|
---|
Category:License-Operator
MONTHYEARML24242A2612024-08-29029 August 2024 Operator Licensing Examination Approval 05000261/2024301 RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 ML22350A1022022-12-16016 December 2022 301 Exam Administrative Items (Normal release)(ADAMS-2B) IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22031A2542022-01-25025 January 2022 301 Corporate Notification Letter ML21260A1402021-09-15015 September 2021 Operator Licensing Examination Approval 05000261/2021301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19252A1532019-09-0909 September 2019 Operator Licensing Examination Approval 05000261/2019301 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19116A1212019-04-26026 April 2019 301 Retake Exam Administrative Items ADAMS-2D - Normal Release ML19115A3112019-04-25025 April 2019 302 Retake ADAMS-2A Submission Normal Release ML19115A3182019-04-25025 April 2019 302 Retake ADAMS-2B Final Exam Items Normal Release ML19115A3322019-04-25025 April 2019 302 Retake ADAMS-2D Submission Normal Release ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 IR 05000261/20183012018-06-0707 June 2018 NRC Operator License Re-Take Examination Report 05000261/2018301 ML18107A2052018-04-12012 April 2018 Retake Examination Approval Letter 05000261/2018301 ML17354B2672017-12-20020 December 2017 05000261/17301 as Given RO Written Exam with References and Key - Delay Release 2 Yrs ML17354B2702017-12-20020 December 2017 05000261/2017301 as Given SRO Written Exam with References and Key - Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16209A5732016-07-26026 July 2016 Operator Licensing Operating (Retake) Examination Approval Letter 05000261/2016-302 ML16124A8182016-04-27027 April 2016 (3) Robinson 2016-301 Draft SRO Written Exam ML16125A0792016-04-27027 April 2016 (14) Robinson 2016-301 General Correspondence ML16125A0352016-04-27027 April 2016 (6) Robinson 2016-301 Draft Administrative JPMs ML16125A0662016-04-27027 April 2016 (11) Robinson 2016-301 Final Simulator and in Plant JPMs ML16125A0812016-04-27027 April 2016 (1) Robinson 2016-301 Draft Administrative Documents ML16124A0872016-04-27027 April 2016 (5) Robinson 2016-301 Draft Simulator and in Plant JPMs ML16124B0592016-04-27027 April 2016 (7) Robinson 2016-301 Final Administrative Documents ML16124A7782016-04-27027 April 2016 (4) Robinson 2016-301 Draft Simulator Scenarios ML16125A0392016-04-27027 April 2016 (10) Robinson 2016-301 Final Simulator Scenarios ML16125A0742016-04-27027 April 2016 (13) Robinson 2016-301 Post Exam Comments ML16125A0752016-04-27027 April 2016 (15) Robinson 2016-301 Other Documents for Retention ML16125A0692016-04-27027 April 2016 (12) Robinson 2016-301 Final Administrative JPMs ML16124A9382016-04-27027 April 2016 (2) Robinson 2016-301 Draft RO Written Exam ML16061A4532016-03-0101 March 2016 301 RO As-Given Written Exam ML16061A4572016-03-0101 March 2016 301 SRO As-Given Written Exam ML16046A0082016-02-12012 February 2016 Operating Licensing Written Examination Approval 05000261/2016301 RNP-RA/15-0093, Reactor and Senior Reactor Operator Initial Examination Outlines2015-11-0404 November 2015 Reactor and Senior Reactor Operator Initial Examination Outlines ML15258A4712015-09-15015 September 2015 Initial Exam 2011-301 Draft Administrative Documents ML15251A4352015-09-0303 September 2015 Notification of Licensed Operator Initial Examination 05000261/2016301 ML15245A5862015-09-0202 September 2015 Initial Exam 2011-301 Draft Admin Jpm'S ML15245A5512015-09-0202 September 2015 Initial Exam 2011-301 Draft Admin Jpm'S ML15245A5612015-05-21021 May 2015 Initial Exam 2011-301 Final Admin Jpm'S ML15224B4192015-05-21021 May 2015 Initial Exam 2011-301 Draft SRO Written Exam ML15224B4172015-05-21021 May 2015 Initial Exam 2011-301 Draft RO Written Exam ML15224B4102015-05-21021 May 2015 Initial Exam 2011-301 Final Simulator Scenarios ML15224B3952015-05-21021 May 2015 Initial Exam 2011-301 Final Sim IN-Plant JPMs 2024-08-29
