ML16307A345

From kanterella
Revision as of 04:43, 19 May 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2016 Braidwood Initial License Examination, Form Es 201-1
ML16307A345
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/21/2016
From: Walton R K
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML16306A152 List:
References
Download: ML16307A345 (2)


Text

ES-201 Examination Preparation Checklist Form ES-201-1 Facility: __Braidwood______ Date of Examination: Sept 6 - 15, 2016 Developed by: Written: Facility X NRC // Operating Facility X NRC Target Date* Task Description (Reference) Chief Examiner's Initials -180 1. Examination administration date confirmed (C.1.a; C.2.a and b) RKW -150 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) RKW -150 3. Facility contact briefed on security and other requirements (C.2.c) RKW 8/20/2015 -150 4. Corporate notification letter sent (C.2.d) RKW 8/20/2015 [-120] 5. Reference material due (C.1.e; C.3.c; Attachment 3) N/A {-90} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, ES-D-1, ES-401-1/2, ES-401N-1/2, ES-401-3, ES-401N-3, ES-401-4, and ES-401N-4, as applicable (C.1.e and f; C.3.d) RKW 5/9/2016 {-85} 7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee (C.2.h; C.3.e) RKW 5/11/2016 {-60} 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, ES-401N-6, and any Form ES-201-2, ES-201-3, ES-301-1, or ES-301-2 updates), and reference materials due (C.1.e, f, g and h; C.3.d) RKW 6/1/2016 -45 9. Written exam and operating test reviews completed. (C.3.f) RKW 6/21/2016 -30 10. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; ES-202) RKW 7/29/2016 -21 11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f) RKW 6/21/2016 -21 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) RKW 7/25/2016 -14 13. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202) RKW 8/15/2016 -14 14. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h) RKW 8/15/2016 -7 15. Facility licensee management queried regarding the licensee's views on the examination. (C.2 j) RKW -7 16. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204) RKW 7/29/16 -7 17. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k) RKW

-7 18. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i) RKW

  • Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee. [Applies only] {Does not apply} to examinations prepared by the NRC.