Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements ML22287A1572022-12-0505 December 2022 Issuance of Amendment No. 171 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22230C9242022-09-30030 September 2022 Issuance of Amendment No. 170 Revision of 120-Volt AC Vital Instrument Panel Requirements ML21008A0142021-02-25025 February 2021 Issuance of Amendment No. 168 Revise Technical Specification Table 3.3.4 to Change Time Delay Setpoints for Degraded Voltage Relays ML20293A1572020-12-28028 December 2020 Issuance of Amendment No. 167 Reactor Trip System Instrumentation Technical Specification Changes to Implement WCAP-14333 and WCAP-15376 ML20298A2532020-11-24024 November 2020 Issuance of Amendment No. 166 Revise Technical Specification 3/4.8.1, A.C. Sources Operating ML20318A0032020-11-24024 November 2020 Issuance of Revised Page for Renewed Facility Operating License Atomic Safety and Licensing Board Decisions LBP-20-09 and LBP-20-12 ML20070Q0712020-03-27027 March 2020 Issuance of Amendment No. 165 Emergency Core Cooling System Accumulator Technical Specification Changes ML19357A1952020-02-10010 February 2020 Unit No.1; & Turkey Point Nuclear Generating Unit Nos. 3 & 4 - Issuance of Amendments Nos. 265, 268, 164, 290, and 284 Revise Technical Specifications to Adopt TSTF-563 ML19326C4802019-12-0505 December 2019 Issuance of Amendment No. 163 One-Time Change to the Onsite Power Distribution Requirements ML19224A5632019-11-18018 November 2019 Issuance of Amendment No. 162 Revisions to Technical Specifications Associated with Movable Control Rods ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 ML19129A2432019-05-10010 May 2019 Correction to Amendment No. 160 Regarding Measurement and Assessment Frequency for Technical Specification 6.7.6 L, Control Room Envelope Habitability Program ML19065A2152019-03-29029 March 2019 Issuance of Amendment No. 160 Measurement and Assessment Frequency for Technical Specification 6.7.6.l, Control Room Envelope Habitability Program ML18355A4912019-03-12012 March 2019 Renewed Facility Operating License ML18204A2912019-03-11011 March 2019 Issuance of Amendment No. 159 Methodology for Analysis of Seismic Category I Structures with Concrete Affected by Alkali-Silica Reaction ML18247A5382018-11-27027 November 2018 Issuance of Amendment No. 158 Removing Requirement to Perform Certain Surveillance Requirements During Shutdown and Changes to Administrative Technical Specifications ML18199A6092018-08-0707 August 2018 Issuance of Amendment No. 157 Changes to the Technical Specifications Requirements for DC Batteries (CAC No. MG0046; EPID L-2017-LLA-0289) ML17102A8892017-04-13013 April 2017 Issuance of Amendment Licensing Basis Change for Service Water Cooling Tower ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) SBK-L-16082, Supplement to License Amendment Request 16-01 Request to Extend Containment Leakage Test Frequency2016-05-31031 May 2016 Supplement to License Amendment Request 16-01 Request to Extend Containment Leakage Test Frequency ML16068A1302016-02-27027 February 2016 License Amendment Request 15-02, Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 Development of Emergency Action Levels for Non-Passive Reactors ML15096A2552015-11-0202 November 2015 Issuance of Amendment Regarding License Amendment Request 14-04, Revised Reactor Coolant System Pressure-Temperature Limits Applicable for 44 Effective Full Power Years ML15231A1442015-10-0606 October 2015 Issuance of Amendment No. 150 Regarding Note for Reactor Coolant System Surveillance Requirements ML15096A1312015-07-17017 July 2015 Issuance of Amendment Regarding Changes to Technical Specification 3.3.3.1, Radiation Monitoring for Plant Operations ML15118A6322015-05-18018 May 2015 Issuance of Amendment Regarding License Amendment Request Regarding New Fuel Valut ML15082A2332015-04-24024 April 2015 Issuance of Amendment Regarding Increase Voltage Limit for Diesel Generator Load Rejection Surveillance Requirement ML15058A7062015-04-22022 April 2015 Issuance of Amendment No. 146 Regarding the Cyber Security Plan Implementation Schedule ML15002A2512015-03-31031 March 2015 Unit No.1 - Issuance of Amendment Regarding License Amendment Request 14-06, Application Regarding the Removal of the Cold Leg Injection