05000440/LER-2014-001, Failure to Comply with Technical Specification 3.4.11 - Reactor Coolant System Pressure/Temperature Limits

From kanterella
Revision as of 22:50, 10 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Failure to Comply with Technical Specification 3.4.11 - Reactor Coolant System Pressure/Temperature Limits
ML14066A037
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/04/2014
From: Harkness E
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-14-096 LER 14-001-00
Download: ML14066A037 (5)


LER-2014-001, Failure to Comply with Technical Specification 3.4.11 - Reactor Coolant System Pressure/Temperature Limits
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
4402014001R00 - NRC Website

text

FENOCQM FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant PO. Box 97 10 Center Road Perry Ohio 44081 Ernest J. Harkness Vice President 440-280-5382 Fax: 440-280-8029 March 4, 2014 L-14-096 1 0CFR50.73(a)(2)(i)(B)

ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Licensee Event Report Submittal Enclosed is Licensee Event Report (LER) 2014-001, "Failure to Comply With Technical Specification 3.4.11, Reactor Coolant System Pressure/Temperature Limits." There are no regulatory commitments contained in this submittal.

If there are any questions or if additional information is required, please contact Mr. Nicola Conicella, Manager-Regulatory Compliance, at (440) 280-5415.

Sincerely, Ernest J. Harkness

Enclosure:

LER 2014-001 cc:

NRC Project Manager NRC Resident Inspector NRC Region III 21

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 01/3112017 (01-2014)

, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

1. FACILITY NAME
2. DOCKET
6. LER NUMER
3. PAGE SEQUENTIAL REV YER NUMBER NO.

4O Perry Nuclear Power Plant 05000- 440 2014 --

001 004 4

CORRECTIVE ACTIONS

A Standing Order was implemented for control room personnel prohibiting plant evolutions with a vacuum being drawn on the RPV until all associated issues with TS 3.4.11 have been resolved.

PNPP will submit a license amendment request to revise the P/T curves in TS 3.4.11 to allow operations with a vacuum on the vessel.

The Operations Training Lesson Plan and Presentation related to TS 3.4.11 was revised to include lessons learned from this event.

PREVIOUS SIMILAR EVENTS

A review of Licensee Event Reports and the corrective action database for the past three years determined that one similar event had occurred.

LER 2011-002-01, Condition Prohibited by Technical Specifications and Plant Shutdown due to Unit 1 Startup Transformer Issues, documented a misinterpretation of TS resulting in the conclusion that the backfeed lineup could not be credited as a qualified off-site circuit to comply with TS. Corrective actionswere focused on resolving the issues with crediting the backfeed lineup and could not be reasonably expected to prevent the event in LER 2014-001.

COMMITMENTS

There are no regulatory commitments contained in this LER. Actions described in this document represent intended or planned actions, are described for the NRC information, and are not regulatory commitments.

/