Attachment 2: Presentation Slides by James Shepherd, NRC from June 11, 2008 Public Meeting with SONGS
ML081930374
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 06/11/2008
From: James Shepherd
NRC/FSME/DWMEP
To:
Shepherd J
Shared Package
ML081930369 List:
References
Download: ML081930374 (19)


Text

Review Of The Partial Site Release For Off-Shore Piping At San Onofre Unit 1 June 11, 2008

Contact:

J. C. Shepherd .

E-mail: james.shepherd@nrc.gov Phone: 301-415-6712

MEETING PURPOSE

  • DISCUSS NRCs REVIEW PROCESS FOR SCEs SUBMITTAL
  • PRESENT SCEs SUBMITTAL DEC.19, 2007 TO RELEASE OFF-SHORE PIPING
  • OBTAIN PUBLIC COMMENTS ON THE PROPOSAL 7/11/2008 2:50 PM 2

NRC Organization COMMISSION OEDO NRR FSME OTHER REGION OTHER DWMEP DNMS DURLD EPPAD OTHER

REGULATIONS

  • 10 CFR 50.83: RELEASE OF PART OF A POWER REACTOR FACILITY FOR UNRESTRICTED USE
  • 10 CFR 20.1402: RADIOLOGICAL CRITERIA FOR UNRESTRICTED USE 7/11/2008 2:50 PM 4

10 CFR 50.83(a)

NUCLEAR POWER REACTOR LICENSEES SEEKING NRC APPROVAL SHALL

1) EVALUATE THE EFFECT OF RELEASING THE PROPERTY TO ENSURE THAT--
i. THE DOSE TO INDIVIDUAL MEMBERS OF THE PUBLIC DOES NOT EXCEED LIMITS ii. NO REDUCTION IN EFFECTIVENESS OF EMERGENCY PLANNING OR SECURITY; 7/11/2008 2:50 PM 5

§50.83(a)(1) (COND) iii. EFFLUENT RELEASES REMAIN WITHIN LICENSE CONDITIONS; iv. ENVIRONMENTAL MONITORING PROGRAM AND OFFSITE DOSE CALCULATION MANUAL REVISED

v. THE SITING CRITERIA OF 10 CFR PART 100 CONTINUE TO BE MET vi. ALL OTHER APPLICABLE STATUTE AND REGULATORY REQUIREMENTS ARE MET 7/11/2008 2:50 PM 6

§50.83(a) (COND)

2) PERFORM AN HISTORICAL SITE ASSESSMENT OF THE RELEASE AREA
3) FOR IMPACTED AREAS, PERFORM SURVEYS TO SHOW COMPLIANCE WITH CRITERIA FOR UNRESTRICTED USE 7/11/2008 2:50 PM 7

§50.83(d)

FOR RELEASE OF IMPACTED AREAS, SUBMIT AN APPLICATION FOR RELEASE OF THE PROPERTY THAT INCLUDES:

1) INFORMATION FROM (b)(1)-(b)(3)

I. RESULTS OF EVALUATIONS FROM (a)(1) - (a)(2)

II. DESCRIPTION OF THE AREA FOR RELEASE 7/11/2008 2:50 PM 8

§50.83(d) (cond)

III. SCHEDULE FOR RELEASE OF PROPERTY IV. RESULTS OF THE § 50.59 EVALUATIONS V. REASONS PREVIOUS EISs BOUND THE ENVIRONMENTAL IMPACTS OF THE PROPOSED RELEASE 7/11/2008 2:50 PM 9

§50.83(d) (cond)

2) METHODS AND RESULTS OF RADIATION SURVEYS TO DEMONSTRATE COMPLIANCE WITH RADIOLOGICAL CRITERIA
3) SUPPLEMENT TO THE ENVIRONMENTAL REPORT, DESCRIBING NEW INFORMATION OR SIGNIFICANT ENVIRONMENTAL CHANGE RESULTING FROM THE PROPOSED RELEASE 7/11/2008 2:50 PM 10

10 CFR 20 SUBPART E

§ 20.1402: RADIOLOGICAL CRITERIA FOR UNRESTRICTED USE RESIDUAL RADIOACTIVITY, DISTINGUISHABLE FROM BACKGROUND, RESULTS IN A TOTAL CALCULATED DOSE TO AN AVERAGE MEMBER OF THE CRITICAL GROUP NOT EXCEEDING 25 MREM (0.25 MSV) PER YEAR 7/11/2008 2:50 PM 11

NRC STEPS IN THE REVIEW

1. ACCEPTANCE REVIEW
a. ALL ITEMS IN STANDARD REVIEW PLAN
b. EVALUATION OF SELECTED SECTIONS
i. LAND USE SCENARIOS ii. RESIDUAL CONCENTRATIONS iii. COMPLIANCE WITH RELEASE CRITERIA
c. ISSUE FEDERAL REGISTER NOTICE 7/11/2008 2:50 PM 12

STEPS IN THE REVIEW (COND)

2. DETAILLED TECHNICAL REVIEW
3. REQUESTS FOR ADDITIONAL INFORMATION, IF NEEDED
4. SAFETY & ENVIRONMENTAL REVIEW 7/11/2008 2:50 PM 13

STEPS IN THE REVIEW (COND)

5. APPROVE BY LICENSE AMENDMENT
a. ISSUE ENVIRONMENTAL ASSESSMENT
b. ISSUE LICENSE AMENDMENT AUTHORIZING PARTIAL SITE RELEASE 7/11/2008 2:50 PM 14

PRINCIPAL AREAS OF FOCUS

  • RELEASE CRITERIA FOR PARTIAL SITE RELEASE.
  • DETAILED PLANS TO DEMONSTRATE COMPLIANCE WITH THE CRITERIA FOR UNRESTRICTED USE.
  • MATERIAL DISPOSAL PLANS, IF ANY.

7/11/2008 2:50 PM 15

STATUS OF §50.83 REVIEW

  • FEDERAL REGISTER NOTICE ISSUED MAY 6, 2008 (73 FR 25053)
  • TECHNICAL REVIEWS STARTED
  • PUBLIC MEETING 11 JUN 08 7/11/2008 2:50 PM 16

PLANNED REVIEW SCHEDULE

  • COMPLETE SAFETY AND ENVIRONMENTAL REVIEW BY DECEMBER
  • ANNOUNCE BY FEDERAL REGISTER NOTICE
  • ISSUE LICENSE AMENDMENT BY EARLY 2009 7/11/2008 2:50 PM 17

Spent Fuel Management

  • Part 50 license to stay in effect until fuel is removed from site (about 2012)
  • Part 72 specifies general license requirements
  • Region III inspects implementation of spent fuel storage system requirements 7/11/2008 2:50 PM 18

NRC Inspection Program

  • Jack Whitten, Chief Nuclear Materials Safety Branch B Division of Nuclear Materials Safety, R IV