Permissive from Technical Specifications ML14345A2882015-02-0606 February 2015 Issuance of Amendment Regarding Technical Specifications Task Force Traveler-523, Generic Letter 2008-01, Managing Gas Accumulation Using the Consolidated Line Item Improvement Process ML14363A2752015-02-0404 February 2015 Non-Proprietary SE for Issuance of Amendment Regarding License Amendment Request Regarding Fixed Incore Detector System Analysis ML14184A7952014-09-0303 September 2014 Issuance of Amendment Regarding License Amendment Request Regarding Fuel Storage Changes ML13212A0692014-07-24024 July 2014 Issuance of Amendment Regarding the Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML14029A4452014-03-0606 March 2014 Issuance of Amendment Regarding License Amendment Request 12-04, Application Regarding Cold Leg Injection Permissive ML13213A1432014-03-0505 March 2014 Issuance of Amendment Regarding the Use of Optimized Zirlo Fuel Rod Cladding Material ML13107A0162013-10-25025 October 2013 Issuance of Amendment Regarding the License Amendment Request 13-02, Application to Revise Technical Specifications to Adopt TSTSF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection.. ML13204A3792013-07-26026 July 2013 Correction to Issuance of Amendment 137 Regarding the Administrative Changes and Corrections to the Technical Specifications ML13074A7602013-06-17017 June 2013 Issuance of Amendment Regarding the Administrative Changes and Corrections to the Technical Specifications ML13114A3172013-04-25025 April 2013 Correction to Issuance of Amendment 136 Addition of Action Statement to Limiting Condition for Operation 3.6.5.1, Containment Enclosure Emergency Air Cleanup System ML1130000632013-04-23023 April 2013 Issuance of Amendment Addition of Action Statement to Limiting Condition for Operation 3.6.5.1, Containment Enclosure Emergency Air Cleanup System ML1208205102013-04-15015 April 2013 Issuance of Amendment Revision to the Applicability of the Reactor Coolant System Pressure-Temperature Limits and the Cold Overpressure Protection Setpoints ML13028A1462013-04-0404 April 2013 Issuance of Amendment Regarding the Extension of the Inspection Interval for the Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process ML12332A3012013-01-31031 January 2013 Issuance of Amendment Emergency Plan ML12237A0942012-11-0202 November 2012 Issuance of Amendment Cyber Security Program ML12178A5372012-09-10010 September 2012 Issuance of Amendment Permanent Application of Steam Generator Tube Alternate Repair Criteria, H* ML1200302712012-02-23023 February 2012 Issuance of Amendment Regarding the Application to Revise the Technical Specifications for Reactor Coolant System Leakage Detection Instrumentation ML1120700482011-08-23023 August 2011 Issuance of Amendment Approval of Cyber Security Plan ML1112503882011-08-22022 August 2011 Issuance of Amendment 126 Remove Technical Specification 3.4.10, Structural Integrity ML1108401882011-04-29029 April 2011 Issuance of Amendment Relocation of Technical Specification Requirements Related to Electrical Equipment Protective Devices ML1021702782010-09-0202 September 2010 Issuance of Amendment Operations Manager Qualification Requirements 2023-12-22
[Table view] Category:Letter
MONTHYEARML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A0522023-10-0202 October 2023 Requalification Program Inspection IR 05000443/20234012023-09-0808 September 2023 Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) IR 05000443/20234202023-09-0505 September 2023 Security Baseline Inspection Report 05000443/2023420 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000443/20233022023-08-16016 August 2023 Operator Licensing Retake Examination Report 05000443/2023302 IR 05000443/20230022023-08-0808 August 2023 Integrated Inspection Report 05000443/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-104, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-103, Inservice Inspection Examination Report2023-08-0303 August 2023 Inservice Inspection Examination Report ML23192A0782023-07-11011 July 2023 Operator Licensing Retake Examination Approval L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 ML23157A0722023-06-0606 June 2023 Notification of Conduct of a Fire Protection Team Inspection