ML110740442

From kanterella
Jump to navigation Jump to search

Unit 1 & 2, Requests for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue, Severe Weather Response Procedures
ML110740442
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 03/10/2011
From: Price J
Dominion Nuclear Connecticut, Dominion Resources Services, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
10-448A
Download: ML110740442 (3)


Text

Innsbrook Technical Center

_i£ 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 March 10, 2011 10 CFR 26.9 10 CFR 26.205 U.S. Nuclear Regulatory Commission Serial No.

10-448A Attention: Document Control Desk NL&OS/GDM R1 Washington, DC 20555 Docket Nos.

50-245/336/423 50-338/339 50-280/281 License Nos.

DPR-21/65/NPF-49 NPF-4/7 DPR-32/37 DOMINION NUCLEAR CONNECTICUT, INC.

VIRGINIA ELECTRIC AND POWER COMPANY MILLSTONE POWER STATION UNITS 1. 2 AND 3 NORTH ANNA AND SURRY POWER STATIONS UNITS 1 AND 2 REQUESTS FOR EXEMPTION FROM CERTAIN REQUIREMENTS OF THE FITNESS FOR DUTY RULE FOR MANAGING FATIGUE SEVERE WEATHER RESPONSE PROCEDURES By letter dated February 10, 2011, Dominion Nuclear Connecticut, Inc., (DNC) and Virginia Electric and Power Company (Dominion) submitted requests for exemption from the requirements of 10 CFR 26.205(c) and (d) for meeting work hour controls during declarations of severe weather conditions involving tropical storm or hurricane force winds for Millstone Power Station Units 1, 2 and 3 and North Anna and Surry Power Stations Units 1 and 2, respectively.

During a February 24, 2011 telephone conversation with the NRC Project Manager for North Anna Power Station, the NRC requested copies of the Millstone, North Anna and Surry severe weather procedures and the fleet Hurricane Response Plan (Nuclear).

The requested documents are enclosed and include the following:

1. Hurricane Response Plan (Nuclear), Revision 9,
2. Millstone Power Station Common Operating Procedure C OP 200.6, "Storms and Other Hazardous Phenomena (Preparation and Recovery), Rev. 002-03,"
3. Millstone Power Station Abnormal Operating Procedure AOP 2560, "Storms, High Winds and High Tides, Rev. 010-05,"
4. Millstone Power Station Abnormal Operating Procedure AOP 3569, "Severe Weather Conditions, Rev. 016-02,"

Serial Number 10-448A Docket Nos. 50-245/336/423/338/339/280/281 Page 2 of 3

5. Millstone Power Station Functional Administrative Procedure MP-26-EPI-FAP08, Rev. 004, "Evacuation and Assembly,"
6. North Anna Power Station Abnormal Procedure 0-AP-41, "Severe Weather Conditions, Revision 52,"
7. Surry Power Station Abnormal Procedure 0-AP-37.01, "Abnormal Environmental Conditions, Revision 53," and
8. Surry Power Station Operations Checklist OC-21, "Severe Weather Checklist."

If you have any questions or require additional information, please contact Mr. Gary D. Miller at (804) 273-2771.

Sincerely, J. A n rice Vic& Psident-Nuclear Engineering Dominion Nuclear Connecticut, Inc.

Virginia Electric and Power Company Commitments made in this correspondence:

None.

Enclosure:

Hurricane Response Plan (Nuclear) and Severe Weather Procedures cc:-

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, Pennsylvania 19406-1415 U.S. Nuclear Regulatory Commission - Region II Marquis One Tower, NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector Millstone Power Station Units 2 and 3 L. A. Kaufmann U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, Pennsylvania 19406-1415

Serial Number 10-448A Docket Nos. 50-2451336142313381339/2801281 Page 3 of 3 C. J. Sanders NRC Project Manager - Millstone Power Station Units 2 and 3 U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 08 B-3 Rockville, Maryland 20852-2738 S. Giebel NRC Project Manager - Millstone Power Station Unit 1 U. S. Nuclear Regulatory Commission Two White Flint North Mail Stop T-8 F5 11545 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station J. S. Wiebe NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Surry Power Station K. R. Cotton NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738