Reactor Decommissioning Program Lessons-Learned
.4y
- Ralph Andersen, CHP (NEI)
Sean Bushart, Ph.D (EPRI)
C 2005 Electric Power Research Institute, Inc. All rights reserved.
1
- rt Industry Program
- EPRI
- Document experience and lessons-learned
- Technology development & transfer.
- On-site assessment and technical support oNEI
- Executive oversight & policy development
- Interface with NRC, EPA and Congress
- Resolve generic economic & regulatory issues 0 2005 Electric Power Research Institute, Inc. All rights reserved.
2
Currently for Power Plants in USA
" Decommissioning of closed units proceeding well 2 plants have terminated their licenses
- significant progress at other plants
- transfer of fuel to dry storage completed
- funding appears to be adequate in most cases
- completion of several plant projects in next 1-2 years
" Remaining issues
- Final site characterization
- License termination and site release
- Materials clearance
- Groundwater contamination/ soil remediation 0 2005 Electric Power Research Institute, Inc. All rights reserved.
7 0
7 US Plants in Progress, - fuel in dry storage Maine Yankee 900MW PWR, complete Yankee Rowe 180MW PWR 90% complete San Onofre 1 450MW PWR O
0 Big Rock Point Key EPRI Interactions:
- 2 Technical Workshops
-Hazardous Waste Remediation
-LTP and Final Site Release
,Full System Decon with EPRI DFD process
0 Maine Yankee
.7 Kev EPRI Interactions:
- Technical Workshops
-Radiation Exposure Control
-Final Status Survey
.*Full System Decon with EPRI DFD process
- Experience Summary Report
0 Trojan Kev EPRI Interactions:
- Technical Workshop
-Embedded Piping Removal
- Evaluation of Decommissioning Strategy
- SFP Cleanup and Cooling Report N,
a.
0 Yankee Rowe Key EPRi Interactions:
,*Technical Workshop
-Concrete Removal
- Groundwater Experience Report
Connecticut Yankee Key EPRI Interactions:
eTechnical Workshops
-Final Site Survey and LTP
-Groundwater Management
- Experience Summary Report
0 Rancho Seco Key EPRI Interactions:
- Technical Workshop
-LLW Management
- ALARA Evaluation for Reactor
.Internals Segmentation oExperience Summary Report
- Decommissioning strategy peer review team Post-Phase I Site Boundary
Technology Transfer Focus of EPRI Program Continues Internationally
- Growing membership internationally in the EPRI Program
- UKAEA-Scotland, British Energy, BNG-UK
- EdF-France, SOGIN-Italy, JAPC-Japan, TaiPower-Taiwan
- UNESA (All Spanish Utilities), ENRESA, & Iberinco-Spain
- US technical and regulatory experiences are invaluable to ALL members New technologies/experiences being transferred to U.S. as well 0 2005 Electric Power Research Institute, Inc. All rights reserved.
11
EPRI Collaboration Reducing the Costs and Risks of Decommissioning Nuclear Facilities Examples: EPRI Reports/Software Available to Members Planning=
Pre-planning Manual R
tory.Issu License Termination Plan Site Characterization**
Site Release Modeling and Characterization Initial Activities Optimization of Radioactive Waste Management*
Reactor Primary System Decontamination**
Removal of Graphite Cores**
Major'Remnoval Reactor Vessel Internals Segmentation Removal of Major Components and Structures Site Survey and Final Release**
Major Site Release Site Groundwater Characterization Studies**
Demolition of Major Structures Disposal of site materials (concrete, soil)
Final Site Survey**
ýClosure Tasks License Termination 02005 Electric Power Research Institute, Inc. All rights reserved.
- Technical Topics Available for Site-specific Evaluations 12
Lessons-Learned - Decommissioning o Paradigm shifts (operation-shutdown-deconstruction-disposal)
- Internal.and external stakeholders o Applicable agencies and standards o Historical site review
- Site characterization
" Groundwater modeling and monitoring
" Decontamination for decommissioning
" Reactor vessel/large component disposal
" Soil and groundwater remediation
" Low-level waste management options
" Final site survey 0 2005 Electric Power Research Institute, Inc. All rights reserved.
13
Lessons Learned - New Plants (Examples)
" AE/Construction considerations Design and construction documentation On-site construction practices Hydro-geological characteriaztion
" NSSS Design Considerations Sumps
- Structures and outside areas Spentf.uel pool and transfer canal Piping.a
- Tanks Site water management Discharge lines
© 2005 Electric Power Research Institute, Inc. All rights reserved.