L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000443/20233012023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000443/2023301 L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves IR 05000443/20230012023-05-11011 May 2023 Integrated Inspection Report 05000443/2023001 ML23129A0312023-05-0909 May 2023 Reactor Operator Retake License Examination ML23117A3652023-05-0404 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report L-2023-053, Core Operating Limits Report for Cycle 232023-04-0505 April 2023 Core Operating Limits Report for Cycle 23 ML23088A1522023-03-29029 March 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-023, Revised Steam Generator Tube Inspection Report2023-03-0303 March 2023 Revised Steam Generator Tube Inspection Report ML23020A1002023-03-0303 March 2023 OEDO-22-00419 - 2.206 Petition for Seabrook Station Structure Concrete Concerns (EPID L-2022-CRS-0000)- Closure Letter 2024-01-29
[Table view] Category:Safety Evaluation
MONTHYEARML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code ML22287A1572022-12-0505 December 2022 Issuance of Amendment No. 171 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22262A3142022-10-0404 October 2022 Relief Requests 3IR-18 and 3IR-19, Relief from the Requirements of the ASME Code ML22230C9242022-09-30030 September 2022 Issuance of Amendment No. 170 Revision of 120-Volt AC Vital Instrument Panel Requirements ML21008A0142021-02-25025 February 2021 Issuance of Amendment No. 168 Revise Technical Specification Table 3.3.4 to Change Time Delay Setpoints for Degraded Voltage Relays ML20293A1572020-12-28028 December 2020 Issuance of Amendment No. 167 Reactor Trip System Instrumentation Technical Specification Changes to Implement WCAP-14333 and WCAP-15376 ML20298A2532020-11-24024 November 2020 Issuance of Amendment No. 166 Revise Technical Specification 3/4.8.1, A.C. Sources Operating ML20070Q0712020-03-27027 March 2020 Issuance of Amendment No. 165 Emergency Core Cooling System Accumulator Technical Specification Changes ML20076D2812020-03-17017 March 2020 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML20073E4342020-03-17017 March 2020 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML19357A1952020-02-10010 February 2020 Unit No.1; & Turkey Point Nuclear Generating Unit Nos. 3 & 4 - Issuance of Amendments Nos. 265, 268, 164, 290, and 284 Revise Technical Specifications to Adopt TSTF-563 ML20015A1232020-02-0606 February 2020 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19340A1282019-12-13013 December 2019 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML19326C4802019-12-0505 December 2019 Issuance of Amendment No. 163 One-Time Change to the Onsite Power Distribution Requirements ML19224A5632019-11-18018 November 2019 Issuance of Amendment No. 162 Revisions to Technical Specifications Associated with Movable Control Rods ML19249B1012019-09-30030 September 2019 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code; Relief Request RA-19-001 ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 ML19065A2152019-03-29029 March 2019 Issuance of Amendment No. 160 Measurement and Assessment Frequency for Technical Specification 6.7.6.l, Control Room Envelope Habitability Program ML18204A2912019-03-11011 March 2019 Issuance of Amendment No. 159 Methodology for Analysis of Seismic Category I Structures with Concrete Affected by Alkali-Silica Reaction ML18247A5382018-11-27027 November 2018 Issuance of Amendment No. 158 Removing Requirement to Perform Certain Surveillance Requirements During Shutdown and Changes to Administrative Technical Specifications ML18199A6092018-08-0707 August 2018 Issuance of Amendment No. 157 Changes to the Technical Specifications Requirements for DC Batteries (CAC No. MG0046; EPID L-2017-LLA-0289) ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML17102A8892017-04-13013 April 2017 Issuance of Amendment Licensing Basis Change for Service Water Cooling Tower ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17080A0382017-03-27027 March 2017 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML17046A4432017-03-15015 March 2017 Issuance of Amendment Extension of Containment Leakage Rate Test Frequency ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16321A4182016-12-0101 December 