printoutLevel of Use IContinuousI STOP THINKCP 3804LACT REVIEW Rev. 0034 of 38

2.3 Personnel

2.3.1 Assistant

Director, Technical Support (ADTS)2.3.2 Manager of Radiological Dose Assessment (MRDA) or Assistant Manager of Radiological Dose Assessment (AMRDA)2.3.3 Manager of Operational Support Center (MOSC)2.3.4 Operational Support Center Assistant Radiological Protection Supervisor (OSC ARPS)2.3.5 Manager of Control Room Operations (MCRO)2.3.6 Manager of Radiological Consequence Assessment (MRCA)2.3.7 Containment Air PASS Team consisting of the following personnel:
  • At least two Chemistry Technicians
  • At least one Health Physics Technician Level of UseContinuous STOP THINK,, CP 3804LACT, REVIEW Rev. 0035 of 38 2.4 Tools and Consumables 2.4.1 Located in Unit 3 Chemistry Lab* 13 cc gas vial* 13 cc gas vial stopper* 24 Lead bricks* PASS transport carto, Syringe transfer container
  • 250 rtl syringe labeled "GAS ISOTOPIC"
  • 2.0 ml syringe labeled "GAS COMP"* Key to 3SSP-PNL2 (Issued to U3 Chemistry personnel)
  • Key to the following valves: ITrain A Train B3SSP*V51 3SSP*V523SSP*V59 3SSP*V603HCS*V2 3HCS*V93HCS*V3 3HCS*V103HCS*V6 3HCS*V13*Watch2.4.2 Located in PASS Cabinet in 112 Recombiner Building I* Spare syringe needles* 3SSP-SAS2 septums* 1/2" Socket wrench* Phone headset* Scribe* Tweezers* Septum insertion tool* Calculator
  • Damper operating tool* Flat-tipped screwdriver I* Valve wrench I2.5 Responsibilities 2.5.1 The ADTS shall make the decision to obtain a sample usingPASS.2.5.2 The Manager of Operational Support Center designates, assembles and briefs the PASS team.ILevel of Use [ "CP 3804LContinuousI STOP THINK ACT REVIEW' Rev. 003* .. """ 6 of 38 2.5.3 The Manager of Radiological Consequence Assessment specifies PASS team radiological controls.

2.5.4 The Operational Support Center Assistant Radiological Protection Supervisor assigns HIP technicians and briefs the PASSteam on radiological conditions.

2.5.5 The Manager of Radiological Dose Assessment or the Assistant Manager of Radiological Dose Assessment specify PASS teamsampling and analysis requirements.

2.6 Definitions

2.6.1 SLCRS -supplementary leak collection and release system2.6.2 CR -Condition Report3. PRECAUTIONS 3.1 The inside of 3SSP-SAS2, containment air sample module, is potentially contaminated.

Proper Health Physics practices and RWP requirements must be followed to prevent the spread of contamination.

3.2 Nitrogen pressures

> 100 psig can damage the tubing in 3SSP-PNL2.

L evel of UseContinuous STOPTHINKCP 3804LACT REVIEW Rev. 0037 of 38

4. INSTRUCTIONS 4.1 Preparation for PASS Sample Acquisition 4.1.1 PERFORM the following and INITIAL CP 3804L-001:
  • ENSURE "General Prerequisites" have been completed
  • REVIEW Section 3, "Precautions"

____4.1.2 IF during performance of Sections 4.1 through 4.8 anyoperational problems are encountered, RECORD notedproblems on CP 3804L- 001._____4.1.3 IF during performance of Sections 4.1 through 4.4, operational problems are encountered that will not allow sampling to becompleted, Go To Section 4.8, "Restoration from PASS SampleAcquisition."

_____4.1.4 PROCEED to containment air sample module with the following:

  • Stoppered and evacuated 14.4 cc gas vial* Key to 3SSP-PNL2 (Issued to U3 Chemistry personnel)
  • Key to the following valves:Train A Train B3SSP*V51 3SSP*V523SSP*V59 3SSP*VC03HCS*V2 3HCS*V93HCS*V3 3HCS*V103HCS*V6 3HCS*V13* Watch* CP 3804L-001 and CP 3804L-002
  • Syringe transfer container

___4.1.5 UNLOCK 3SSP-PNL2, containment air sample remote panel._____4.1.6 Refer To Attachment 1 and CHECK system alignment.

Level of Use cP 3804LContinuous STOP THINK ACT REVIEW Rev. 003 4.1.7 NOTIFY MCRO of the following:

a. 3HVR*DMP60 will be openedb. IF in operating Modes 1-4, Enter LCO 3.6.6.2 for3HVR*DMP60

[Ref. 6.1]c. PERFORM one of the following:

1) IF hydrogen recombiner train A was selected instep 2.1.13, NOTIFY MCRO that the following valveswill be opened if not already open:* 3HCS*V2, recombiner lA supply outer isolation
  • 3HCS*V3, recombiner lA supply inner isolation
  • 3HCS*V6, recombiner RBNR- 1A return isolation
2) IF hydrogen recombiner train B was selected instep 2.1.13, NOTIFY MCRO that the following valveswill be opened if not already open:* 3HCS*V9, recombiner lB supply outer isolation
  • 3HCS*V1O, recombiner 1B supply inner isolation
  • 3HCS*V13, recombiner RBNR-1lB return isolation
d. IF in operating Modes 1-4, Track Tech Spec surveillance requirements of 4.6.1.1.a for the valves opened in step 4.1.7 c.NOTEConstant commnunications with the control room are required when3HCS*V2, 3HCS*V3, 3HCS*V6, 3HCS*V9, 3HCS*V10, or 3HCS*V13are opened in Modes 1-4.___4.1.8 IF in operating Modes 1-4, DON phone headset andESTABLISH communications with Control Room.L evel of UseContinuous STOPTHINKCP 3804LACT REVIEW Rev. 0039 of 38 IO4.1.9 PERFORM the following:
a. Using damper operating tool, OPEN 3HVR*DMP60, 3SSP- SAS1/SAS2 exhaust isolation damper [Ref. 6.1]b. OPEN 3HVR-DMP1301, 3SSP-SAS2 exhaust damper[Ref. 6.1].4.1.10 PERFORM the following at 3SSP-PNL2, containment airsample remote panel:a. ZERO timer.b. PUSH and HOLD "POWER ON" button for 1 to 2 secondsto energize remote operating module and RECORD time:INOTEA lit fuse indicator light indicates the fuse is blown.____c. CHECK line fuses and blower fuse indicator lights are not lit.___d. OPEN 3SSP-V53, nitrogen supply to containment airsample PNL2.NOTE3SSP-PCV82 may require periodic adjustment to maintain 45.-50 psigoutlet pressure.

Nitrogen pressures

> 100 psig can damage the tubing in 3SSP-PNL2.

e. ADJUST 3SSP-PCV82, nitrogen pressure regulator, to45-50 psig.Level of UseContinuous STOP THINKCP 3804LACT REVIEW Rev. 00310 of 38

~ALARAThe inside of 3SSP-SAS2, containment air sample module, is potentially contaminated.

Proper Health Physics practices and RWP requirements must be followed to prevent the spread of contamination.

____4.1.11 At 3SSP-SAS2, containment air sample module, CHECKexhaust fan is running.4.1.12 IF exhaust fan is not running, PERFORM the following at3SSP-PNL2, containment air sample remote panel:____a. PUSH "POWER ON" button to de-energize panel.____b. PUSH and HOLD "POWER ON" button for 1 to 2 secondsto energize remote operating module and RECORD time:____c. At 3SSP-SAS2, containment air sample module, CHECKexhaust fan is running.____d. IF exhaust fan is not running, NOTIFY MOSC.ILevel of Use IContinuousI STOP THINKCP 3804LACT REVIEW Rev. 00311 of 38 I .NOTEIf hydrogen recombiner train A is running, the following valves will alreadybe open:* 3HCS*V2, recombiner 1A supply outer isolation

  • 3HCS*V3, recombiner 1A supply inner isolation
  • 3HCS*V6, recombiner RBNR- lA return isolation N/CAUTIONVIt is imperative not to push in on the hand wheel when operating the following valvesunless SM/US permission is obtained.

-This engages the clutch override and couldresult in damage to the valve.Train A Train B3HCS*V2 3HCS*V6 3SSP*V59 3HCS*V9 3FHCS*V13 3SSP*V603IICS*V3 3SSP*V51 3HCS*V10 3SSP*V524.1.13 IF hydrogen recombiner train Awas selected in step 2.1.13,UNLOCK and OPEN the following valves:* 3HCS*V2, recombiner lA supply outer isolation

  • 3HCS*V3, recombiner 1A supply inner isolation
  • 3HCS*V6, recombiner RBNR- lA return isolation
  • 3SSP*V51, containment air sample return cross-connect
  • 3SSP*V59, containment air sample supply cross-connect L evel of UseContinuous STOPTHINKCP 3804LACT REVI EW Rev. 00312 of 38 V CAUTIONIt is imperative not to push in on the hand wheel when operating the following valvesunless SM/US permission is obtained.

This engages the clutch override and couldresult in damage to the valve.Train A Train B3HCS*V2 3HCS*V6 3SSP*V59 3HCS*V9 3HCS*V13 3SSP*V603HCS*V3 3SSP*V51 3HCS*V10 3SSP*V52NOTEIf hydrogen recombiner train B is running, the following valves will alreadybe open:* 31{CS*V9, recombiner lB supply outer isolation

  • 3HCS*V10, recombiner lB supply inner isolation
  • 311CS*V13, recombiner RBNR-1B return isolation 4.1.14 IF hydrogen recombiner train B was selected in step 2.1.13,UNLOCK and OPEN the following valves:* 3HCS*V9, recombiner lB supply outer isolation

____ 3I-CS*V10, recombiner lB supply inner isolation

___

  • 3HCS*V13, recombiner RBNIR-1B return isolation
  • 3SSP*V52, containment air sample return cross-connect
  • 3SSP*V60, containment air sample supply cross-connect 4.1.15 At 3SSP-PNL2, containment air sample remote panel,POSITION the following valves as indicated:

___a. 3SSP-V2037 to "OPEN."____ b. 3SSP-V2035 to "SAMPLE."

c. 3SSP-V112 to "01FF."d. 3SSP-V2034 to "OFF."Level of Use CP 3804LContinuous[

STOP THINK ACT REVIEW Rev. 00313 of 38 hAALARA3SSP-PNL2, containment air sample remote panel, requires a 15 minutewarm-up period. The time that the instrument was energized is recordedon Chem Form 3804L- 1. The PASS Team Health Physics Technician willdetermine the best location to wait for the completion of the warm-up.___4.1.16 REQUEST Health Physics Technician determine mostappropriate location to wait for completion of 15 minutewarm-up of 3SSP-PNL2, containment air sample remote panel.-End of Section 4.1 -Level of Use IContinuousI STOP THINKCP 3804LACT REVIEW Rev. 00314 of 38 4.2 Sample Acquisition

____4.2.1 Refer To step 4.1.10 b. or step 4.1.12 b. and ENSURE 15 minutewarm-up of 3SSP-PNL2, containment air sample remote panel,is complete.

