Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000440/LER-2017-0061 December 2017Loss of Safety Function due to the Inoperability of Both Trains of Motor Control Center Ventilation
LER 17-006-00 for Perry Nuclear Power Plant Regarding Loss of Safety Function due to the Inoperability of Both Trains of Motor Control Center Ventilation
Probabilistic Risk Assessment
Large early release frequency
05000440/LER-2017-0044 October 2017Loss of Safety Function for High Pressure Core Spray Suppression Pool Level Instrumentation
LER 17-004-00 for Perry re Loss of Safety Function for High Pressure Core Spray Suppression Pool Level Instrumentation
Probabilistic Risk Assessment
Local Leak Rate Testing
Large early release frequency
05000440/LER-2017-0054 October 2017Controller Malfunction results in Momentary Degradation of Secondary Containment Pressure
LER 17-005-00 for Perry Nuclear Power Plant Regarding Controller Malfunction Results in Momentary Degradation of Secondary Containment Pressure
Probabilistic Risk Assessment
05000440/LER-2017-00227 June 2017Loss of Safety Function Due to Main Turbine Bypass Valve Opening
LER 17-002-00 for Perry Nuclear Power Plant Regarding Loss of Safety Function Due to Main Turbine Bypass Valve Opening
Probabilistic Risk Assessment
Large early release frequency
05000440/LER-2017-00326 June 2017Annulus Exhaust Gas Treatment System Loss of Safety Function
LER 17-003-00 for Perry Nuclear Power Plant Regarding Annulus Exhaust Gas Treatment System Loss of Safety Function
05000440/LER-2016-00424 February 2017Loss of Safety Function Due to Two Inoperable Standby Liquid Control Subsystems
LER 16-004-00 for Perry Regarding Loss of Safety Function Due to Two Inoperable Standby Liquid Control Subsystems
Safe Shutdown
Probabilistic Risk Assessment
Large early release frequency
L-16-366, LER 16-03-001 for Perry Nuclear Power Plant Loss of Safety Related Electrical Bus Results in a Loss of Shutdown Cooling21 December 2016LER 16-03-001 for Perry Nuclear Power Plant Loss of Safety Related Electrical Bus Results in a Loss of Shutdown Cooling
L-16-365, LER 16-01-001 for Perry, Unit 1, Regarding Pressure Boundary Leakage, Level 8 Automatic SCRAM, and APRM Loss of Safety Function21 December 2016LER 16-01-001 for Perry, Unit 1, Regarding Pressure Boundary Leakage, Level 8 Automatic SCRAM, and APRM Loss of Safety FunctionPressure Boundary Leakage
ML16138A33417 May 2016ASP Analysis - Reject Perry Nuclear Power Plant, Unit 1 (440-2014-005)Squib
ML16138A33617 May 2016ASP Analysis - Reject Perry Nuclear Power Plant, Unit 1 (440-2014-004)Squib
05000440/LER-2016-0038 April 2016Loss of Safety Related Electrical Bus Results in a Loss of Shutdown Cooling
LER 16-003-00 for Perry Regarding Loss of Safety Related Electrical Bus Results in a Loss of Shutdown Cooling
Commercial Grade Dedication
05000440/LER-2016-0028 April 2016Manual Reactor SCRAM Due to Spurious Opening of Safety Relief Valves
LER 16-002-00 for Perry Regarding Manual Reactor SCRAM Due to Spurious Opening of Safety Relief Valve
Probabilistic Risk Assessment
05000440/LER-2016-00123 March 2016Pressure Boundary Leakage, Level 8 Automatic SCRAM, and APRM Loss of Safety Function
LER 16-001-00 for Perry Nuclear Power Plant Regarding Drywell Leakage, Level 8 Automatic SCRAM and APRM Loss of Safety Function
Probabilistic Risk Assessment
Feedwater Heater
Pressure Boundary Leakage
Unidentified leakage
L-13-194, LER 13-S02-01 for Perry, Unit 1 Regarding Security Weapon Left Unattended25 June 2013LER 13-S02-01 for Perry, Unit 1 Regarding Security Weapon Left Unattended
L-13-143, LER 13-S02-00, for Perry Nuclear Power Plant, Unit 1, Regarding Security Weapon Left Unattended30 April 2013LER 13-S02-00, for Perry Nuclear Power Plant, Unit 1, Regarding Security Weapon Left Unattended
L-13-119, LER 13-S01-00 for Perry Nuclear Power Plant, Unit 1, Regarding Local Power Range Monitors Delivered to the Incorrect Address15 March 2013LER 13-S01-00 for Perry Nuclear Power Plant, Unit 1, Regarding Local Power Range Monitors Delivered to the Incorrect Address
L-12-114, LER 12-S02-00, for Perry Nuclear Power Plant, Unit 1, Regarding Potential Vulnerability in a Safeguards Security System22 March 2012LER 12-S02-00, for Perry Nuclear Power Plant, Unit 1, Regarding Potential Vulnerability in a Safeguards Security SystemTime of Discovery
L-12-083, LER 12-S01-00, Latent Software Error Resulted in Improperly Authorized Visitor Access Into Protected Area29 February 2012LER 12-S01-00, Latent Software Error Resulted in Improperly Authorized Visitor Access Into Protected Area
L-08-052, LER 07-04-001 for Perry Nuclear Power Plant Re Automatic Reactor Protection System Actuation Due to Feedwater Control Power Supply Failure15 February 2008LER 07-04-001 for Perry Nuclear Power Plant Re Automatic Reactor Protection System Actuation Due to Feedwater Control Power Supply FailureProbabilistic Risk Assessment
ML05333012418 November 2005LER 05-03-00 for Perry Nuclear Power Plant Lack of Suction Flow Path Causes High Pressure Core Spray to Be InoperableProbabilistic Risk Assessment
Large early release frequency
Operability Determination
ML05096026317 December 2004Final Precursor Analysis - Perry Grid LoopFitness for Duty
Mission time