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 (CAC Nos. MF0836 and MF0837) ML15096A2552015-11-0202 November 2015 Issuance of Amendment Regarding License Amendment Request 14-04, Revised Reactor Coolant System Pressure-Temperature Limits Applicable for 44 Effective Full Power Years ML15231A1442015-10-0606 October 2015 Issuance of Amendment No. 150 Regarding Note for Reactor Coolant System Surveillance Requirements ML15096A1432015-07-28028 July 2015 Exemption from Specific Requirements of 10 CFR Part 50, Appendix G, and 10 CFR 50.60 ML15205A3332015-07-28028 July 2015 Safety Evaluation by the Office of Nuclear Reactor Regulation Related to Request for Exemption from Table 1 of 10 CFR Part 50, Appendix G NextEra Energy Seabrook, LLC Seabrook Station, Unit 1 Docket No. 50-443 ML15096A1312015-07-17017 July 2015 Issuance of Amendment Regarding Changes to Technical Specification 3.3.3.1, Radiation Monitoring for Plant Operations ML15118A6322015-05-18018 May 2015 Issuance of Amendment Regarding License Amendment Request Regarding New Fuel Valut ML15082A2332015-04-24024 April 2015 Issuance of Amendment Regarding Increase Voltage Limit for Diesel Generator Load Rejection Surveillance Requirement ML15058A7062015-04-22022 April 2015 Issuance of Amendment No. 146 Regarding the Cyber Security Plan Implementation Schedule ML15002A2512015-03-31031 March 2015 Unit No.1 - Issuance of Amendment Regarding License Amendment Request 14-06, Application Regarding the Removal of the Cold Leg Injection Permissive from Technical Specifications ML14345A2882015-02-0606 February 2015 Issuance of Amendment Regarding Technical Specifications Task Force Traveler-523, Generic Letter 2008-01, Managing Gas Accumulation Using the Consolidated Line Item Improvement Process ML14363A2752015-02-0404 February 2015 Non-Proprietary SE for Issuance of Amendment Regarding License Amendment Request Regarding Fixed Incore Detector System Analysis ML14184A7952014-09-0303 September 2014 Issuance of Amendment Regarding License Amendment Request Regarding Fuel Storage Changes ML13212A0692014-07-24024 July 2014 Issuance of Amendment Regarding the Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML14071A4102014-04-10010 April 2014 Request for Relief RA-14-001 from American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI Requirements Regarding the Reactor Vessel Head Flange Seal Leak Detection Piping (TAC No. Mfxxxx) ML14029A4452014-03-0606 March 2014 Issuance of Amendment Regarding License Amendment Request 12-04, Application Regarding Cold Leg Injection Permissive ML13213A1432014-03-0505 March 2014 Issuance of Amendment Regarding the Use of Optimized Zirlo Fuel Rod Cladding Material ML13247A7772014-02-0909 February 2014 Request for Relief to Use an Alternative to the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML13107A0162013-10-25025 October 2013 Issuance of Amendment Regarding the License Amendment Request 13-02, Application to Revise Technical Specifications to Adopt TSTSF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection.. ML13074A7602013-06-17017 June 2013 Issuance of Amendment Regarding the Administrative Changes and Corrections to the Technical Specifications ML13050A1382013-06-13013 June 2013 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML1130000632013-04-23023 April 2013 Issuance of Amendment Addition of Action Statement to Limiting Condition for Operation 3.6.5.1, Containment Enclosure Emergency Air Cleanup System 2023-03-23
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON. D.C. November 2,2012 Mr. Kevin Walsh, Vice President Seabrook Nuclear Plant clo Michael O'Keefe NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 SEABROOK STATION, UNIT NO.1-ISSUANCE OF AMENDMENT RE: CYBER SECURITY PROGRAM (TAC NO. ME8959) Dear Mr. Walsh: The Commission has issued the enclosed Amendment No. 132 to Facility Operating License No. NPF-86 for the Seabrook Station, Unit NO.1 (Seabrook). This amendment consists of changes to the facility operating license in response to your application dated June 20, 2012. The amendment revises the scope of the Cyber Security Plan Implementation Schedule Milestone #6 and the existing license condition in the facility operating license. A copy of our safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice. Sincerely, , , .' ) < /" John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 Enclosures: 1. Amendment No. 132 to NPF-86 2. Safety Evaluation cc w/encls: Distribution via Listserv UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 NEXTERA ENERGY SEABROOK, LLC, ET AL.