____4.2.2 Refer To CF 3804L- 001 and MARK box corresponding tohydrogen recombiner train being sampled.____4.2.3 At 3SSP-PNL2, containment air sample remote panel,POSITION 3SSP-V112 to "SAMPLE INFLUENT."

4.2.4 At 3SSP*PNL3, post accident sample panel, PERFORM thefollowing:

___a. ROTATE 'AIlR SAMPLE PUMP P4 SPEED CONTROL'knob fully clockwise.

____b. PUSH SAMPLE PUMP P4" start button to start3SSP-P4____ ~4.2.5 RECORD time purge started:

_________4.2.6 At 3SSP-PNL2, containment airsample remote panel, RECORD flow rate: l_____ pm____4.2.7 PERFORM the following calculation to determine purge time inminutes.Purge time =220 / purge flow rate in 1pmPurge time = 220 / l_____pm

=______minutes 4.2.8 WHEN purge time has passed, ISOLATE sample as follows:____a. At 3SSP*PNL3, post accident sample panel, ADJUST3SSP-P4 speed control to achieve a sample flow rate of 10 to121lpm indicated on 3SSP-PNL2, containment air sampleremote panel.____b. At 3SSP-PNL2, containment air sample remote panel,RECORD flow rate: _____pm____c. POSITION 3SSP-V2037 to "CLOSE."Level of Use cF 3804LContinuous STOP THINK ACT REVIEW Rev. 00315 of 38

d. CHECK that flow rate is less than value recorded instep 4.2.8 b.e. WAIT 1 minute.f. POSITION 3SSP-V2035 to "BYPASS AND FLUSH."g. Refer To CF 3804L-001 and RECORD sample date andtime.h. POSITION 3SSP-V112 to "OFF."4.2.9 At 3SSP*PNL3, post accident sample panel, PUSH "AIRSAMPLE PUMP P4" stop button to stop 3SSP-P4.-End of Section 4.2 -Level of UseContinuousI STOP THINKCF 3804LACT REVIEW Rev. 00316 of 38 4.3 System Flush Prior To Sample Retrieval 4.3.1 At 3SSP-PNL2, containment air sample remote panel,INITIATE nitrogen purge as follows:a. POSITION the following valves as indicated:
1) 35SFP-V112 to "NITROGEN FLUSH."2) 3SSP-V2037 to "OPEN."3) 3SSP-V2034 to "CON."___b. RECORD flow rate: l____ pm_____c. WAIT 3 minutes.______d.

POSITION 3SSP-V2037 to "CLOSE."______e.

CHECK that flow rate is less than value recorded instep 4.3.1 b._____f. WAIT 3 minutes.g. POSITION the following valves as indicated:

1) 3SSP-V2034 to "OFF."2) 3SSP-V112 to "OFF."3) 3SSP-V2037 to "OPEN."lHealth 4.3.2 Based on radiation reading in sample module room, DIRECTTehnsician Chemistry Technicians to perform one of the foloig____ Go To step 4.3.1 and REPEAT flush* Go To Section 4.4 and retrieve samples-End of Section 4.3 -ILevel of UseContinuous STOPTHINKCP 3804LACT REVIEW Rev. 00317 of 38 4.4 Retrieval of Containment Air Samples4.4.1 At 3SSP-SAS2, containment air sample module, OPEN cabinetdoor.4.4.2 IF gas isotopic sample was requested in step 2.1.13, PERFORMthe following:
a. ENSURE needle is screwed fully into 250 [1 syringe labeled"GAS ISOTOPIC."

NOTEI 3ssP-v2036 is open when handle is inline with needle guide.b. OPEN 3SSP-V2036, containment air sample moduleinternal bypass valve.c. INSERT syringe into needle guide until syringe nut isengaged.~ALARA1. Do not unscrew syringe body more than 2 turns counterclockwise.

Excessive turns will disengage needle from syringe.2. Steps 4.4.2 d. through g. should be performed rapidly to minimizeexposure.

d. Rapidly DRAW 250 gas sample into syringe and TURNsyringe body 2 turns counterclockwise to lock sample insyringe.e. REMOVE syringe from needle guide and INSERT needleinto stoppered 13 cc gas vial.f. HOLD syringe tip and TURN syringe body 2 turns clockwise to unlock syringe and INJECT contents of syringe intostoppered 13 cc gas vial.g. PLACE syringe and gas vial into syringe transfer container and PLACE lid on syringe transfer container.

E0E0Level of Use [Continuous STOP THINKCP 3804LACT REVIEW Rev. 00318 of 38

____h. CLOSE 3SSP-V2036, containment air sample moduleinternal bypass valve.4.4.3 lI__ gas composition sample was requested in step 2.1.13,PERFORM the following:

____a. ENSURE needle is screwed fully into 2.0 ml syringe labeled"GAS COMP."___b. OPEN 3SSP-V2036, containment air sample moduleinternal bypass valve.____c. INSERT syringe into needle guide until syringe nut isengaged.1. Do not unscrew syringe body more than 2 turns counterclockwise.

Excessive turns will disengage needle from syringe.2. Steps 4.4.3 d. and e. should be performed rapidly to minimizeexposure.

d. Rapidly DRAW 1 cc gas sample into syringe and TURNsyringe body 2 turns counterclockwise to lock sample insyringe.e. REMOVE syringe from needle guide and PLACE syringeinto syringe transfer container and PLACE lid on syringetransfer container.
f. CLOSE 3SSP-V2036, Containment air sample moduleinternal bypass valve.4.4.4 CLOSE cabinet door.Level of Use IContinuousI STOPTHINKCP 3804LACT REVIEW Rev. 00319 of 38 NOTEIf sufficient personnel are available, Sections 4.5 and 4.8 may beperformed simultaneously.

4.4.5 WHEN all samples requested in step 2.1.13 have been retrieved, PERFORM the following:

___ *TRANSPORT samples to laboratory and Go To Section 4.5,"cSample Analysis"

___ Go To Section 4.8, "Restoration from PASS SampleAcquisition"

-End of Section 4.4 -L evel of UseContinuous STOP THINKCP 3804LACT REVIEW Rev. 00320 of 38 4.5 Sample AnalysisHealth 1PhysicsTechnician Chemistry Technician 4.5.1 DETERMINE handling requirements as follows:a. OPEN transport container cover and MEASURE dose rate.b. IF dose rate is greater than or equal to 1 rem/hr, NOTIFYOSC ARIPS and REQUEST instructions for handling.

c. IF dose rate is less than 1 rem/hr, DIRECT Chemistry Technicians to handle samples as normal radioactive samplesand to minimize radiation exposure when performing required analyses.

4.5.2 PERFORM PASS sample analysis as follows:* Refer To the following Sections as applicable andPERFORM analysis:

  • Section 4.6, "Gas Isotopic Analysis"
  • Section 4.7, "Gas Composition Analysis" 4.5.3 WHEN analyses are complete, REPORT results to MRDA orAMRDA.4.5.4 Refer To CP 3804L-O01 and SIGN and DATE "Performed By"section.4.5.5 IFI copies of results are requested, FAX or SEND copies of thefollowing to requesting individuals:
  • Attachment 2* CP 3804L-001 4.5.6 IF Section 4.8, "Restoration from PASS Sample Acquisition,"

hasnot been completed, Go To Section 4.8 and COMPLETE PASSsystem restoration.

-End of Section 4.5 -Level of Use IContinuous STOPTHINKCP 3804LACT REVIEW Rev. 00321 of 38 4.6 Gas Isotopic Analysis_____4.6.1 PLACE 2.5 cm shelf in detector to be used for gas isotopicanalysis.

4.6.2 DETERMINE gas isotopic activity as follows:______a.

Using the following information, Refer To C CP 803.6,"Gamma Spectroscopy Counting System Maintenance andOperation,"

and ANALYZE sample:* Open cave* Applicable geometry for shelf being used* Five minute count time* General library* Sample volume of 0.250 cc* Sample date and time as recorded on CP 3804L-001

b. IF dead time is greater than or equal to 20%, PERFORM thefollowing:
1) ABORT count.2) REPLACE shelf with next higher shelf.3) Go To step 4.6.2.______c.

STORE gas vial in shielded location.

SLevel of Use CP 3804LContinuous STOP THINK ACT REVIEW Rev. 00322 of 38

d. DETERMINE background as follows:1) Using the following information, Refer To C CP 803.6,"Gamma Spectroscopy Counting System Maintenance and Operation,"

and PERFORM background count ondetector that was used for gas isotopic analysis.

  • Open cave* Applicable geometry for shelf that was used* Five minute count time* General library* Sample volume of 0.250 cc2) RECORD all identified isotopes and their associated background activity levels in p.Ci/cc on Attachment 2.e. Refer To Attachment 2 and CALCULATE gas activity asfollows:1) Refer To gas isotopic printout and RECORD allidentified isotopes and their associated activity levels initCi/cc.2) For each isotope listed, SUBTRACT background activityfrom printout activity and RECORD as isotope activity in3) ADD isotope activities and RECORD as gas activity in4) Refer To CP 3804L- 001 and RECORD gas activity inptCi/cc in "Sample Data" table.4.6.3 PLACE empty "GAS ISOTOPIC" syringe in shielded location.

-End of Section 4.6 -LLevel of Use IContinuousI STOP THINKCP 3804LACT REVIEW Rev. 00323 of 38 I ..4.7 Gas Composition AnalysisNOTEThe "GAS COMP" results are for information only and are not used in anysample calculations.

