ML14269A031

From kanterella
Revision as of 13:35, 26 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
10/28/2014 Regulatory Conference with Entergy Operations (ANO) 10-28-14
ML14269A031
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 09/25/2014
From:
NRC Region 4
To:
C. Young
References
Download: ML14269A031 (3)


Text

September 25, 2014

SUBJECT:

REGULATORY CONFERENCE WITH ENTERGY OPERATIONS, INC.

FACILITY: Arkansas Nuclear One, Units 1 and 2

DOCKETS: 50-313 and 50-368 DATE & TIME: Tuesday, October 28, 2014 9:00 a.m. - 2:00 p.m. (CDT)

LOCATION: Region IV Office Conference Room 1 1600 E. Lamar Blvd.

Arlington, TX 76011 PURPOSE: The purpose of this meeting is to discuss apparent violations related to flood protection, which affect both units at Arkansas Nuclear One. The focus of the Regulatory Conference is to discuss the safety significance of the findings, which are discussed in the Nuclear Regulatory Commission (NRC) Inspection Report 05000313/2014009 and 05000368/2014009 (ML14253A122). CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting. After the business portion, but before the meeting is adjourned, the public will have one or more opportunities to communicate with the NRC. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need an accommodation to participate in this meeting, or if you need this meeting notice or other information from the meeting in another format (e.g., Braille or large print),

please notify the NRC's meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. A telecommunications bridge will be available for the public. The number of lines is limited. Interested parties should call 1-888-606-5946 and enter passcode 4812102 to participate in this meeting.

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 Arkansas Nuclear One, Units 1 and 2 PARTICIPANTS: NRC M. Dapas, Regional Administrator, Region IV T. Pruett, Acting Director, Division of Reactor Projects (DRP)

A. Vegel, Director, Division of Reactor Safety R. Lantz, Chief, Reactor Project Branch E, DRP V. Campbell, Chief, Allegation Coordination and Enforcement Staff R. Browder, Senior Enforcement Specialist, Allegation Coordination and Enforcement Staff B. Tindell, Senior Resident Inspector, Arkansas Nuclear One (ANO)

A. George, Project Manager, Office of Nuclear Reactor Regulation ENTERGY J. Kowalewski, Senior Vice President, Entergy J. Browning, Site Vice President, ANO J. McCann, Vice President, Regulatory Assurance, Entergy D. James, Director, Regulatory and Performance Improvement Department, ANO B. Ford, Senior Manager, Fleet Regulatory Assurance, Entergy S. Pyle, Manager, Regulatory Assurance, ANO MEETING CONTACT: Cale Young, Senior Project Engineer Project Branch E, DRP (817) 200-1250 Cale.Young@nrc.gov

ML14269A031 SUNSI Review By: CHY ADAMS: Yes No Sensitive Non-Sensitive Non-Publicly Available Publicly Available Keyword NRC-002 OFFICE SPE:DRP/E C:DRP/E PAO RSLO D:DRP NAME CYoung GWerner VLDricks WAMaier TPruett SIGNATURE /RA/ /RA/ /RA//RA//RA/ DATE 9/24/14 9/24/14 9/24/14 9/24/14 9/25/14