* DOCKET NO. 50-443 SEABROOK STATION, UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 132 License No. NPF-86 The Nuclear Regulatory Commission (the Commission) has found that: The application for amendment filed by NextEra Energy Seabrook, LLC, et at., (the licensee) dated June 20,2012, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied *NextEra Energy Seabrook, LLC is authorized to act as agent for the: Hudson Light & Power Department, Massachusetts Municipal Wholesale Electric Company, and Taunton Municipal Ught Plant and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
-2 Accordingly, the license is amended by changes to paragraphs 2.C.(2} and 2.E of Facility Operating License No. NPF-86 is and hereby amended to read as follows: Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 132, and the Environmental Protection Plan contained in Appendix B are incorporated into the Facility License No. NPF-86. NextEra Energy Seabrook, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. Physical Security The licensee shall fully implement and maintain in effect all provisions of the Commission'-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, submitted by letter dated September 23, 2004, and supplemented by letters dated October 15, October 22, and October 29,2004, and May 18, 2006, is entitled: "Florida Power and Light & FPL Energy Seabrook Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan." The set contains Safeguards Information protected under 10 CFR 73.21. NextEra Energy Seabrook, LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p}. The NextEra Energy Seabrook, LLC CSP was approved by License Amendment No. 127 (as supplemented by a clarification approved by License Amendment NO.132). This license amendment is effective as of the date of its issuance and shall be implemented by December 31,2012. COMMISSION Meena Khanna, Chief Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Attachment: Changes to the License Date of Issuance: November 2. 2012 ATTACHMENT TO LICENSE AMENDMENT NO. FACILITY OPERATING LICENSE NO. DOCKET NO. Replace the following pages of Facility Operating license No. NPF-86 with the attached pages. The revised pages are identified by amendment number and contain marginal lines indicating the area of change. Remove Insert 3 3 6 6
-NextEra Energy Seabrook, LLC, pursuant to the Act and 10 CFR 30, 40, and 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; NextEra Energy Seabrook, LLC, pursuant to the Act and 10 CFR 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; NextEra Energy Seabrook, LLC, pursuant to the Act and 10 CFR 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility authorized herein; and DELETED This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; is subject to the additional conditions specified or incorporated below: Maximum Power Level NextEra Energy Seabrook, LLC, is authorized to operate the facility at reactor core power levels not in excess of 3648 megawatts thermal (100% of rated power). Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 132 *, and the Environmental Protection Plan contained in Appendix B are incorporated into the Facility License No. NPF-86. NextEra Energy Seabrook, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. License Transfer to FPL Energy Seabrook. LLC** On the closing date(s) of the transfer of any ownership interests in Seabrook Station covered by the Order approving the transfer, FPL Energy Seabrook, LLC**, shall obtain from each respective transferring owner all of the accumulated decommissioning trust funds for the facility, and ensure the deposit of such funds and additional funds, if necessary, into a decommissioning trust or trusts for Seabrook Station established by FPL Energy Seabrook, LLC**, such that the amount of such funds deposited meets or exceeds the amount required under 10 CFR 50.75 with respect to the interest in Seabrook Station FPL Energy Seabrook, LLC**, acquires on such dates(s).