___4.7.1 Refer To C CP 803.12, "Operation and Calibration of the VarianCP-4900 Micro-GC,"

and ANALYZE 2.0 ml syringe labeled"GAS COMP" for the following:

  • % hydrogen* % oxygen* % nitrogen___4.7.2 PLACE empty "GAS COMP" syringe in shielded location.

___4.7.3 WHEN analysis is complete, Refer To CF 3804L-001 andRECORD gas composition results in % in "Sample Data" table.-End of Section 4.7 -ILevel of Use IContinuousI STOP THINKCP 3804LACT REVIEW Rev. 00324 of 38 I -4.8 Restoration from PASS Sample Acquisition NOTEEntry into Section 4.8 may occur at any time during performance ofSections 4.1 through 4.4. Some steps in Section 4.8 may already becompleted depending on the entry point.4.8.1 IF sample flow was achieved at any time during PASS sample,FLUSH PASS system as follows:______a.

IF Section 4.3, "System Flush," has not been performed, PERFORM Section 4.3.______b.

At 3SSP-PNL2, containment air sample remote panel,POSITION 3SSP-V2035 to "SAMPLE."

c. INITIATE nitrogen purge as follows:1) POSITION 3SSP-V112 to "NITROGEN FLUSH."2) POSITION 3SSP-V2037 to "OPEN."3) POSITION 3SSP-V2034 to "ON."___d. RECORD flow rate: l____ pm_____e. WAIT 3 minutes.______f.

POSITION 3SSP-V2037 to "CLOSE."______g.

ChECK that flow rate is less than value recorded instep 4.8.1 d._____h. WAIT 3 minutes.4.8.2 POSITION the following valves as indicated:

_____a. 3SSP-V2034 to "OFF."______b.

3SSP-V112 to "OFF"______c.

3SSP-V2037 to "OPEN."lLevel of Use CP 3804LContinuous STOP THINK ACT REVIEW Rev. 003* 25 of 38 4.8.3 Refer To CP 3804L-002 and ENSURE or INITIAL valve lineupfor valves at 3SSP-PNL2.

4.8.4 CLOSE 3SSP-V53, nitrogen supply to containment air samplePNL2.4.8.5 PUSH "POWER ON" button to de-energize panel.4.8.6 CLOSE and LOCK panel door.4.8.7 PERFORM the following:

a. CLOSE 3HVR-DMP1301, 3SSP-SAS2 exhaust damper[Ref. 6.1].b. Using damper operating tool, CLOSE 3HVR*DMP60, 3SSP-SAS1/SAS2 exhaust isolation damper [Ref. 6.1]Level of UseContinuous STOPTHINKCP 3804LACT REVIEW Rev. 00326 of 38 V CAUTIONIt is imperative not to push in on the hand wheel when operating the following valvesunless SM/US permission is obtained.

This engages the clutch override and couldresult in damage to the valve.Train A Train B3H{CS*V2 3HCS*V6 3SSP*V59 3HCS*V9 3HCS*V13 3SSP*V603H{CS *V3 3SSP *V51 3HCS *V10j 3SSP*V52c. IF hydrogen recombiner train A was Selected in step 2.1.13,PERFORM the following:

1) CLOSE and LOCK the following valves* 3SSP*V51, containment air sample returncross- connect* 3SSP*V59, containment air sample supplycross -connect2) IFF train A hydrogen recombiner is not running, CLOSEand LOCK the following valves:* 3HCS*V2, recombiner 1A supply outer isolation
  • 3HCS*V3, recombiner 1A supply inner isolation
  • 3HCS*V6, recombiner RBNR-1lA return isolation ILevel of UseContinuous STOP THINKCP 3804LACT REVIEW Rev. 00327 of 38 NYNYCAUTIONIt is imperative not to push in on the hand wheel when operating the following valvesunless SM/US permission is obtained.

This engages the clutch override and couldresult in damage to the valve.Train A Train B3HCS*V2 3HCS*V6 3SSP*V59 3HCS*V9 3HCS*V13 3SSP*V603HCS*V3 3SSP*V51 3HCS*V10 3SSP*V52d. liP hydrogen recombiner train B was selected in Step 2.1.13,PERFORM the following:

1) CLOSE and LOCK the following valves* 3SSP*V52, containment air sample returncross -connect___ 3SSP*V60, containment air sample supplycross -connect2) IF train B hydrogen recombiner is not running, CLOSEand LOCK the following valves:___ 3HCS*V9, recombiner lB supply outer isolation

___ 3HCS*V1O, recombiner lB supply inner isolation

  • 3HCS*V13, recombiner RBNR- lB return isolation

___4.8.8 Refer To CP 3804L- 002 and ENSURE remainder of valvelineup.4.8.9 Refer To CP 3804L- 002 and PERFORM.

independent verification of system lineup.ILevel of UseContinuous STOP THINKCP 3804LACT REVIEW Rev. 00328 of 38 NOTEWhen this step is completed, constant communications with the controlroom in Modes 1-4 is no longer required.

______4.8.10 NOTIFY MCRO of the following:

  • IF closed in step 4.8.7 c.2), the following valves are closed Iand locked:* 3HCS*V2, recombiner lA supply outer isolation,
  • 3HCS*V3, recombiner 1A supply inner isolation
  • 3HCS*V6, recombiner RBNR- lA return isolation
  • IF closed in step 4.8.7 d.2), the following valves are closed land locked: I* 3HCS*V9, recombiner lB supply outer isolation
  • 3HCS*V10, recombiner lB supply inner isolation
  • 3HCS*V13, recombiner RBNR-1B return isolation
  • IF in operating Modes 1-4, NOTIFY MCRO that trackingrequirements of Tech Spec surveillance 4.6.1.1.a are nolonger required for valves that were reported closed and I* 3HVR*DMPC0 is closed* IF in operating Modes 1-4, REQUEST MCRO exit LCO3.6.6.2 for 3HVR*DMPC0

[Ref. 6.1].* PASS system is secured.* IF in operating Modes 1-4, REQUEST permission to secureconstant communications with control room______4.8.11 RETURN valve key.______4.8.12 SUBMIT completed CP 3804L-002 to Chemistry Supervision forreview.SLevel of Use CP 3804LContinuous STOP THINK ACT REVIEW Rev. 00329 of 38 4.8.13 IF operational difficulties were encountered, PERFORM one orboth of the following:

  • Refer To WM-AA- 100, "Work Management" andINMTIATE Condition Report for applicable equipment andRECORD CR number on CP 3804L-001

____ *Refer To PI-AA-200, "Corrective Action,"

and INITIATECR and RECORD CR number on CP 3804L-001

____4.8.14 RECORD number of needle punctures for the containment airseptum in PASS log.Step 4.8.15 may not be performed due to the radiation levels in thehydrogen recombiner building.

4.8.15 OBTAIN permission from MOSC and PERFORM the following:

  • IFF containment air septum has been punctured 10 times ormore since its last replacement, Refer To Attachment 3 andREPLACE septum____
  • Refer To CP 3804K Attachment, "PASS Sample Equipment Inventory,"

and INVENTORY PASS sampling equipment and LOCK PASS cabinet door handle___4.8.16 SIGN and DATE "Performed By" block on CP 3804L-001.

4.8.17 SUBMIT the following completed documents to Chemistry Supervision.

___ CP 3804L-001

____ CP 3804K Attachment, "PASS Sample Equipment Inventory" 0Chemistry Supervision 4.8.18 SUBMIT copy of reviewed CP 3804L- 001 and applicable CR's tosystem engineer.

-End of Section 4.8 -Level of Use IContinuousI STOP THINKCP 3804LACT REVIEW Rev. 00330 of 38

5. REVIEW ANDJT SIGNOFF5.1 The review and signoff for this procedure is located in the following attachments and forms:* Attachment 2* Attachment 3* CP 3804L-001
  • CP 3804L-002
6. REFERENCES 6.1 PIR 3-93-021, "SLCRS Boundary Breach"6.2 Technical Manual for Containment Air Post Accident Sample System,"General Dynamics Corporation, Electric Boat Division, Reactor PlantServices6.3 Installation, Operating, and Maintenance Instructions Model MB- 151Post Accident Air Sample Compressor 6.4 Regulatory Guide 1.976.5 Post Accident Sample System Component Instruction Literature 6.6 IINPO Good Practice CT-707, "cPost-Accident Sampling Preparedness" 6.7 NUJREG 07376.8 Millstone DWG. No 12179-EM-155A 6.9 Millstone DWG. No 12179-EM-li5A 6.10 Millstone DWG. No 12179-CP-402001 6.11 Millstone DWG. No 12179-CP-402002 6.12 Millstone DWG. No 12179-CP-402003 6.13 Millstone DWG. No 12179-CP-402004 6.14 Millstone DWG. No 12179-CP-402006 Level of Use cP 3804LContinuous STOP THINK ACT REVIEW Rev. 00331 of 38 6.15 Millstone D~WG. No 12179-CP-402009 6.16 Millstone DWG. No 12179-CP-4020014 6.17 Millstone DWG. No 12179-CP-4020015 6.18 Millstone DWG. No 12179-CP-4020053 6.19 Millstone DWG. No 12179-CP-4020054 6.20 Millstone DWG. No 12179- CP-4020056 6.21 Millstone DWG. No 12179-CP-402700 6.22 Correspondence B11121, "Millstone Nuclear Power Station, Unit No. 3,Response to Chemical Engineering Branch DSER Open Item," datedApril 9, 1984, from Northeast Utilities to the NRC6.23 Correspondence
Bl11177, "Millstone Nuclear Power Station, Unit No. 3,Response to Chemical Engineering Branch DSER Open Item," datedMay 10, 1984, from Northeast Utilities to the NRC6.24 NUJREG-1031, "Safety Evaluation report related to the operation ofMillstone Nuclear Power Station, Unit No. 3," dated August 2, 1984.6.25 DCR M3-98034, "cSetpoint Change to 3GSN-PCV106, 3SSP-PCV80, and 3SSP-PCV82" 6.26 DCN DM3-00-0638-98, "Setpoint Change to 3GSN-PCV1O6, 3SSP-PCV80, and 3SSP-PCV82" 6.27 Engineering Calculation 3SSP -01632-I-3 6.28 NRC, B18443 Dated July 31, 2001.IIL evel of UseContinuous STOPTHINKCP 3804LACT REVIEW Rev. 00332 of 38
7. SUMMARY OF CHANGESSummary of Changes Rev. 0037.1 Performed the following Administrative Corrections to update references:
  • RP 16 replaced by WM-AA- 100* CP 2803/3803P replaced by C CP 803.127.2 Changed instances of VERIFY to CHECK or ENSURE as applicable, norevision bars used.Summary of Changes Rev. 002-027.3 Added prerequisite for the verification of containment temperature beingat or below 170° F.7.4 Removed Note statement on cover page that required document to bereviewed by Nuclear Fuels Safety Analysis.

