ML14239A464

From kanterella
Revision as of 22:58, 26 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

August 28, 2014, Public Meeting Slides Concerning San Onofre Nuclear Generating Station (SONGS) Decommisioning Quality Assurance Program
ML14239A464
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/28/2014
From:
Southern California Edison Co
To:
Plant Licensing Branch IV
Wengert T J
References
Download: ML14239A464 (15)


Text

Meeting Agenda Decommissioning San Onofre Nuclear Generating Station Topic Time Introduction 1:30 SONGS Decommissioning Plan/Schedule 1:40 Decommissioning Quality Assurance Plan 2:00 NRC Feedback 2:45 Path Forward 3:15 Summary/ Actions/Conclusion 3:25 2 en 0 z C) en c (I) n 0 3 3 -* tn tn *. -* 0 :::l -* ::l (Q -c. -Q) ::l ..

Introduction Decommissio.ning San Onofre Nuclear Generating Station

  • SONGS is a permanently defueled station transitioning to decommissioning.
  • Quality is an essential cornerstone of what we do at SONGS -SONGS is a 10 CFR 50 Appendix B licensee with an approved Quality Assurance Program (QAP). Going forward SONGS will remain a 1 0 CFR 50 Appendix B licensee with a simplified Decommissioning QAP (DQAP) aligned with plant status and activities.
  • In the face of a changing environment, the SONGS QA program will: -Continue to provide effective oversight of programs and activities that are important to safety. (SAFETY) -Efficiently manage available resources to continue to add value to the decommissioning effort. (STEWARDSHIP) -Establish a clear path from essential decommissioning regulatory requirements to implementing programs and procedures to ensure complete station engagement. (ENGAGEMENT)

Decommissioning San Onofre Nuclear Generiiting Station Decommissioning Plan 20 YEARS OR LESS

  • Major Milestone *y **y** ............ y-* 1 201.-! 201.c I 201s ; 201s 201s Quarter Quarter 131'111 Quarter! ,,. Quartet" I Quarter 3"' Quarter ,.., Quart *** *******-?*******-** ** ** **4----* *******--**-<>--***** *** ***** ***? *** ... r r*** ****l*** ****--r-*** 2016 2017 J 2018 2019 +---....... -r-.. **-*------<,'-y I 2020 '( 2021 2022 1202. 2025 ... "2031 2032 +-+ >r-'* i' ' r******* -';-** y ............... 2033 *******"'\ I i I I PHYSICAL PLANT CHANGES AU Systems drained. 1 temporary power fing j j' ! f I ' I I
  • i ! LICENSE SUBMIJTALS Permanently Emerbency Plan. Permanently Techhicol I i Specifications j ! I I IMPLEMENTATION I ! : IFMPI i !
  • SUBMITTAL l DECOMMISSIONING DCE i __ _ suBMmALS i SUBivjiTTAL I PSDA!R I I I I START DECONTAMINATION & DISMANTLEMENT (D&D) 10 years I 1 r ' SUBMITTAL .JI I ! I I I DRY FUEL STORAGE (DFS) Eng+eering I I . DRY Fl{EL STORAGE -I I PROJEtT IMPLEMENTATION ALL FUEL IN DRY FUEL .. .. L ! I DRY FUEL STORAGE I EXPANSION I 6RY FUEL STORAGE t 'tCANISTER FABRICATION' _! __ _ C f0312011*1-CE'"20 YEAI! OR lW aASE TIME I!CASONA81.! OOLSTOR.h.GE ) __ j I modifcotion I() ISFSI only I .c Any -;-tmoining Stole reQU* menls for unres ric led land use, END OF PLANt 'DECOMMISSIONiNG iDry Fuel Storage: Pad ' Remains) _j

-D) :::J ;;c CD < -* tJ) -* 0 :::J

. Quality Assurance' Plan ChcinQes Decommissioning for Decommissioning San Onofre Nuclear Generating Station

  • Scope of DQAP optimized to fit a permanently defueled facility -Applicability changed due to Systems, Structures and Components (SSCs) reclassification
  • Eliminate Operating Plant QA standards and guides
  • Add Decommissioning Plant QA standards and guides
  • Eliminate redundancies with other SONGS programs
  • Perform 10 CFR 50.54(a) evaluation to identify reduction in commitments DQAP Revision Development Decommissioning San Onofre Nuclear Generating Station
  • SONGS approach for the development of the DQAP was based on an evaluation of QAP changes at previously decommissioned facilities.
  • SONGS focused on Maine Yankee, Zion Station and Humboldt Bay Programs. These programs were selected because of their similarity to SONGS
  • Essentially a single Nuclear Utility -limited corporate involvement and support
  • Concise yet specific quality requirements
  • Well-aligned with the existing structure of SONGS QAP *---*-*---*-**OIC _____ ..__ *--*-*----r..,*-*--****----***---:::::::::::::--..... ..-... ... ,.. _.....,_....,_ .... -......... --.. _._ .. _____ .... __ _ -....... --........... ----*-.. -----------------------o...* ... -.. _w.., .. ,., ___ _ ___ .. _______ _ _________ ..., ___ _ .... _ ... _____ , __ .. *----*-.. .. -...... .. *--*---*---__ .... ______ .... ... -.... ____ _ .,_;t.-ar:..:..::s._,_ .. ,nl =:::.-::::::. --.. --.--.-* .. *----* ::..-:-...::::::-..::.::-=:.:..-:::..:.:=-... -

Decommissioning San Onofre Nuclear Generating Station Regulations

  • SONGS QA Process Standards and Guides Updated FSAR Chapter 1 [ Contains the Quality Assurance Program (QAP) Topical Quality Assurance Manual (TQAM) [ Admlnistrative Document for the Implementation of theQAP SONG Programs and Procedures Decommissioning San Onofre Nuclear Generating Station Regulations ** Streamlining the Process [ Revise CH 17 l..rSARto reference DQAP 1 Standards DQAP TQAM [ Retired Administrative Implementation Document SONG Programs SONG Nuclear Oversight Program and Procedures [ Programs and . reql.lll"ements Decommissioning San Onofre Nuclear Gonorotlng Station Summary Of Significant QAP Changes
  • Eliminate Operating Plant Standards and Guides
  • Include Decommissioning Plant Standards and Guides
  • Streamline QAP to Eliminate Redundancy with other SONGS Programs
  • Revise UFSAR Chapter 17 -Eliminate inclusion of QAP in the UFSAR -Provide a reference to the DQAP -Eliminate the need for the administrative implementation details provided in the SONGS Topical Quality Assurance Manual (TQAM)
  • Remove the Nuclear Oversight Board (NOB) Commitment from the QAP -Strengthen the use of on-site independent senior leadership reviews -Continues to provide the SONGS Chief Nuclear Officer the opportunity to utilize NOB reviews as appropriate.

c (I) z n ::;a 0 0 3 'TI 3 (I) -* (I) c. -* c-o D) ::::s n -* ::::s ............. ccC -* -gtn -n D) c: ::l tn 0 -c 0 0 0 ::::s tn ::3 ..

..

Path Forward Decommissioning San Onofre Nuclear Generating Station August 28, 2014 -Brief the NRC on the SONGS Decommissioning Quality Assurance Program. 4th QTR 2014-Submit New DQAP to the NRC in accordance with 10 CFR 50.54a. 1st QTR 2015 -Implement SONGS DQAP.

)> n ...... -* 0 ::l en c: ........... 0 3 0 3 ::l n tu -c: tA -* 0 ::l en