- Implemented ** On April 16,2009, the name "FPL Energy Seabrook, LLC" was changed to "NextEra Energy Seabrook. LLC". AMENDMENT NO. 132
-E. Physical Security The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to tpe authority of 10 CFR 50.90 and 10 CFR 50.54{p}. The combined set of plans, submitted by letter dated September 23, 2004, and supplemented by letters dated October 15, October 22, and October 29, 2004, and May 18, 2006, is entitled: "Florida Power and Light & FPL Energy Seabrook Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan." The set contains Safeguards Information protected under 10 CFR 73.21. NextEra Energy Seabrook. LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP). including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p}. The NextEra Energy Seabrook, LLC CSP was approved by License Amendment No. 127 (as supplemented by a clarification approved by License Amendment No. 132). F. Fire Protection NextEra Energy Seabrook, LLC, shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report, the Fire Protection Program Report, and the Fire Protection of Safe Shutdown Capability report for the facility, as supplemented and amended, and as approved in the Safety Evaluation Report, dated March 1983; Supplement 4, dated May 1986; Supplement 5, dated July 1986; Supplement 6, dated October 1986; Supplement 7, dated October 1987; and Supplement 8, dated May 1989 subject to the following provisions: NextEra Energy Seabrook, LLC, may make changes to the approved fire protection program without prior approval of the Commission, only if those changes would not adversely affect the ability to achieve and maintain shutdown in the event of a fire. G. DELETED H. Financial Protection The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims. I. DELETED 1The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan. Amendment No. 00, 113 122, UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE RELATED TO AMENDMENT NO. 132 TO FACILITY OPERATING LICENSE NO. NPF-86 NEXTERA ENERGY SEABROOK, LLC, ET AL.* SEABROOK STATION, UNIT NO.1 DOCKET NO. 50-443 1.0 INTRODUCTION By application dated June 20, 2012, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 12178A070), NextEra Energy Seabrook, LLC (NextEra, the licensee) requested changes to the facility operating license for Seabrook Station, Unit 1 (Seabrook). The proposed changes would revise the scope of Cyber Security Plan (CSP) Implementation Schedule Milestone 6 and the existing license condition in the facility operating license. Milestone 6 of the CSP implementation schedule concerns the identification, documentation, and implementation of cyber security controls (technical, operational, and management) for critical digital assets (CDAs) related to target set equipment. NextEra is requesting to modify the scope of Milestone 6 to apply to the technical cyber security controls only. The operational and management controls, as described in Nuclear Energy Institute (NEI) 08-09, Revision 6, "Cyber Security Plan for Nuclear Power Reactors," would be implemented concurrent with the full implementation of the cyber security program (Milestone 8). Thus, all CSP activities would be fully implemented by the completion date, identified in Milestone 8 of the licensee's CSP implementation schedule. Portions of the letter dated June 20,2012, contain sensitive unclassified non-safeguards information and, accordingly, those portions are withheld from public disclosure. 2.0 REGULATORY EVALUATION The U.S. Nuclear Regulatory Commission (NRC) staff reviewed and approved the licensee's existing CSP implementation schedule by License Amendment No. 127, dated August 23, 2011 (ADAMS Accession No. !\IlL112070048), concurrent with the incorporation of the CSP into the facility current licensing basis. The NRC staff considered the following regulatory requirements and guidance, in its review of the current license amendment request, to modify the existing CSP implementation schedule: Enclosure
-2 Title 10 of the Code of Federal Regulations (10 CFR) 73.54 states: "Each [CSP] submittal must include a proposed implementation schedule. Implementation of the licensee's cyber security program must be consistent with the approved schedule." The licensee's facility operating license includes a license condition that requires the licensee to fully implement and maintain in effect all provisions of the approved CSP. Amendment No. 127, dated August 23,2011, which approved the licensee's CSP and implementation schedule, included the following statement: "The implementation of the CSP, including the key intermediate milestone dates and the full implementation date, shall be in accordance with the implementation schedule submitted by the licensee by letter March 31, 2011, and approved by the NRC staff with this license amendment. All subsequent changes to the NRC-approved CSP implementation schedule will require prior NRC approval pursuant to 10 CFR 50.90." In a letter to NEI dated March 1, 2011 (ADAMS Accession No. ML 11 0070348), the NRC staff acknowledged that the cyber security implementation schedule template was "written generically, and licensees that use the template to develop their proposed implementation schedules may need to make changes to ensure the submitted schedule accurately accounts for site-specific activities." 3.0 TECHNICAL EVALUATION Amendment No. 127 to Facility Operating License No. NPF-86 for the Seabrook Station was issued on August 23, 2011. The NRC staff also approved the licensee's CSP implementation schedule, as discussed in the safety evaluation issued with the amendment. The implementation schedule had been submitted by the licensee based on a template prepared by NEI, which the NRC staff found acceptable for licensees to use to develop their CSP implementation schedules (ADAMS Accession No. ML 110600218). The licensee's proposed implementation schedule for the cyber security program identified completion dates and bases for the following eight milestones: Establish the Cyber Security Assessment Team; Identify Critical Systems and CDAs; Install a deterministic one-way device between lower level devices and higher level devices; Implement the security control "Access Control For Portable And Mobile Devices," Implement observation and identification of obvious cyber related tampering to existing insider mitigation rounds by incorporating the appropriate elements; Identify, document, and implement cyber security controls as per "Mitigation of Vulnerabilities and Application of Cyber Security Controls" for CDAs that could adversely impact the design function of physical security target set equipment; 7) Commence ongoing monitoring and assessment activities for those target set CDAs whose security controls have been implemented; and Fully implement the CSP.