7.5 Removed references to Technical Specifications and E-Plan in Objective Section and added regulatory commitment B18443-01.

7.6 Removed references to SERO and SERO activation throughout thedocument.

7.7 Changed volume of gas vial from 14.4 cc to 13 cc.7.8 Updated Documents Section and references to su~perseded and cancelled documents throughout.

Summary of Changes Rev. 002-017.9 Editorial Correction; Added Reference 6.28 NRC commitment letter.B18443. AIR #01005693-01.

Summary of Changes Rev. 002-007.10 Added simplified drawing of containment air PASS system.7.11 Added flat-tipped screwdriver and valve wrench to tools andconsumables.

7.12 Deleted "(Obtained from MCRO)" from valve key description.

7.13 Changed basis for 45-50 psig on 3SSP-PCV82 to Engineering Calculation 3SSP-01632-I-3.

Level of Use cP 3804LContinuous STOP THINK ACT REVIEW Rev. 00333 of 38 7.14 Added caution associated with remotely operated valves that haveclutches.

7.15 Added numerous signoffs to substeps.

7.16 Added initial system alignment check and deleted associated steps in bodyof procedure.

7.17 Deleted step to remove counting shelf when counting background.

7.18 Changed steps to allow hydrogen recombiner isolations to remain open ifhydrogen recombiner is running.7.19 Added steps to generate TR and/or CR when operational difficulties areencountered.

7.20 Added bullet to request permission from SM/US prior to securingconstant communications.

7.21 Added requirement to obtain permission from MOSC to changeout septum and inventory PASS equipment.

Added alara above step.7.22 Changed septum changeout frequency to every 10 punctures.

7.23 Added containment air equipment to CP 3804K (Att), "PASS SampleEquipment Inventory,"

and deleted inventory list from this procedure.

Added requirement to lock PASS cabinet door handle when inventory iscompleted.

7.24 Added step to submit PASS inventory to Chemistry Supervision.

7.25 Added step to submit copy of reviewed chemistry form CP 3804L- 001and applicable CR's to system engineer.

7.26 A note was added to the cover page of this procedure to ensure a review isperformed by the Radiological Engineering Services whenevermodifications to this procedure are made that may impact dose limit timeand motion study calculations.

This is in response to AR 99005798-06.

Level of Use CP 3804LContinuousI STOP THINK ACT REVIEW R~ev. 00334 of 38 Attachment 1Initial System Alignment Check(Sheet 1 of 1)I Performed Component ID Description PoiinInitial Date3SSP- PNL23SSP-V2027 Containment air remote module N2 supply OP,isolation valve3SSP-V2029 Containment air remote module N2 stor- CLage tank isolation valve13SSP-V2030 IContainment air remote module N2 stor- CLage tank vent valve3SSP- PCV82 Nitrogen pressure regulator BackedOff~Observe cautionsign at 3SSP-.V46 3SSP-V46 Air sample pump P4 inlet isolation valve OPIPost Accident Sample Module Room3SSP-V2036 Containment air sample module internal CLIbypass valve3SSP-V1 88 3-way divert valve to iodine filter FLT1 BYP3SSP-V1 89 Iodine filter FLT1 outlet isolation valve CL3P-11iodine filter FLT1 inlet isolation valve CLLevel of UseContinuous STOPTHINKCP 3804LACT REVIEW Rev. 00335 of 38 Attachment 2Containment Air Gas Activity Worksheet (Sheet 1 of 1)Printout Activity

-Background

= Isotope ActivityIsotope Printout Activity Background Isotope Activity(2- place accuracy)

(2- place accuracy)

(pCilcc)

(pCi/cc)

(pCi/cc)______ I ______ i ______ I ______4 -I I4 4 14 4 1NOTE: Gas Activity summation ofall isotope activities.

Prepared by:__________

Gas Activity(2-place accuracy)

(pCi/cc)Date:SUBMIT completed attachment to Chemistry Supervision.

Level of Use IContinuousI STOP THINKCP 3804LACT REVIEW Rev. 00336 of 38 Attachment 33SSP- SAS2 Septum Replacement (Sheet 1 of 1)NOTEThe required tools and consumables can be found in the PASS cabinetlocated in the H2recombiner building.

I______2.______3.______4.______5.6.DON protective clothing as directed by Health Physics.Using 1/2" socket, UNSCREW and REMOVE needle guide.IF old septum did not come out with septum holder, REMOVE old septumusing scribe or tweezers.

Using tweezers and septum insertion tool, INSTALL new septum.Using 1/2" socket wrench, INSTALL needle guide.RECORD septum replacement in PASS log.Replaced by:Date:SUBMIT completed attachment to Chemistry Supervision.

SLevel of UseContinuous STOPTHINKCP 3804LACT REVIEW Rev. 00337 of 38 0S0Attachment 4Containment Air PASS Simplified Drawing(Sheet 1 of 1)Suction Line of:Train A Hydrogen Recombiner S ample FromContainment Suction Line of: -p--Train B Hydrogen Recombiner Return Lines of:Train A Hydrogen Recombiner Return ToContainment Return Lines of:.-Train B Hydrogen Recombiner NitrogenFlushLevel of UseContinuous

s-toP-:"

THINKSTOP'HNK AcT. REVIEWCP 3804LRev. 00338 of 38 TPCKOZToFacilityAddress:DOCUMENT CONTROL DESK:MP Department:

U.S. NUCLEAR REGULATORY COMMISSION DOCUMENT CONTROL DESK (0140)WASHINGTON, DC 20555-0001 PASSPORT DOCUMENTTRANSMITTAL Page:Dlillllii D i 11111111111 From : CONTROLLED Date/Time
12/29/15 13:Trans No. : 000153267 Total Items: 00001DOCUMENTS Transmittal Group Id: 1511845Item Facility Type Sub Document Number/ITitle Sheet Revision Doc Date Copy # Media Copies* 0001 MP PROC CH CP 3804L 003 P 01PASS CONTAINMENT AIR SAMPLEPlease check the appropri~ate response and return form to NDS Bldg 475/3Millstone Power Station or Fax to 860-440-2057.

3 All documents received.

Documents noted above not received (identify those not received).

I olonger require distribution of these documents.

Date:Date:Signature:

I , ,S Dominio-° A dministrative Correction A uthorization CP 3804L -*03PASS Containment Air Sample4. Requestor(s)

Print Name(s) / Locations

5. Date 6. Requestor PhoneGreg D'Auria 12/29/15 45757. Applicable Nuclear Station(s)

Millstone

[] North Anna LI Surry LI8. Please check below to indicate the type of administrative correction needed.[] Updating titles, names, phones numbers, document format, procedure

numbers, or references LI Misspellings (e.g., "adn" instead of "and")LI Incorrect step number sequencer eg. "6.3.1, 6.3.3, 6.3.2" instead of"'6.3.1, 6.3.2, 6.3.3")LI Incorrect page numbers in the headers and attachments (e.g., "PAGE 82 of 80" instead of "PAGE 82 of 82")LI Incorrect pagination, such as incorrect page breaksLii Incorrect transitions,
branches, and references (e.g., referenced procedure has been renumbered)

LI Mistakes occurring during duplication (cloning) of procedures (e.g., Unit 1 panel number, equipment location number, orprocedure number in a Unit 2 procedure)

LI Incorrect equipment location

numbers, if the noun descriptor fits the application LI Incorrect noun descriptor, if the equipment location number is accurateLI Mistakes or computer file corruptions that occurred during the posting process[] Other: Changed instances of VERIFY to CHECK or ENSURE as applicable.

Errors in setpoints, measurements, or quantitative acceptance criteria shall not be considered an administrative correction Authorization for Permanent Administrative Correction

9. Procedure Process Management SignatureA
10. Date11. M'anager Nuclear Operations Signature (Required for E--s FCAs, or FSGs) 12. DateN/AAdministrative Correction Completed By ____________

Jeff D. Urgitis NOTE: The individual(s) posting an Administrat~,e to EDM re responsible for ensuring Nuclear E-Formsis updated.16. Nuclear E-Forms Updated for Site(s)?

17. Nuclear E-Forms Updated Print Namne/Signature
18. DateLIMP LINA LISU M]N/A NIA19. Technical Procedure Number: 20. Revision:
21. Effective I~ate.cP 3804. 003/iForm No. 730689(May 2015)

MILLSTONE POWER STATIONCHEMISTRY PROCEDURE STOPTHINKAii¸i¸ RE'IEPASS Containment Air Sample 6.28]CP 3804LRev. 003NOTEA review by the Emergency Planning Department is required whenever this procedure isrevised or whenever changes are made to this procedure which impact the ability tocollect and analyze a PASS sample.Apprval DatUe:EffetiveuDate 12/29/1512/29/15Level of UseContinuous Millstone Unit 3Chemistry Procedure PASS Containment Air SampleTABLE OF CONTENTS1. PURPOSE..................................................

22. PREREQUISITES

...........................................

23. PRECAUTIONS

.............................................

74. JINSTRUCTIONS

............................................

84.1 Preparation for PASS Sample Acquisition

.....................

84.2 Sample Acquisition.....................................

154.3 System Flush Prior To Sample Retrieval

.....................

174.4 Retrieval of Containment Air Samples ......................

184.5 Sample Analysis........................................

214.6 Gas Isotopic Analysis....................................

224.7 Gas Composition Analysis

...............................

244.8 Restoration from PASS Sample Acquisition

..................

255. REVIEW AND4T SIGNOFF.............

........................

316. REFERENCES

.............................................