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24242A2612024-08-29029 August 2024 Operator Licensing Examination Approval 05000261/2024301 RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 ML22350A1022022-12-16016 December 2022 301 Exam Administrative Items (Normal release)(ADAMS-2B) IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22031A2542022-01-25025 January 2022 301 Corporate Notification Letter ML21260A1402021-09-15015 September 2021 Operator Licensing Examination Approval 05000261/2021301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19252A1532019-09-0909 September 2019 Operator Licensing Examination Approval 05000261/2019301 RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19116A1212019-04-26026 April 2019 301 Retake Exam Administrative Items ADAMS-2D - Normal Release ML19115A3112019-04-25025 April 2019 302 Retake ADAMS-2A Submission Normal Release ML19115A3182019-04-25025 April 2019 302 Retake ADAMS-2B Final Exam Items Normal Release ML19115A3322019-04-25025 April 2019 302 Retake ADAMS-2D Submission Normal Release IR 05000261/20183012018-06-0707 June 2018 NRC Operator License Re-Take Examination Report 05000261/2018301 ML18107A2052018-04-12012 April 2018 Retake Examination Approval Letter 05000261/2018301 ML17354B2672017-12-20020 December 2017 05000261/17301 as Given RO Written Exam with References and Key - Delay Release 2 Yrs ML17354B2702017-12-20020 December 2017 05000261/2017301 as Given SRO Written Exam with References and Key - Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16125A0792016-04-27027 April 2016 (14) Robinson 2016-301 General Correspondence ML16124A8182016-04-27027 April 2016 (3) Robinson 2016-301 Draft SRO Written Exam ML16124A9382016-04-27027 April 2016 (2) Robinson 2016-301 Draft RO Written Exam ML16125A0352016-04-27027 April 2016 (6) Robinson 2016-301 Draft Administrative JPMs ML16125A0662016-04-27027 April 2016 (11) Robinson 2016-301 Final Simulator and in Plant JPMs ML16125A0812016-04-27027 April 2016 (1) Robinson 2016-301 Draft Administrative Documents ML16124A0872016-04-27027 April 2016 (5) Robinson 2016-301 Draft Simulator and in Plant JPMs ML16124B0592016-04-27027 April 2016 (7) Robinson 2016-301 Final Administrative Documents ML16124A7782016-04-27027 April 2016 (4) Robinson 2016-301 Draft Simulator Scenarios ML16125A0392016-04-27027 April 2016 (10) Robinson 2016-301 Final Simulator Scenarios ML16125A0742016-04-27027 April 2016 (13) Robinson 2016-301 Post Exam Comments ML16125A0752016-04-27027 April 2016 (15) Robinson 2016-301 Other Documents for Retention ML16125A0692016-04-27027 April 2016 (12) Robinson 2016-301 Final Administrative JPMs ML16061A4532016-03-0101 March 2016 301 RO As-Given Written Exam ML16061A4572016-03-0101 March 2016 301 SRO As-Given Written Exam ML16046A0082016-02-12012 February 2016 Operating Licensing Written Examination Approval 05000261/2016301 ML15258A4712015-09-15015 September 2015 Initial Exam 2011-301 Draft Administrative Documents ML15245A5862015-09-0202 September 2015 Initial Exam 2011-301 Draft Admin Jpm'S ML15245A5512015-09-0202 September 2015 Initial Exam 2011-301 Draft Admin Jpm'S ML15245A5612015-05-21021 May 2015 Initial Exam 2011-301 Final Admin Jpm'S ML15224B4192015-05-21021 May 2015 Initial Exam 2011-301 Draft SRO Written Exam ML15224B4172015-05-21021 May 2015 Initial Exam 2011-301 Draft RO Written Exam ML15224B4102015-05-21021 May 2015 Initial Exam 2011-301 Final Simulator Scenarios ML15224B3952015-05-21021 May 2015 Initial Exam 2011-301 Final Sim IN-Plant JPMs ML15223B3262015-05-21021 May 2015 Initial Exam 2011-301 Draft Sim IN-Plant JPMs ML15167A3712014-10-29029 October 2014 Initial Exam 2014-301 Post Exam Comments ML15167A1372014-10-29029 October 2014 Initial Exam 2014-301 Draft Admin Documents ML15167A3672014-10-29029 October 2014 Initial Exam 2014-301 Final Admin Jpm'S ML15167A3642014-10-29029 October 2014 Initial Exam 2014-301 Final Sim in Plant Jpm'S ML15167A3442014-10-29029 October 2014 Initial Exam 2014-301 Draft Simulator Scenarios 2024-08-29
