Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 April 25. 2013 Mr. Kevin Walsh. Site Vice President c/o Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT NO. 1-CORRECTION TO ISSUANCE OF AMENDMENT 136 RE: ADDITION OF ACTION STATEMENT TO LIMITING CONDITION FOR OPERATION 3.6.5.1, "CONTAINMENT ENCLOSURE EMERGENCY AIR CLEANUP SYSTEM" (TAC NO. ME3988)
Dear Mr. Walsh:
On April 23, 2013 (Agencywide Documents and Access Management System Accession No. ML113000063), the Commission issued Amendment No. 136 to Facility Operating License No. NPF-86 for the Seabrook Station, Unit NO.1. This amendment consisted of changes to the Technical Specifications (TSs) in response to your application dated May 14, 2010, as supplemented by letters dated August 24, 2010, September 16, 2011, March 15,2012, July 2,2012, and January 31,2013.
The staff made an editorial error on page 2 of the amendment, by including the following sentence: "Implementation of the amendment shall include development of written procedures that describe compensatory measures to be taken in the event of entry into the proposed new action for two inoperable trains of the Containment Enclosure Emergency Air Cleanup System due to an inoperable Containment Enclosure Boundary." This sentence is being deleted.
A copy of the corrected page is enclosed.
G. Lamb, Senior Project Manager nt Licensing Branch 1-2
. ision of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosure:
Corrected page cc w/encl: Distribution via Llstserv
ENCLOSURE REVISED AMENDMENT PAGE NUMBER 2 FOR AMENDMENT NO. 136 DATED APRIL 23,2013
- 2
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-86 is hereby amended to read as follows:
(2)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 136, and the Environmental Protection Plan contained in Appendix B are incorporated into the Facility License No. NPF-86.
NextEra Energy Seabrook, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION Meena Khanna, Chief Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the License and Technical Specifications Date of Issuance: April 23, 2013
April 25,2013 Mr. Kevin Walsh, Site Vice President c/o Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT NO.1 - CORRECTION TO ISSUANCE OF AMENDMENT 136 RE: ADDITION OF ACTION STATEMENT TO LIMITING CONDITION FOR OPERATION 3.6.5.1. "CONTAINMENT ENCLOSURE EMERGENCY AIR CLEANUP SYSTEM" (TAC NO. ME3988)
Dear Mr. Walsh:
On April 23, 2013 (Agencywide Documents and Access Management System Accession No. ML113000063), the Commission issued Amendment No. 136 to Facility Operating License No. NPF-86 for the Seabrook Station, Unit NO.1. This amendment consisted of changes to the Technical Specifications (TSs) in response to your application dated May 14, 2010, as supplemented by letters dated August 24,2010, September 16,2011, March 15, 2012, July 2, 2012, and January 31, 2013.
The staff made an administrative error on page 2 of the amendment, by including the following sentence: "Implementation of the amendment shall include development of written procedures that describe compensatory measures to be taken in the event of entry into the proposed new action for two inoperable trains of the Containment Enclosure Emergency Air Cleanup System due to an inoperable Containment Enclosure Boundary." This sentence is being deleted.
A copy of the corrected page is enclosed.
Sincerely,
/ra!
John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosure:
Corrected page cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPLI-2 RlF RidsAcrsAcnw MailCTR Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl1-2 Resource RidsRgn1 MailCenter Resource RidsNrrDirsltsb Resource RidsNrrPMSeabrook Resource RidsNrrLMBaxter Resource RidsNrrAadb Resource RidsNrrCvib Resource ADAMS Accession No'.. ML13114A317 OFFICE LPL1-21PM LPL1-2/LA LPL1-21BC LPL1-2/PM NAME JLamb ABaxter MKhanna JLamb DATE 04/25/13 04/24/13 04/25113 04/25/13 Official Record Copy