317. SUMMARY OF CHANGES ...................................

33ATTACHMENTS ANT) FORMSAttachment 1, "Initial System Alignment Check" ...................

35Attachment 2, "Gas Activity Worksheet"

..........................

36Attachment 3, "C3SSP-SAS2 Septum Replacement"

..................

37Attachment 4, "Containment Air PASS Simplified Drawing".

..........

38CP 3804L-OO1,"PASS Containment Air Sample Data"CP 3804L-OO2,"PASS Containment Air Sample Restoration Lineup"Level of Use CP 3804LContinuous STOP THINK ACT REVIEW Rev. 003

1. PURPOSE1.1 Objective Provide instructions for operation of the Unit 3 containment air postaccident sample system for containment air sample acquisition when high iradioactivity levels, may preclude the normal (conventional) samplingmethod.This procedure satisfies regulatory commitment B 18443-01 to maintaincontingency plans for obtaining and analyzing highly radioactive samplesof the containment atmosphere.

This procedure was developed using the reactor technical manual for thecontainment air PASS (Ref.6.2) and other documents identified herein. I1.2 Discussion If conditions arise that will not allow Sections 4.1 through 4.4 to becompleted, the procedure user will be directed to Section 4.8,"Restoration from PASS Sample Acquisition,"

to return the system tonormal.Attachment 4 contains a simplified drawing of the containment air post iaccident sample system. I1.3 Applicability This procedure is applicable when in-plant radioactivity levels are too ihigh to permit containment air sampling via the normal (conventional)

-@method.1.4 Frequency As required during periods of elevated in-plant levels. E2. PREREOUISITES 2.1 General/ 2.1.1 Heat tracing panel 3HTS-PNLA3 (OP 3352) has been energized for at least 1/2 hour./ 2.1.2 To prevent condensation and iodine plate-out in the samplelines, verify containme~nt temperature is less than or equal to1'70° ELevel of Use CP 3804LContinuous STOP THINK ACT REVIEW Rlev. 0032 of 38 Lee/fUCotna/2.1.3 Key has been obtained to unlock the following:

Train A Train B3SSP*V51 3SSP*V523SSP*V59 3SSP*V603HCS*V2 3HCS*V93HCS*V3 3HCS*V103HCS*V6 3HCS*V132.1.4 Health Physics has been notified that a containment air PASSsample will be taken.2.1.5 Health Physics has evaluated need for RWP.2.1.6 Lab ventilation is operating.

2.1.7 Lead brick shielding has been placed in lab ventilation hood.2.1.8 Computer radioisotopic analysis system in operation andcalibrated.

2.1.9 Gas chromatograph has been set up and calibrated, or calibration has been initiated for PASS containment air sample analysis ifdesired.2.1.10 Proper operation of sample syringes in PASS suitcase has beenverified.

2.1.11 13 cc gas vial has been stoppered and evacuated.

2.1.12 One train of SLCRS in operation.

  • 0STOPTHINKCP 3804LACT REVIEW Rev. 0033 of 38 2.1.13 Manager of Radiological Dose Assessment (MRDA) or theAssistant Manager of Radiological Dose Assessment (AMRDA)has requested a containment air sample to include the following:

Check Reouested Analysis Samnle Eauioment Needed-- --i-- I I[]Gas isotopicEI] Gas composition "GAS ISOTOPIC" syringe,stoppered and evacuated 13 cc gasvial*0"GAS COMP" syringeCheck Sample PointI] Hydrogen Recombiner Train A[] Hydrogen Recombiner Train B2.1.14 Containment Air PASS Team has completed pre-job brief asfollows:*Manager of Operational Support Center (MOSC) -designates, assembles, and briefs the Containment Air PASSTeam for implementation of this procedure o Operational Support Center Assistant Radiological Protection Supervisor (OSC ARPS) with the concurrence of the Managerof Radiological Consequence Assessment (MRCA) -specifies the radiological controls required for implementation of thisprocedure

2.2 Documents

2.2.1 C CP 803.12, "Operation and Calibration of the Varian CP-4900Micro -GC"2.2.2 C CP 803.6, "Gamma Spectroscopy Counting SystemMaintenance and Operation" 2.2.3 CP 3804K Attachment, "PASS Sample Equipment Inventory" 2.2.4 PI-AA- 200, "Corrective Action"2.2.5 WM-AA- 100, "Work Management" 02.2.6 RWIP for PASS sample collection.

2.2.7 Gas sample isotopic printoutLevel of Use IContinuousI STOP THINKCP 3804LACT REVIEW Rev. 0034 of 38

2.3 Personnel

2.3.1 Assistant

Director, Technical Support (ADTS)2.3.2 Manager of Radiological Dose Assessment (MRDA) or Assistant Manager of Radiological Dose Assessment (AMRDA)2.3.3 Manager of Operational Support Center (MOSC)2.3.4 Operational Support Center Assistant Radiological Protection Supervisor (OSC ARPS)2.3.5 Manager of Control Room Operations (MCRO)2.3.6 Manager of Radiological Consequence Assessment (MRCA)2.3.7 Containment Air PASS Team consisting of the following personnel:
  • At least two Chemistry Technicians
  • At least one Health Physics Technician Level of UseContinuous STOP THINK,, CP 3804LACT, REVIEW Rev. 0035 of 38 2.4 Tools and Consumables 2.4.1 Located in Unit 3 Chemistry Lab* 13 cc gas vial* 13 cc gas vial stopper* 24 Lead bricks* PASS transport carto, Syringe transfer container
  • 250 rtl syringe labeled "GAS ISOTOPIC"
  • 2.0 ml syringe labeled "GAS COMP"* Key to 3SSP-PNL2 (Issued to U3 Chemistry personnel)
  • Key to the following valves: ITrain A Train B3SSP*V51 3SSP*V523SSP*V59 3SSP*V603HCS*V2 3HCS*V93HCS*V3 3HCS*V103HCS*V6 3HCS*V13*Watch2.4.2 Located in PASS Cabinet in 112 Recombiner Building I* Spare syringe needles* 3SSP-SAS2 septums* 1/2" Socket wrench* Phone headset* Scribe* Tweezers* Septum insertion tool* Calculator
  • Damper operating tool* Flat-tipped screwdriver I* Valve wrench I2.5 Responsibilities 2.5.1 The ADTS shall make the decision to obtain a sample usingPASS.2.5.2 The Manager of Operational Support Center designates, assembles and briefs the PASS team.ILevel of Use [ "CP 3804LContinuousI STOP THINK ACT REVIEW' Rev. 003* .. """ 6 of 38 2.5.3 The Manager of Radiological Consequence Assessment specifies PASS team radiological controls.

2.5.4 The Operational Support Center Assistant Radiological Protection Supervisor assigns HIP technicians and briefs the PASSteam on radiological conditions.

2.5.5 The Manager of Radiological Dose Assessment or the Assistant Manager of Radiological Dose Assessment specify PASS teamsampling and analysis requirements.

2.6 Definitions

2.6.1 SLCRS -supplementary leak collection and release system2.6.2 CR -Condition Report3. PRECAUTIONS 3.1 The inside of 3SSP-SAS2, containment air sample module, is potentially contaminated.

Proper Health Physics practices and RWP requirements must be followed to prevent the spread of contamination.

3.2 Nitrogen pressures

> 100 psig can damage the tubing in 3SSP-PNL2.

L evel of UseContinuous STOPTHINKCP 3804LACT REVIEW Rev. 0037 of 38

4. INSTRUCTIONS 4.1 Preparation for PASS Sample Acquisition 4.1.1 PERFORM the following and INITIAL CP 3804L-001:
  • ENSURE "General Prerequisites" have been completed
  • REVIEW Section 3, "Precautions"

____4.1.2 IF during performance of Sections 4.1 through 4.8 anyoperational problems are encountered, RECORD notedproblems on CP 3804L- 001._____4.1.3 IF during performance of Sections 4.1 through 4.4, operational problems are encountered that will not allow sampling to becompleted, Go To Section 4.8, "Restoration from PASS SampleAcquisition."

_____4.1.4 PROCEED to containment air sample module with the following:

  • Stoppered and evacuated 14.4 cc gas vial* Key to 3SSP-PNL2 (Issued to U3 Chemistry personnel)
  • Key to the following valves:Train A Train B3SSP*V51 3SSP*V523SSP*V59 3SSP*VC03HCS*V2 3HCS*V93HCS*V3 3HCS*V103HCS*V6 3HCS*V13* Watch* CP 3804L-001 and CP 3804L-002
  • Syringe transfer container

___4.1.5 UNLOCK 3SSP-PNL2, containment air sample remote panel._____4.1.6 Refer To Attachment 1 and CHECK system alignment.

Level of Use cP 3804LContinuous STOP THINK ACT REVIEW Rev. 003 4.1.7 NOTIFY MCRO of the following:

a. 3HVR*DMP60 will be openedb. IF in operating Modes 1-4, Enter LCO 3.6.6.2 for3HVR*DMP60

[Ref. 6.1]c. PERFORM one of the following:

1) IF hydrogen recombiner train A was selected instep 2.1.13, NOTIFY MCRO that the following valveswill be opened if not already open:* 3HCS*V2, recombiner lA supply outer isolation
  • 3HCS*V3, recombiner lA supply inner isolation
  • 3HCS*V6, recombiner RBNR- 1A return isolation
2) IF hydrogen recombiner train B was selected instep 2.1.13, NOTIFY MCRO that the following valveswill be opened if not already open:* 3HCS*V9, recombiner lB supply outer isolation
  • 3HCS*V1O, recombiner 1B supply inner isolation
  • 3HCS*V13, recombiner RBNR-1lB return isolation
d. IF in operating Modes 1-4, Track Tech Spec surveillance requirements of 4.6.1.1.a for the valves opened in step 4.1.7 c.NOTEConstant commnunications with the control room are required when3HCS*V2, 3HCS*V3, 3HCS*V6, 3HCS*V9, 3HCS*V10, or 3HCS*V13are opened in Modes 1-4.___4.1.8 IF in operating Modes 1-4, DON phone headset andESTABLISH communications with Control Room.L evel of UseContinuous STOPTHINKCP 3804LACT REVIEW Rev. 0039 of 38 IO4.1.9 PERFORM the following:
a. Using damper operating tool, OPEN 3HVR*DMP60, 3SSP- SAS1/SAS2 exhaust isolation damper [Ref. 6.1]b. OPEN 3HVR-DMP1301, 3SSP-SAS2 exhaust damper[Ref. 6.1].4.1.10 PERFORM the following at 3SSP-PNL2, containment airsample remote panel:a. ZERO timer.b. PUSH and HOLD "POWER ON" button for 1 to 2 secondsto energize remote operating module and RECORD time:INOTEA lit fuse indicator light indicates the fuse is blown.____c. CHECK line fuses and blower fuse indicator lights are not lit.___d. OPEN 3SSP-V53, nitrogen supply to containment airsample PNL2.NOTE3SSP-PCV82 may require periodic adjustment to maintain 45.-50 psigoutlet pressure.

