NRC Webinar Decision on Resumption of Fuel Loading Activities for Southern California Edison Company June 3, 2019 NRC Region IV, Arlington, TX

NRC Region IV Presenters 2

  • Linda Howell, Acting Director Division of Nuclear Materials Safety
  • Lee Brookhart, Senior Inspector Reactor Inspection Branch, Division of Nuclear Materials Safety

3 Topic Participants Introductions and Opening Remarks Linda Howell NRC Decision Regarding Resumption of Fuel Transfer Operations at SONGS Linda Howell Questions and Answers/Discussion Linda Howell & Lee Brookhart Closing Remarks Linda Howell Agenda

4

  • Only in the event of technical difficulties with the webinar, a telephone bridge line will be used:

-Bridge Number: (888) 790-3407

-Passcode: 6360994

-Link to NRC Spotlight web page:

https://www.nrc.gov/reactors/operating/op s-experience/songs-spec-insp-activities-cask-loading-misalignment.html

August 3, 2018 Incident Summary of Incident 5

Special Inspection (September 10-14, 2018)

Special Inspection Results

  • 2 Potentially Escalated Findings 6

Special Inspection Follow-up (November 2018 - Ongoing)

  • Review of all Causal Evaluations and Corrective Actions

-Causal Evaluations did not address certain issues that were identified during the NRC Special Inspection

-Corrective actions for procedures changes contained certain weaknesses that needed to be addressed

-Issues with equipment enhancements not fully/appropriately addressed

-Canister transport issues involving seismic analyses identified 7

Final Enforcement Action (March 25, 2019)

-$116,000.00 Civil Penalty

-No Civil Penalty 8

  • Licensee initiated visual canister examination plan
  • Statistical analysis to determine maximum scratch depth

Resolution of Outstanding Issues and the Path to Resuming Fuel Transfer Operations

  • NRC independent observation of in-situ visual assessments
  • NRC independent statistical analysis of visual assessment data 10 Resolution of Outstanding Issues and the Path to Resuming Fuel Transfer Operations, contd

NRC notification to licensee (May 17, 2019)

  • NRC communicated the completion of its review of the canister scratching analysis and acceptance of the Southern California Edison evaluations.
  • Southern California Edison was informed that the NRC was satisfied with the corrective actions taken in response to the August 3, 2018, event.
  • NRC has no objection to the resumption of fuel transfer operations at San Onofre.

11

Questions and Comments Facilitator: Austin Roberts Participating via Webinar:

  • Type your name, affiliation, and your question into the webinar QUESTION box. The facilitator will pose questions from the QUESTION box to the NRC presenters.

Present in Arlington, TX:

  • Raise your hand to get the facilitators attention. Please state your name and affiliation clearly into the microphone before posing your question or comment.

12

Feedback, Questions, and Comments 13 Webinar Feedback Link:

https://www.nrc.gov/public-involve/public-meetings.html CONCLUSION OF WEBINAR