-3 3.1 Licensee's Proposed Change Currently, Milestone 6 of Seabrook's CSP requires NextEra to identify, document, and implement cyber security controls for CDAs that could adversely impact the design function of physical security target set equipment by December 31, 2012. These cyber security controls consist of technical, operational and management security controls. In its June 20, 2012, application, NextEra proposed to modify Milestone 6 to change the scope of the cyber security controls due to be implemented on December 31,2012, to include only the NEI 08-09, Revision 6, Appendix D, "Technical Security Controls." NextEra proposes to amend its CSP to provide that operational and management security controls, identified in Milestone 6, will be fully implemented by a later date, which is the completion date identified in Milestone 8 of the CSP implementation schedule. The licensee stated that implementing the technical cyber security controls for target-set CDAs provides a high degree of protection against cyber-related attacks that could lead to radiological sabotage. The licensee further stated that many of its existing programs are primarily procedure-based programs and must be implemented in coordination with the comprehensive cyber security program. The licensee also stated that the existing programs currently in place at Seabrook (e.g., physical protection, maintenance, configuration management, and operating experience) provide sufficient operational and management cyber security protection during the interim period, until the cyber security program is fully implemented. 3.2 NRC Staff Evaluation The underlying purpose of the Cyber Security Implementation Schedule was for licensees to demonstrate ongoing implementation of their CSP prior to full implementation, which is set for the date specified in Milestone 8. In addition to Milestone 6 and its associated activities, licensees will be completing six other milestones (Milestones 1 through 5 and Milestone 7) by December 31,2012. Activities include establishing a Cyber Security Assessment Team, identifying critical systems and CDAs, installing deterministic one-way devices between defensive levels, implementing access control for portable and mobile devices, implementing methods to observe and identify obvious cyber-related tampering, and conducting ongoing monitoring and assessment activities for target set CDAs. In the aggregate, the interim milestones demonstrate ongoing implementation of the cyber security program at Seabrook. The NRC staff has reviewed NextEra's evaluation of the proposed change in its submittal dated June 20, 2012, and, as set forth below, finds that by completing Milestones 1 through 5, Milestone 6 with implementation of technical controls to target-set CDAs, and Milestone 7, Seabrook will have an acceptable level of cyber security protection until full program implementation is achieved. Technical cyber security controls include access controls, audit and accountability, CDA and communications protection, identification and authentication, and system hardening. These controls are executed by computer systems, as opposed to people, and consist of hardware and software controls that provide automated protection to a system or application. Implementation of technical cyber security controls promotes standardization, trust, interoperability, connectivity, automation, and increased efficiency. For these reasons, the NRC staff concludes that the licensee's approach is acceptable. The NRC staff also recognizes that full implementation of operational and management cyber security controls, in accordance with requirements of the Seabrook CSP, will be achieved with full implementation of the Seabrook CSP by the date set in Milestone 8. That is, all required elements for the operational and management cyber security controls, in accordance with the Seabrook CSP, will be implemented in their entirety at the time of full implementation of the CSP. The NRC staff does not regard the CSP milestone implementation dates as regulatory commitments that can be changed unilaterally by the licensee, particularly in light of the regulatory requirement at 10 CFR 73.54, that H[iJmplementation of the licensee's cyber security program must be consistent with the approved schedule." As the NRC staff explained in its letter to all operating reactor licensees dated May 9, 2011 (ADAMS Accession No. ML 110980538), the implementation of the plan, including the key intermediate milestone dates and the full implementation date shall be in accordance with the implementation schedule submitted by the licensee and approved by the NRC. All subsequent changes to the approved CSP implementation schedule, thus, will require prior NRC approval, pursuant to 10 CFR 50.90. 