Nitrogen pressures

> 100 psig can damage the tubing in 3SSP-PNL2.

e. ADJUST 3SSP-PCV82, nitrogen pressure regulator, to45-50 psig.Level of UseContinuous STOP THINKCP 3804LACT REVIEW Rev. 00310 of 38

~ALARAThe inside of 3SSP-SAS2, containment air sample module, is potentially contaminated.

Proper Health Physics practices and RWP requirements must be followed to prevent the spread of contamination.

____4.1.11 At 3SSP-SAS2, containment air sample module, CHECKexhaust fan is running.4.1.12 IF exhaust fan is not running, PERFORM the following at3SSP-PNL2, containment air sample remote panel:____a. PUSH "POWER ON" button to de-energize panel.____b. PUSH and HOLD "POWER ON" button for 1 to 2 secondsto energize remote operating module and RECORD time:____c. At 3SSP-SAS2, containment air sample module, CHECKexhaust fan is running.____d. IF exhaust fan is not running, NOTIFY MOSC.ILevel of Use IContinuousI STOP THINKCP 3804LACT REVIEW Rev. 00311 of 38 I .NOTEIf hydrogen recombiner train A is running, the following valves will alreadybe open:* 3HCS*V2, recombiner 1A supply outer isolation

  • 3HCS*V3, recombiner 1A supply inner isolation
  • 3HCS*V6, recombiner RBNR- lA return isolation N/CAUTIONVIt is imperative not to push in on the hand wheel when operating the following valvesunless SM/US permission is obtained.

-This engages the clutch override and couldresult in damage to the valve.Train A Train B3HCS*V2 3HCS*V6 3SSP*V59 3HCS*V9 3FHCS*V13 3SSP*V603IICS*V3 3SSP*V51 3HCS*V10 3SSP*V524.1.13 IF hydrogen recombiner train Awas selected in step 2.1.13,UNLOCK and OPEN the following valves:* 3HCS*V2, recombiner lA supply outer isolation

  • 3HCS*V3, recombiner 1A supply inner isolation
  • 3HCS*V6, recombiner RBNR- lA return isolation
  • 3SSP*V51, containment air sample return cross-connect
  • 3SSP*V59, containment air sample supply cross-connect L evel of UseContinuous STOPTHINKCP 3804LACT REVI EW Rev. 00312 of 38 V CAUTIONIt is imperative not to push in on the hand wheel when operating the following valvesunless SM/US permission is obtained.

This engages the clutch override and couldresult in damage to the valve.Train A Train B3HCS*V2 3HCS*V6 3SSP*V59 3HCS*V9 3HCS*V13 3SSP*V603HCS*V3 3SSP*V51 3HCS*V10 3SSP*V52NOTEIf hydrogen recombiner train B is running, the following valves will alreadybe open:* 31{CS*V9, recombiner lB supply outer isolation

  • 3HCS*V10, recombiner lB supply inner isolation
  • 311CS*V13, recombiner RBNR-1B return isolation 4.1.14 IF hydrogen recombiner train B was selected in step 2.1.13,UNLOCK and OPEN the following valves:* 3HCS*V9, recombiner lB supply outer isolation

____ 3I-CS*V10, recombiner lB supply inner isolation

___

  • 3HCS*V13, recombiner RBNIR-1B return isolation
  • 3SSP*V52, containment air sample return cross-connect
  • 3SSP*V60, containment air sample supply cross-connect 4.1.15 At 3SSP-PNL2, containment air sample remote panel,POSITION the following valves as indicated:

___a. 3SSP-V2037 to "OPEN."____ b. 3SSP-V2035 to "SAMPLE."

c. 3SSP-V112 to "01FF."d. 3SSP-V2034 to "OFF."Level of Use CP 3804LContinuous[

STOP THINK ACT REVIEW Rev. 00313 of 38 hAALARA3SSP-PNL2, containment air sample remote panel, requires a 15 minutewarm-up period. The time that the instrument was energized is recordedon Chem Form 3804L- 1. The PASS Team Health Physics Technician willdetermine the best location to wait for the completion of the warm-up.___4.1.16 REQUEST Health Physics Technician determine mostappropriate location to wait for completion of 15 minutewarm-up of 3SSP-PNL2, containment air sample remote panel.-End of Section 4.1 -Level of Use IContinuousI STOP THINKCP 3804LACT REVIEW Rev. 00314 of 38 4.2 Sample Acquisition

____4.2.1 Refer To step 4.1.10 b. or step 4.1.12 b. and ENSURE 15 minutewarm-up of 3SSP-PNL2, containment air sample remote panel,is complete.

____4.2.2 Refer To CF 3804L- 001 and MARK box corresponding tohydrogen recombiner train being sampled.____4.2.3 At 3SSP-PNL2, containment air sample remote panel,POSITION 3SSP-V112 to "SAMPLE INFLUENT."

4.2.4 At 3SSP*PNL3, post accident sample panel, PERFORM thefollowing:

___a. ROTATE 'AIlR SAMPLE PUMP P4 SPEED CONTROL'knob fully clockwise.

____b. PUSH SAMPLE PUMP P4" start button to start3SSP-P4____ ~4.2.5 RECORD time purge started:

_________4.2.6 At 3SSP-PNL2, containment airsample remote panel, RECORD flow rate: l_____ pm____4.2.7 PERFORM the following calculation to determine purge time inminutes.Purge time =220 / purge flow rate in 1pmPurge time = 220 / l_____pm

=______minutes 4.2.8 WHEN purge time has passed, ISOLATE sample as follows:____a. At 3SSP*PNL3, post accident sample panel, ADJUST3SSP-P4 speed control to achieve a sample flow rate of 10 to121lpm indicated on 3SSP-PNL2, containment air sampleremote panel.____b. At 3SSP-PNL2, containment air sample remote panel,RECORD flow rate: _____pm____c. POSITION 3SSP-V2037 to "CLOSE."Level of Use cF 3804LContinuous STOP THINK ACT REVIEW Rev. 00315 of 38

d. CHECK that flow rate is less than value recorded instep 4.2.8 b.e. WAIT 1 minute.f. POSITION 3SSP-V2035 to "BYPASS AND FLUSH."g. Refer To CF 3804L-001 and RECORD sample date andtime.h. POSITION 3SSP-V112 to "OFF."4.2.9 At 3SSP*PNL3, post accident sample panel, PUSH "AIRSAMPLE PUMP P4" stop button to stop 3SSP-P4.-End of Section 4.2 -Level of UseContinuousI STOP THINKCF 3804LACT REVIEW Rev. 00316 of 38 4.3 System Flush Prior To Sample Retrieval 4.3.1 At 3SSP-PNL2, containment air sample remote panel,INITIATE nitrogen purge as follows:a. POSITION the following valves as indicated:
1) 35SFP-V112 to "NITROGEN FLUSH."2) 3SSP-V2037 to "OPEN."3) 3SSP-V2034 to "CON."___b. RECORD flow rate: l____ pm_____c. WAIT 3 minutes.______d.

POSITION 3SSP-V2037 to "CLOSE."______e.

CHECK that flow rate is less than value recorded instep 4.3.1 b._____f. WAIT 3 minutes.g. POSITION the following valves as indicated:

1) 3SSP-V2034 to "OFF."2) 3SSP-V112 to "OFF."3) 3SSP-V2037 to "OPEN."lHealth 4.3.2 Based on radiation reading in sample module room, DIRECTTehnsician Chemistry Technicians to perform one of the foloig____ Go To step 4.3.1 and REPEAT flush* Go To Section 4.4 and retrieve samples-End of Section 4.3 -ILevel of UseContinuous STOPTHINKCP 3804LACT REVIEW Rev. 00317 of 38 4.4 Retrieval of Containment Air Samples4.4.1 At 3SSP-SAS2, containment air sample module, OPEN cabinetdoor.4.4.2 IF gas isotopic sample was requested in step 2.1.13, PERFORMthe following:
a. ENSURE needle is screwed fully into 250 [1 syringe labeled"GAS ISOTOPIC."

NOTEI 3ssP-v2036 is open when handle is inline with needle guide.b. OPEN 3SSP-V2036, containment air sample moduleinternal bypass valve.c. INSERT syringe into needle guide until syringe nut isengaged.~ALARA1. Do not unscrew syringe body more than 2 turns counterclockwise.

Excessive turns will disengage needle from syringe.2. Steps 4.4.2 d. through g. should be performed rapidly to minimizeexposure.

d. Rapidly DRAW 250 gas sample into syringe and TURNsyringe body 2 turns counterclockwise to lock sample insyringe.e. REMOVE syringe from needle guide and INSERT needleinto stoppered 13 cc gas vial.f. HOLD syringe tip and TURN syringe body 2 turns clockwise to unlock syringe and INJECT contents of syringe intostoppered 13 cc gas vial.g. PLACE syringe and gas vial into syringe transfer container and PLACE lid on syringe transfer container.

E0E0Level of Use [Continuous STOP THINKCP 3804LACT REVIEW Rev. 00318 of 38

____h. CLOSE 3SSP-V2036, containment air sample moduleinternal bypass valve.4.4.3 lI__ gas composition sample was requested in step 2.1.13,PERFORM the following:

____a. ENSURE needle is screwed fully into 2.0 ml syringe labeled"GAS COMP."___b. OPEN 3SSP-V2036, containment air sample moduleinternal bypass valve.____c. INSERT syringe into needle guide until syringe nut isengaged.1. Do not unscrew syringe body more than 2 turns counterclockwise.

