MONTHYEARIR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24149A1592024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24087A1962024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close IR 05000416/20220042024-03-19019 March 2024 – Amended Integrated Inspection Report 05000416/2022004 and Exercise of Enforcement Discretion ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 2024-09-09
[Table view] |
Text
- ~Entergy GNR0-2017 /00077 December 6, 2017 U.S. Nuclear Regulatory Commission . ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Entergy Operations, Inc. P.O. Box 756 Port Gibson, MS 39150 Eric A. Larson Site Vice President Grand Gulf Nuclear Station Tel. (601) 437-7500
SUBJECT:
Supplemental Letter to License Amendment Request to Incorporate Tornado Missile Risk Evaluator into Licensing Basis Grand Gulf Nuclear Station, Unit 1
- Docket No. 50-416 License No. NPF-29
REFERENCE:
Grand Gulf Nuclear Station Letter GNR0-2017/0006.1, "License Amendment Request to Incorporate Tornado Missile Risk Evaluator into Licensing Basis". Ladies and Gentlemen: The referenced letter submitted a license amendment request to incorporate the Tornado Missile Risk Evaluator methodology into the Grand Gulf licensing basis. This letter provides a supplemental change to the previously provided Updated Final Safety Analysis Report Markup, Table 3.5-8, page 5 of 6. Please replace the previously submitted page with the one provide in the attachment. This letter contains no Regulatory Commitments. Should you have any questions concerning the content of this letter, please contact Douglas Neve, Manager Regulatory Assurance at 601-437-2103. Sincerely, CGL-Eric A. Larson Site Vice President EAL/amh Attachments: 1. Updated Final Safety Analysis Report Page Markup.
GNR0-2017/00077 Page 2 of 2 cc: with Attachment Mr. Siva Lingam U.S. Nuclear Regulatory Commission Mail Stop OWFN 8 81 Rockville, MD 20852-2738 cc: without Attachments and Enclosure Mr. Kriss Kennedy U.S. Nuclear Regulatory Comm_ission Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 Dr. Mary Currier, M.D., M.P.H State Health Officer Mississippi Department of Health P.O. Box 1700 Jackson, MS 39215-1700 Email: mary.currier@msdh.ms.gov GNR0-2017/00077 \ Grand Gulf Nuclear Station, Unit No. 1 Docket No. 50-416 I License No. NPF-29 License Amendment Request to Incorporate Tornado Missile Risk Evaluator into Licensing Basis Attachment 1 Updated Final Safety Analysis Report Page Markup .J
- f. Elevator machine room exhaust air check damper with centerline El. 212'-4" 6. Diesel-generator Building a. Air exhaust louver with centerline at El. 163' -9" b. Air exhaust louvers with centerline at El. 162'-0" c. Air intake louvers with centerline at El. 159'-8" d. Diesel generator exhaust pipes above roof El. 172' -0" _e. Diesel generator fuel oil tank vent-top El. 173'-6" 7. Auxiliary Building a. RHR room blowout shafts above El. 185'-0" b. RHR pump room & RCIC room blowout shafts above El. 185' -0" c. Steam tunnel blowout shaft above El. 185' -0" d. Louver and door at El. 185'-0" e. Door at roof El. 185' -0" f. Main entrance door at El. 139' -0" g. Exit door at El. 139'-0" GGNS-UFSAR Figure 3.8-117) Exposed\ but shielded by the partially complete,d Unit 2 Containment shell located approximately 90 feet to the north (see_ Figure 3.8-117) Protected by adjacent Auxiliary Bldg. wall & generator bldg. with roof El. 172'-0" (see Figure 9.5-21) Protected by adjacent Auxiliary Bldg. wall & generator bldg. with roof El. 172'-0" (see Figure 9.5-21) Protected by a 2'-0" thick reinforced concrete barrier wall (see Figure 9.5-21) See subsection 9.5.8.3 Exposed but shielded from horizontal missiles by concrete parapet with top elevation of 17 4' -0" Protected by a 2' -0" thick reinforced concrete barrier structure (see Figure 3.8-81) Protected by a 2'-0" thick reinforced concrete barrier structure (see Figure 3.8-81) Protected by a 2'-0" thick reinforced concrete barrier structure (see Figure 3.8-81) Protected by a 2'-0" thick reinforced concrete barrier wall (see Figure 3.8-81) Protected by a 2'-0" thick reinforced concrete barrier wall (see Figure 3.8-81) Protected by a 2'-0" thick reinforced concrete barrier wall & 2'-0" thick top slab (see Figure 3.8-79) Protected by a 2'-0" thick reinforced concrete barrier wall & 2'-0" thick top slab (see Figure 3.8-79) 5