[Table view] |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Robinson Date of Examination: 8/25/14 Exam Level: RO SRO-I SRO-U Operating Test No.: Control Room Systems@ (8 for RO); (7 for SRO-I, a-g); (2 or 3 for SRO-U, including 1 ESF) System / JPM Title Type Code* Safety Function a. Restore Control Power to SI Valves and Isolate Accumulators IAW EPP-008. EN, A, D, S 3 b. Fill Reactor Coolant Stand Pipe A,D, S 4P c. Terminate an Inadvertent CV Spray Actuation N, S 5 d. Perform an Emergency Boration IAW EOP-ES-0.1, using the RWST A, L, D, S 1 e. Remove N-44 from service IAW OWP-011 D, S 7 f. Respond to a Reactor trip and Turbine trip A, M, S 4S g. Restore Normal Power after Loss of Startup Transformer D, S 6 h. Respond to a Loss of a Circulating Water Pump D, S 8 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i. Trip the Reactor Locally as Outside Auxiliary Operator D, E 1 j. Local Control of S/G Level and Pressure during a Site Black Out D, E 4S k. Locally align containment isolation valves following a Safety Injection R, D, E 5 @ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) (P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 - / - / system) domly selected)
JPM A: Restore Control Power to SI Valves and Isolate Accumulators IAW EPP-008. K/A 009 EA1.13: Ability to operate and monitor the following as they apply to a small break LOCA: ESFAS (009 Small Break LOCA) The plant has been tripped due to a small break LOCA. The crew is in EPP-8 and they are at the point to restore control power to SI Valves and isolate or depressurize SI Accumulators. The candidate will be given a marked up copy of EPP-8 to this point. The candidate will then restore power to multiple SI Valves. After that they will verify SI Accumulator Discharge valves are shut. One valve will not be shut and they will then have to depressurize the accumulator to prevent it from discharging. Once the Accumulator is depressurized, the JPM will be complete. (Bank JPM CR-069) (RO, SRO-I, SRO-U) JPM B: Fill Reactor Coolant Stand Pipe K/A 003 A4.05: Ability to manually operate and/or monitor in the control room: RCP seal leakage detection instrumentation. (003 Reactor Coolant Pump System (RCPS)) The plant will be at 100% power. The candidate will assume the watch. APP-001-C5, RCP STANDPIPE HI/LO LVL is in alarm. The candidate will use OP-101 Section 8.2 to refill the standpipe until APP-001-C5 is extinguished. RC-519B will not close which will force them to OP-103 to relieve the Hydraulic lock. Once RC-519B goes closed, the JPM will be complete. (Bank JPM CR-111) (RO, SRO-I) JPM C: Terminate an Inadvertent CV Spray Actuation(New) K/A 026 A4.01: Ability to manually operate and/or monitor in the control room: CSS Controls. (026 Containment Spray System(CSS)) The plant will have just tripped. The candidate will take the watch while in EOP-E-0, REACTOR TRIP OR SAFETY INJECTION, at step 9, Check CV Spray NOT Required. The candidate will verify that CV spray is not required but that it has actuated. The candidate will go through the actions to terminate CV Spray. Once CV Spray is terminated, the JPM will be complete. (RO, SRO-I, SRO-U, SRO-U) JPM D: Perform an Emergency Boration IAW EOP-ES-0.1 K/A 024 AA1.02/AA1.04: Ability to operate and/or monitor the following as they apply to Emergency Boration: Boric Acid Pump/Manual boration valve. (024 Emergency Boration) The plant has tripped and the crew is in EOP-ES-0.1, REACTOR TRIP RESPONSE. The candidate will recognize that two control rods are stuck out and will need to emergency borate the RCS to cold shutdown. The candidate will attempt to borate via the BAST but this will not work. The candidate will then transition to borating from the RWST. Once the candidate has an emergency boration flow path from the RWST aligned, the JPM will be complete. (Bank JMP CR-054 ) (RO, SRO-I) JPM E: Remove N-44 from service IAW OWP-011 K/A 015 A4.03: Ability to manually operate and/or monitor in the control room: Trip Bypasses (015 Nuclear Instrumentation System(NIS)) The plant is at 100% power. The candidate will be directed to remove NI-44 from service IAW OWP-011. The candidate will get OWP-011 and remove NI-44 from service. Once the NI is removed from service, the JPM will be complete. (Bank JPM CR-009) (RO, SRO-I, SRO-U)