Excessive turns will disengage needle from syringe.2. Steps 4.4.3 d. and e. should be performed rapidly to minimizeexposure.

d. Rapidly DRAW 1 cc gas sample into syringe and TURNsyringe body 2 turns counterclockwise to lock sample insyringe.e. REMOVE syringe from needle guide and PLACE syringeinto syringe transfer container and PLACE lid on syringetransfer container.
f. CLOSE 3SSP-V2036, Containment air sample moduleinternal bypass valve.4.4.4 CLOSE cabinet door.Level of Use IContinuousI STOPTHINKCP 3804LACT REVIEW Rev. 00319 of 38 NOTEIf sufficient personnel are available, Sections 4.5 and 4.8 may beperformed simultaneously.

4.4.5 WHEN all samples requested in step 2.1.13 have been retrieved, PERFORM the following:

___ *TRANSPORT samples to laboratory and Go To Section 4.5,"cSample Analysis"

___ Go To Section 4.8, "Restoration from PASS SampleAcquisition"

-End of Section 4.4 -L evel of UseContinuous STOP THINKCP 3804LACT REVIEW Rev. 00320 of 38 4.5 Sample AnalysisHealth 1PhysicsTechnician Chemistry Technician 4.5.1 DETERMINE handling requirements as follows:a. OPEN transport container cover and MEASURE dose rate.b. IF dose rate is greater than or equal to 1 rem/hr, NOTIFYOSC ARIPS and REQUEST instructions for handling.

c. IF dose rate is less than 1 rem/hr, DIRECT Chemistry Technicians to handle samples as normal radioactive samplesand to minimize radiation exposure when performing required analyses.

4.5.2 PERFORM PASS sample analysis as follows:* Refer To the following Sections as applicable andPERFORM analysis:

  • Section 4.6, "Gas Isotopic Analysis"
  • Section 4.7, "Gas Composition Analysis" 4.5.3 WHEN analyses are complete, REPORT results to MRDA orAMRDA.4.5.4 Refer To CP 3804L-O01 and SIGN and DATE "Performed By"section.4.5.5 IFI copies of results are requested, FAX or SEND copies of thefollowing to requesting individuals:
  • Attachment 2* CP 3804L-001 4.5.6 IF Section 4.8, "Restoration from PASS Sample Acquisition,"

hasnot been completed, Go To Section 4.8 and COMPLETE PASSsystem restoration.

-End of Section 4.5 -Level of Use IContinuous STOPTHINKCP 3804LACT REVIEW Rev. 00321 of 38 4.6 Gas Isotopic Analysis_____4.6.1 PLACE 2.5 cm shelf in detector to be used for gas isotopicanalysis.

4.6.2 DETERMINE gas isotopic activity as follows:______a.

Using the following information, Refer To C CP 803.6,"Gamma Spectroscopy Counting System Maintenance andOperation,"

and ANALYZE sample:* Open cave* Applicable geometry for shelf being used* Five minute count time* General library* Sample volume of 0.250 cc* Sample date and time as recorded on CP 3804L-001

b. IF dead time is greater than or equal to 20%, PERFORM thefollowing:
1) ABORT count.2) REPLACE shelf with next higher shelf.3) Go To step 4.6.2.______c.

STORE gas vial in shielded location.

SLevel of Use CP 3804LContinuous STOP THINK ACT REVIEW Rev. 00322 of 38

d. DETERMINE background as follows:1) Using the following information, Refer To C CP 803.6,"Gamma Spectroscopy Counting System Maintenance and Operation,"

and PERFORM background count ondetector that was used for gas isotopic analysis.

  • Open cave* Applicable geometry for shelf that was used* Five minute count time* General library* Sample volume of 0.250 cc2) RECORD all identified isotopes and their associated background activity levels in p.Ci/cc on Attachment 2.e. Refer To Attachment 2 and CALCULATE gas activity asfollows:1) Refer To gas isotopic printout and RECORD allidentified isotopes and their associated activity levels initCi/cc.2) For each isotope listed, SUBTRACT background activityfrom printout activity and RECORD as isotope activity in3) ADD isotope activities and RECORD as gas activity in4) Refer To CP 3804L- 001 and RECORD gas activity inptCi/cc in "Sample Data" table.4.6.3 PLACE empty "GAS ISOTOPIC" syringe in shielded location.

-End of Section 4.6 -LLevel of Use IContinuousI STOP THINKCP 3804LACT REVIEW Rev. 00323 of 38 I ..4.7 Gas Composition AnalysisNOTEThe "GAS COMP" results are for information only and are not used in anysample calculations.

___4.7.1 Refer To C CP 803.12, "Operation and Calibration of the VarianCP-4900 Micro-GC,"

and ANALYZE 2.0 ml syringe labeled"GAS COMP" for the following:

  • % hydrogen* % oxygen* % nitrogen___4.7.2 PLACE empty "GAS COMP" syringe in shielded location.

___4.7.3 WHEN analysis is complete, Refer To CF 3804L-001 andRECORD gas composition results in % in "Sample Data" table.-End of Section 4.7 -ILevel of Use IContinuousI STOP THINKCP 3804LACT REVIEW Rev. 00324 of 38 I -4.8 Restoration from PASS Sample Acquisition NOTEEntry into Section 4.8 may occur at any time during performance ofSections 4.1 through 4.4. Some steps in Section 4.8 may already becompleted depending on the entry point.4.8.1 IF sample flow was achieved at any time during PASS sample,FLUSH PASS system as follows:______a.

IF Section 4.3, "System Flush," has not been performed, PERFORM Section 4.3.______b.

At 3SSP-PNL2, containment air sample remote panel,POSITION 3SSP-V2035 to "SAMPLE."

c. INITIATE nitrogen purge as follows:1) POSITION 3SSP-V112 to "NITROGEN FLUSH."2) POSITION 3SSP-V2037 to "OPEN."3) POSITION 3SSP-V2034 to "ON."___d. RECORD flow rate: l____ pm_____e. WAIT 3 minutes.______f.

POSITION 3SSP-V2037 to "CLOSE."______g.

ChECK that flow rate is less than value recorded instep 4.8.1 d._____h. WAIT 3 minutes.4.8.2 POSITION the following valves as indicated:

_____a. 3SSP-V2034 to "OFF."______b.

3SSP-V112 to "OFF"______c.

3SSP-V2037 to "OPEN."lLevel of Use CP 3804LContinuous STOP THINK ACT REVIEW Rev. 003* 25 of 38 4.8.3 Refer To CP 3804L-002 and ENSURE or INITIAL valve lineupfor valves at 3SSP-PNL2.

4.8.4 CLOSE 3SSP-V53, nitrogen supply to containment air samplePNL2.4.8.5 PUSH "POWER ON" button to de-energize panel.4.8.6 CLOSE and LOCK panel door.4.8.7 PERFORM the following:

a. CLOSE 3HVR-DMP1301, 3SSP-SAS2 exhaust damper[Ref. 6.1].b. Using damper operating tool, CLOSE 3HVR*DMP60, 3SSP-SAS1/SAS2 exhaust isolation damper [Ref. 6.1]Level of UseContinuous STOPTHINKCP 3804LACT REVIEW Rev. 00326 of 38 V CAUTIONIt is imperative not to push in on the hand wheel when operating the following valvesunless SM/US permission is obtained.

This engages the clutch override and couldresult in damage to the valve.Train A Train B3H{CS*V2 3HCS*V6 3SSP*V59 3HCS*V9 3HCS*V13 3SSP*V603H{CS *V3 3SSP *V51 3HCS *V10j 3SSP*V52c. IF hydrogen recombiner train A was Selected in step 2.1.13,PERFORM the following:

1) CLOSE and LOCK the following valves* 3SSP*V51, containment air sample returncross- connect* 3SSP*V59, containment air sample supplycross -connect2) IFF train A hydrogen recombiner is not running, CLOSEand LOCK the following valves:* 3HCS*V2, recombiner 1A supply outer isolation
  • 3HCS*V3, recombiner 1A supply inner isolation
  • 3HCS*V6, recombiner RBNR-1lA return isolation ILevel of UseContinuous STOP THINKCP 3804LACT REVIEW Rev. 00327 of 38 NYNYCAUTIONIt is imperative not to push in on the hand wheel when operating the following valvesunless SM/US permission is obtained.

This engages the clutch override and couldresult in damage to the valve.Train A Train B3HCS*V2 3HCS*V6 3SSP*V59 3HCS*V9 3HCS*V13 3SSP*V603HCS*V3 3SSP*V51 3HCS*V10 3SSP*V52d. liP hydrogen recombiner train B was selected in Step 2.1.13,PERFORM the following:

1) CLOSE and LOCK the following valves* 3SSP*V52, containment air sample returncross -connect___ 3SSP*V60, containment air sample supplycross -connect2) IF train B hydrogen recombiner is not running, CLOSEand LOCK the following valves:___ 3HCS*V9, recombiner lB supply outer isolation

___ 3HCS*V1O, recombiner lB supply inner isolation

  • 3HCS*V13, recombiner RBNR- lB return isolation

___4.8.8 Refer To CP 3804L- 002 and ENSURE remainder of valvelineup.4.8.9 Refer To CP 3804L- 002 and PERFORM.

independent verification of system lineup.ILevel of UseContinuous STOP THINKCP 3804LACT REVIEW Rev. 00328 of 38 NOTEWhen this step is completed, constant communications with the controlroom in Modes 1-4 is no longer required.

______4.8.10 NOTIFY MCRO of the following:

  • IF closed in step 4.8.7 c.2), the following valves are closed Iand locked:* 3HCS*V2, recombiner lA supply outer isolation,
  • 3HCS*V3, recombiner 1A supply inner isolation
  • 3HCS*V6, recombiner RBNR- lA return isolation
  • IF closed in step 4.8.7 d.2), the following valves are closed land locked: I* 3HCS*V9, recombiner lB supply outer isolation
  • 3HCS*V10, recombiner lB supply inner isolation
  • 3HCS*V13, recombiner RBNR-1B return isolation
  • IF in operating Modes 1-4, NOTIFY MCRO that trackingrequirements of Tech Spec surveillance 4.6.1.1.a are nolonger required for valves that were reported closed and I* 3HVR*DMPC0 is closed* IF in operating Modes 1-4, REQUEST MCRO exit LCO3.6.6.2 for 3HVR*DMPC0

[Ref. 6.1].* PASS system is secured.* IF in operating Modes 1-4, REQUEST permission to secureconstant communications with control room______4.8.11 RETURN valve key.______4.8.12 SUBMIT completed CP 3804L-002 to Chemistry Supervision forreview.SLevel of Use CP 3804LContinuous STOP THINK ACT REVIEW Rev. 00329 of 38 4.8.13 IF operational difficulties were encountered, PERFORM one orboth of the following:

  • Refer To WM-AA- 100, "Work Management" andINMTIATE Condition Report for applicable equipment andRECORD CR number on CP 3804L-001

____ *Refer To PI-AA-200, "Corrective Action,"

and INITIATECR and RECORD CR number on CP 3804L-001

____4.8.14 RECORD number of needle punctures for the containment airseptum in PASS log.Step 4.8.15 may not be performed due to the radiation levels in thehydrogen recombiner building.