3.3 Revision to License Condition By letter dated June 20, 2012, the licensee proposed to modify Paragraph 2.E, "Physical Security," of Facility Operating License No. NPF-86, which provides a license condition to require the licensee to fully implement and maintain in effect all provisions of the approved CSP. The license condition in Paragraph 2.E of Facility Operating License No. NPF-86 for Seabrook is modified as follows: E. Physical Security The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans 1, submitted by letter dated September 23, 2004, and supplemented by letters dated October 15, October 22, and October 29,2004, and May 18, 2006, is entitled: "Florida Power and Light & FPL Energy Seabrook Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan." The set contains Safeguards Information protected under 10 CFR 73.21. NextEra Energy Seabrook, LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The NextEra Energy Seabrook, LLC CSP was approved by License Amendment No. 127 (as supplemented by a clarification approved by License Amendment No. 132).
-3.4 Summary Based on its review of the NextEra's license amendment request, as set forth above, the NRC staff concludes that the proposed changes to Milestone #6 of the licensee's CSP implementation schedule are acceptable. The NRC staff also concludes that, upon full implementation of the licensee's cyber security program, the requirements of the licensee's CSP and 10 CFR 73.54 will be met. Therefore, the NRC staff finds the proposed changes acceptable. 4.0 STATE CONSULTATION In accordance with the Commission's regulations, the New Hampshire and Massachusetts State officials were notified of the proposed issuance of the amendment. The State officials provided no comments. 5.0 ENVIRONMENTAL CONSIDERATION This amendment relates solely to safeguards matters and does not involve any significant construction impacts. Accordingly, this amendment meets the eligibility criteria for categorical exclusion set for in 10 CFR 51.22(c)(12). Pursuant to 10 CFR 51.22(b), no environmental assessment need to be prepared in connection with the issuance of this amendment. 6.0 CONCLUSION The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner; (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations; and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Principal Contributor: Monika Coflin Date: November 2,2012 November 2,2012 Mr. Kevin Walsh Site Vice President c/o Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 SEABROOK STATION, UNIT NO.1-ISSUANCE OF AMENDMENT RE: CYBER SECURITY PROGRAM (TAC NO. ME8959) Dear Mr. Walsh: The Commission has issued the enclosed Amendment No. 132 to Facility Operating License No. NPF-86 for the Seabrook Station, Unit No.1 (Seabrook). This amendment consists of changes to the facility operating license in response to your application dated June 20, 2012. The amendment revises the scope of the Cyber Security Plan Implementation Schedule Milestone #6 and the existing license condition in the facility operating licenses. A copy of our safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice. Sincerely, Ira! John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 Enclosures: 1. Amendment No. 132 to NPF-86 2. Safety Evaluation cc w/encls: Distribution via Listserv DISTRIBUTION: PUBLIC LPLI-2 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl1-2 Resource RidsRgn1 MailCenter Resource RidsNsirDsp Resource RidsNrrPMSeabrook Resource RidsNrrLAABaxter Resource RidsOgcRp Resource REnnis, NRR/DORL ADAMS Accession No" ML12237 A094 "" *via memorandum OFFICE NAME LPL 1-2/PM' I JLamb ? p:J LPL1-2/LA ABaxter NSIR/BC CErlanger* OGC-NLO RWeisman LPL1-2/BC MKhanna i DATE 09/26/2d12 09/25/2012 08/21/2012 ..OffiCial Record Copy 10/18/2012 11/212012