JPM F: Respond to a Reactor Trip and Turbine Trip K/A 007 EA1.07: Ability to operate and monitor the following as they apply to a reactor trip: MT/G trip; verification that the MT/G has been tripped. (007 Reactor Trip) The candidate will assume the watch at 100% power. The reactor will fail to automatically trip and the candidate will be required to depress either reactor trip pushbutton. The turbine will fail to trip. The candidate will be required to respond to the reactor trip IAW EOP-E-0, REACTOR TRIP OR SAFETY INJECTION. The candidate will verify the reactor is tripped then respond to the turbine not being tripped. The candidate will attempt to run the turbine back, however, this will not work. The candidate will -E-0. Once these Immediate Actions are complete, the JPM is complete. (Bank JPM CR-085 modified) (RO, SRO-I, SRO-U) JPM G: Restore normal power after loss of startup transformer K/A 062 A4.01: Ability to manually operate and/or monitor in the control room: All breakers(including available switchyard) (062 AC Electrical Distribution System) The plant will be shutdown due to a reactor trip and Safety Injection from a loss of the startup transformer. The candidate is directed by the CRS to perform OP-603 Section 6.4.1(with the exception of E-1, E-2, and 480V bus 4 and 4KV bus 5). The candidate will make multiple switch manipulations in order to restore power. Once power is restored, the JPM is complete. (Bank JPM CR-28) (RO, SRO-I) JPM H: Respond to a Loss of a Circulating Water Pump K/A 075 A2.02: Ability to (a) predict the impacts of the following malfunctions or operations on the circulating water system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of Circulating Water Pumps (075 Circulating Water System) The plant is at 50% power. The Candidate will be given the shift and told to respond tripped and take Immediate Actions of AOP-012, PARTIAL LOSS OF CONDENSER VACUUM OR CIRCULATING WATER PUMP TRIP. The candidate will then start Circulating (Bank JPM CR-055) (RO) JPM I: Trip the Reactor Locally as Outside Auxiliary Operator(OAO). K/A 029 EA1.12: Ability to operate and monitor the following as they apply to a ATWS: M/G Set power supply and rector trip breakers. (O29 ATWS) The plant is at 100% power with an ATWS in progress. As the OAO, the CRS has dispatched the candidate to 480V Busses 2B and 3 to trip the following breakers: ROD DRIVE MOTOR GENERATOR SET A and ROD DRIVE MOTOR GENERATOR SET B. The candidate will go to the 4Kv room and find 480V bus 2B and breaker 52/10B. The candidate will then open the breaker by depressing the trip pushbutton in the center of the cubicle door. The candidate will find 480V bus 3 and breaker 52/14A in the 4Kv room. The candidate will then open the breaker by depressing the trip pushbutton in the center of the cubicle door. Once the breakers are open, the JPM will be complete. (RO, SRO-I, SRO-U)
JPM J: Local Control of S/G Level and Pressure during a Site Black Out. K/A 061 A1.01/A1.02: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the AFW controls including: S/G Level and S/G Pressure. (061 Auxiliary/Emergency Feedwater(AFW) System) The plant has experienced a loss of onsite and offsite power. EPP-1 has been implemented. S/G levels are currently 55%. The candidate will be directed by the CRS to perform Attachment 1 of EPP-1 which is Local Control of S/G Level and Pressure. The candidate will first go to the Pipe Jungle and open one of the V!-8A/B/ or C Steam Supply to the SDAFW Pump. Next, the candidate will go to the Secondary Control Panel area and manually throttle V2-14A/B/C to control S/G level between 60-68%. Next, the candidate will go to the Pipe Jungle and perform several valve manipulations to . Once the candidate has notified the Control Room that S/G level is under itrogen supplied for motive air, the JPM will be complete. (RO, SRO-I, SRO-U) JPM K: Locally align containment isolation valves following a Safety Injection. K/A E02 EA1.1: Ability to operate and / or monitor the following as they apply to the (SI Termination); Components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features. (E02 SI Termination) A plant trip and Safety Injection have occurred. EPP-7 is currently being implemented and the CRS has directed the candidate to perform Attachment 2 of EPP-7, Realignment of Components following SI Termination for Inside AO. The candidate will have to go to several different locations inside the Auxiliary Building(RCA) and reset multiple valves in order to realign components necessary to terminate Safety Injection. Once the Control Room is notified that the attachment is complete, the JPM will be complete. (RO, SRO-I)