4.8.15 OBTAIN permission from MOSC and PERFORM the following:

  • IFF containment air septum has been punctured 10 times ormore since its last replacement, Refer To Attachment 3 andREPLACE septum____
  • Refer To CP 3804K Attachment, "PASS Sample Equipment Inventory,"

and INVENTORY PASS sampling equipment and LOCK PASS cabinet door handle___4.8.16 SIGN and DATE "Performed By" block on CP 3804L-001.

4.8.17 SUBMIT the following completed documents to Chemistry Supervision.

___ CP 3804L-001

____ CP 3804K Attachment, "PASS Sample Equipment Inventory" 0Chemistry Supervision 4.8.18 SUBMIT copy of reviewed CP 3804L- 001 and applicable CR's tosystem engineer.

-End of Section 4.8 -Level of Use IContinuousI STOP THINKCP 3804LACT REVIEW Rev. 00330 of 38

5. REVIEW ANDJT SIGNOFF5.1 The review and signoff for this procedure is located in the following attachments and forms:* Attachment 2* Attachment 3* CP 3804L-001
  • CP 3804L-002
6. REFERENCES 6.1 PIR 3-93-021, "SLCRS Boundary Breach"6.2 Technical Manual for Containment Air Post Accident Sample System,"General Dynamics Corporation, Electric Boat Division, Reactor PlantServices6.3 Installation, Operating, and Maintenance Instructions Model MB- 151Post Accident Air Sample Compressor 6.4 Regulatory Guide 1.976.5 Post Accident Sample System Component Instruction Literature 6.6 IINPO Good Practice CT-707, "cPost-Accident Sampling Preparedness" 6.7 NUJREG 07376.8 Millstone DWG. No 12179-EM-155A 6.9 Millstone DWG. No 12179-EM-li5A 6.10 Millstone DWG. No 12179-CP-402001 6.11 Millstone DWG. No 12179-CP-402002 6.12 Millstone DWG. No 12179-CP-402003 6.13 Millstone DWG. No 12179-CP-402004 6.14 Millstone DWG. No 12179-CP-402006 Level of Use cP 3804LContinuous STOP THINK ACT REVIEW Rev. 00331 of 38 6.15 Millstone D~WG. No 12179-CP-402009 6.16 Millstone DWG. No 12179-CP-4020014 6.17 Millstone DWG. No 12179-CP-4020015 6.18 Millstone DWG. No 12179-CP-4020053 6.19 Millstone DWG. No 12179-CP-4020054 6.20 Millstone DWG. No 12179- CP-4020056 6.21 Millstone DWG. No 12179-CP-402700 6.22 Correspondence B11121, "Millstone Nuclear Power Station, Unit No. 3,Response to Chemical Engineering Branch DSER Open Item," datedApril 9, 1984, from Northeast Utilities to the NRC6.23 Correspondence
Bl11177, "Millstone Nuclear Power Station, Unit No. 3,Response to Chemical Engineering Branch DSER Open Item," datedMay 10, 1984, from Northeast Utilities to the NRC6.24 NUJREG-1031, "Safety Evaluation report related to the operation ofMillstone Nuclear Power Station, Unit No. 3," dated August 2, 1984.6.25 DCR M3-98034, "cSetpoint Change to 3GSN-PCV106, 3SSP-PCV80, and 3SSP-PCV82" 6.26 DCN DM3-00-0638-98, "Setpoint Change to 3GSN-PCV1O6, 3SSP-PCV80, and 3SSP-PCV82" 6.27 Engineering Calculation 3SSP -01632-I-3 6.28 NRC, B18443 Dated July 31, 2001.IIL evel of UseContinuous STOPTHINKCP 3804LACT REVIEW Rev. 00332 of 38
7. SUMMARY OF CHANGESSummary of Changes Rev. 0037.1 Performed the following Administrative Corrections to update references:
  • RP 16 replaced by WM-AA- 100* CP 2803/3803P replaced by C CP 803.127.2 Changed instances of VERIFY to CHECK or ENSURE as applicable, norevision bars used.Summary of Changes Rev. 002-027.3 Added prerequisite for the verification of containment temperature beingat or below 170° F.7.4 Removed Note statement on cover page that required document to bereviewed by Nuclear Fuels Safety Analysis.

7.5 Removed references to Technical Specifications and E-Plan in Objective Section and added regulatory commitment B18443-01.

7.6 Removed references to SERO and SERO activation throughout thedocument.

7.7 Changed volume of gas vial from 14.4 cc to 13 cc.7.8 Updated Documents Section and references to su~perseded and cancelled documents throughout.

Summary of Changes Rev. 002-017.9 Editorial Correction; Added Reference 6.28 NRC commitment letter.B18443. AIR #01005693-01.

Summary of Changes Rev. 002-007.10 Added simplified drawing of containment air PASS system.7.11 Added flat-tipped screwdriver and valve wrench to tools andconsumables.

7.12 Deleted "(Obtained from MCRO)" from valve key description.

7.13 Changed basis for 45-50 psig on 3SSP-PCV82 to Engineering Calculation 3SSP-01632-I-3.

Level of Use cP 3804LContinuous STOP THINK ACT REVIEW Rev. 00333 of 38 7.14 Added caution associated with remotely operated valves that haveclutches.

7.15 Added numerous signoffs to substeps.

7.16 Added initial system alignment check and deleted associated steps in bodyof procedure.

7.17 Deleted step to remove counting shelf when counting background.

7.18 Changed steps to allow hydrogen recombiner isolations to remain open ifhydrogen recombiner is running.7.19 Added steps to generate TR and/or CR when operational difficulties areencountered.

7.20 Added bullet to request permission from SM/US prior to securingconstant communications.

7.21 Added requirement to obtain permission from MOSC to changeout septum and inventory PASS equipment.

Added alara above step.7.22 Changed septum changeout frequency to every 10 punctures.

7.23 Added containment air equipment to CP 3804K (Att), "PASS SampleEquipment Inventory,"

and deleted inventory list from this procedure.

Added requirement to lock PASS cabinet door handle when inventory iscompleted.

7.24 Added step to submit PASS inventory to Chemistry Supervision.

7.25 Added step to submit copy of reviewed chemistry form CP 3804L- 001and applicable CR's to system engineer.

7.26 A note was added to the cover page of this procedure to ensure a review isperformed by the Radiological Engineering Services whenevermodifications to this procedure are made that may impact dose limit timeand motion study calculations.

This is in response to AR 99005798-06.

Level of Use CP 3804LContinuousI STOP THINK ACT REVIEW R~ev. 00334 of 38 Attachment 1Initial System Alignment Check(Sheet 1 of 1)I Performed Component ID Description PoiinInitial Date3SSP- PNL23SSP-V2027 Containment air remote module N2 supply OP,isolation valve3SSP-V2029 Containment air remote module N2 stor- CLage tank isolation valve13SSP-V2030 IContainment air remote module N2 stor- CLage tank vent valve3SSP- PCV82 Nitrogen pressure regulator BackedOff~Observe cautionsign at 3SSP-.V46 3SSP-V46 Air sample pump P4 inlet isolation valve OPIPost Accident Sample Module Room3SSP-V2036 Containment air sample module internal CLIbypass valve3SSP-V1 88 3-way divert valve to iodine filter FLT1 BYP3SSP-V1 89 Iodine filter FLT1 outlet isolation valve CL3P-11iodine filter FLT1 inlet isolation valve CLLevel of UseContinuous STOPTHINKCP 3804LACT REVIEW Rev. 00335 of 38 Attachment 2Containment Air Gas Activity Worksheet (Sheet 1 of 1)Printout Activity

-Background

= Isotope ActivityIsotope Printout Activity Background Isotope Activity(2- place accuracy)

(2- place accuracy)

(pCilcc)

(pCi/cc)

(pCi/cc)______ I ______ i ______ I ______4 -I I4 4 14 4 1NOTE: Gas Activity summation ofall isotope activities.

Prepared by:__________

Gas Activity(2-place accuracy)

(pCi/cc)Date:SUBMIT completed attachment to Chemistry Supervision.

Level of Use IContinuousI STOP THINKCP 3804LACT REVIEW Rev. 00336 of 38 Attachment 33SSP- SAS2 Septum Replacement (Sheet 1 of 1)NOTEThe required tools and consumables can be found in the PASS cabinetlocated in the H2recombiner building.

I______2.______3.______4.______5.6.DON protective clothing as directed by Health Physics.Using 1/2" socket, UNSCREW and REMOVE needle guide.IF old septum did not come out with septum holder, REMOVE old septumusing scribe or tweezers.

Using tweezers and septum insertion tool, INSTALL new septum.Using 1/2" socket wrench, INSTALL needle guide.RECORD septum replacement in PASS log.Replaced by:Date:SUBMIT completed attachment to Chemistry Supervision.

SLevel of UseContinuous STOPTHINKCP 3804LACT REVIEW Rev. 00337 of 38 0S0Attachment 4Containment Air PASS Simplified Drawing(Sheet 1 of 1)Suction Line of:Train A Hydrogen Recombiner S ample FromContainment Suction Line of: -p--Train B Hydrogen Recombiner Return Lines of:Train A Hydrogen Recombiner Return ToContainment Return Lines of:.-Train B Hydrogen Recombiner NitrogenFlushLevel of UseContinuous

s-toP-:"

THINKSTOP'HNK AcT. REVIEWCP 3804LRev. 00338 of 38