ML021900069

From kanterella
Revision as of 19:35, 6 April 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
NRC Regulatory Issue Summary (RIS) 2002-09 - Preparation and Scheduling of Operator Licensing Examinations for Watts Bar Nuclear Plant
ML021900069
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 07/03/2002
From: Pace P L
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-02-009
Download: ML021900069 (3)


See also: RIS 2002-09

Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000JU L 0 3 200210 CFR 55.40U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:In the Matter of Tennessee Valley Authority) )Docket No. 50-390WATTS BAR NUCLEAR PLANT (WBN) -NRC REGULATORY ISSUE SUMMARY (RIS) 2002-09 -PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS RIS 2002-09 was released by NRC on June 6, 2002, and requested information regarding WBN's projected operator licensing examination schedules and the estimated number of applicants. The information requested by NRC was defined on Form 536. The enclosure to this letter addresses NRC's request and provides an estimate of the examination requirements for WBN. Should you require additional information regarding this matter, please contact me at (423) 365-1824. Sincerely,Manager, Site Licensing and Industry AffairsEnclosure cc: See page 2Pnted on recycled paper/'4o)c,2:

U.S. Nuclear Regulatory Commission Page 2 JUL 0 3 2002 cc (Enclosure): NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. L. Mark Padovan, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2739 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303

Enclosure Operator Licensing Examination Data (Data as defined on NRC Form 536) FACILITY NRC REGION WATTS BAR NUCLEAR PLANT II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY03 CY04 CY05 CY06 ESTIMATED NUMBER OF LICENSEE PREPARED 0 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC PREPARED 0 1 1 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY03 CY04 CY05 CY06 NUMBER OF REACTOR 0 4 4 0 OPERATORS NUMBER OF SENIOR REACTOR 0 2 2 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 0 2 2 0 OPERATORS -UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS -LIMITED PROPOSED DATES 05/03 -05/07 10/09 -10/13 PRIMARY DATE ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULEPROPOSED NUMBER CY03 CY04 FIRST SECOND THIRD FIRST SECOND THIRD ESTIMATED NUMBER OF 0 4 0 0 0 4 CANDIDATES