MONTHYEARML22111A1982022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures Part 2 of 5 ML22111A1992022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 3 of 5 ML22111A2002022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 4 of 5 ML22111A2222022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix E, Figures Part 2 of 2 ML17354A2052017-12-20020 December 2017 Revision 19 to Updated Safety Analysis Report, Chapter 3, Figure 3.6-1 Through Figure 3.11-16, Part 5 of 5 (Redacted) ML16306A0812016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 95 of 111 to 3.6-1, Sheet 100 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 43 of 111 to 3.6-1, Sheet 49 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 43 of 111 to 3.6-1, Sheet 49 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 50 of 111 to 3.6-1, Sheet 55 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 50 of 111 to 3.6-1, Sheet 55 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 56 of 111 to 3.6-1, Sheet 62 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 56 of 111 to 3.6-1, Sheet 62 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 63 of 111 to 3.6-1, Sheet 69 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 63 of 111 to 3.6-1, Sheet 69 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 70 of 111 to 3.6-1, Sheet 82 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 70 of 111 to 3.6-1, Sheet 82 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 83 of 111 to 3.6-1, Sheet 94 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 83 of 111 to 3.6-1, Sheet 94 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 101 of 111 to 3.6-1, Sheet 111 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 101 of 111 to 3.6-1, Sheet 111 of 111 ML16306A0792016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 70 of 111 to 3.6-1, Sheet 82 of 111 ML16305A3112016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 43 of 111 to 3.6-1, Sheet 49 of 111 ML16306A0772016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 56 of 111 to 3.6-1, Sheet 62 of 111 ML16306A0832016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 101 of 111 to 3.6-1, Sheet 111 of 111 ML16306A0802016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 83 of 111 to 3.6-1, Sheet 94 of 111 ML16306A0782016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 63 of 111 to 3.6-1, Sheet 69 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 95 of 111 to 3.6-1, Sheet 100 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 95 of 111 to 3.6-1, Sheet 100 of 111 ML16305A3122016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 50 of 111 to 3.6-1, Sheet 55 of 111 RS-13-157, Response to Request for Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)2013-07-0303 July 2013 Response to Request for Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 4 - Table of Contents Through Figure 4.6-302013-01-10010 January 2013 Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 4 - Table of Contents Through Figure 4.6-30 ML13016A3322013-01-10010 January 2013 Updated Safety Analysis Report, Revision 15, Chapter 4 - Table of Contents Through Figure 4.6-30 ML0709302592005-01-31031 January 2005 Cps/Usar, Chapter 15, Accident Analyses, Revision 11 ML0709303642005-01-31031 January 2005 Cps/Usar, Appendix F, Fire Protection Safe Shutdown Analysis, Revision 11 ML0709303622005-01-31031 January 2005 USAR, Figure 1 Through Figure 22 ML0709303612005-01-31031 January 2005 Cps/Usar, Fire Protection Evaluation Report, Revision 11 ML0709303602005-01-31031 January 2005 Cps/Usar, Appendix D, Requirements Resulting from TMI-2 Accident, Revision 11 ML0709202042005-01-31031 January 2005 Cps/Usar, Chapter 4, Reactor, Revision 11 ML0709202062005-01-31031 January 2005 Cps/Usar, Chapter 5, Reactor Coolant System and Connected System, Revision 11 ML0709302252005-01-31031 January 2005 Cps/Usar, Chapter 6, Engineered Safety Features, Revision 11 ML0709302282005-01-31031 January 2005 Cps/Usar, Chapter 7, Instrumentation and Control Systems, Revision 11 ML0709302292005-01-31031 January 2005 Cps/Usar, Chapter 8, Electric Power, Revision 11 ML0709302362005-01-31031 January 2005 Cps/Usar, Chapter 10, Steam and Power Conversion System, Revision 11 ML0709302452005-01-31031 January 2005 Cps/Usar, Chapter 12, Radiation Protection, Revision 11 ML0709302532005-01-31031 January 2005 Cps/Usar, Chapter 13, Conduct of Operations, Revision 11 ML0709302542005-01-31031 January 2005 Cps/Usar, Chapter 14, Initial Test Program, Revision 11 ML0709303592005-01-31031 January 2005 Cps/Usar, Appendix C, Computer Programs, Revision 11 ML0327306192003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.5-6 Through Chapter 3, Table 3.3-33 ML0327306182003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-20 Through 2.5-5 ML0327306172003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-12 Through 2.4-19 ML0327306162003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-2 Through 2.4-11 ML0327306152003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.1-3 Through 2.4-1 ML0327306132003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Figures 2.1-20 Through Plate 1 ML0327306102003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Attachment 1, Figures B-1-12 Through Figure B-2-2 ML0327216042003-09-25025 September 2003 Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.3-7 Through 2.3-15 2022-03-31
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML24092A3452024-04-0101 April 2024 Updated Safety Analysis Report (Usar), Revision 23 ML22216A2212022-05-19019 May 2022 2 to Updated Safety Analysis Report, Appendix E, Figures Part 1 of 2_Redacted RS-22-048, 2 to Updated Safety Analysis Report, B 2.0 Safety Limits (Sls)2022-03-31031 March 2022 2 to Updated Safety Analysis Report, B 2.0 Safety Limits (Sls) ML22111A1952022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Figures, Part 2 of 2 ML22111A2152022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 17, Quality Assurance ML22111A1912022-03-31031 March 2022 2 to Updated Safety Analysis Report, USAR Cover and List of Effective Pages (Loep) ML22111A2172022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix B, Construction Material Standards and Quality Control Procedures ML22111A2242022-03-31031 March 2022 2 to Updated Safety Analysis Report, Clinton Power Station Operational Requirements Manual (Orm) ML22111A2122022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML22111A2072022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems ML22111A2092022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22111A2142022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML22111A1902022-03-31031 March 2022 Submittal of Revision 22 to Updated Safety Analysis Report, Letter and Attachments A-F ML22111A1972022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 1 of 5 ML22111A2002022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 4 of 5 ML22111A1932022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Site Characteristics ML22111A1942022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Figures, Part 1 of 2 ML22111A1922022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22111A2062022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 8, Electric Power ML22111A2022022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 4, Reactor ML22111A2202022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix E, Fire Protection Evaluation Report ML22111A2032022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22111A2112022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML22111A2162022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix a, Glossary ML22111A1982022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures Part 2 of 5 ML22111A1992022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 3 of 5 ML22111A2182022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix C, Computer Programs ML22111A2082022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22111A2102022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 12, Radiation Protection ML22111A1962022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22111A2052022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 7, Instrument and Control Systems ML22111A2222022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix E, Figures Part 2 of 2 ML20105A2622020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management ML20105A2592020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 8, Electric Power ML20105A2702020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix B, Construction Material Standards and Quality Control Procedures ML20105A2712020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix C, Computer Programs ML20105A2632020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 12, Radiation Protection ML20105A2652020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML20105A2602020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems ML20105A2642020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML20105A2672020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML20105A2692020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix a, Glossary ML20105A2772020-03-31031 March 2020 1 to Updated Safety Analysis Report, CPS Operational Requirements ML20105A2682020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 17, Quality Assurance ML20105A2502020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.3-1, Part 1 of 5 ML20105A2512020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 2 of 5 ML20105A2522020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 3 of 5 ML20105A2612020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML20105A2532020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 4 of 5 ML20105A2752020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix E, Figures Part 2 of 2 2024-04-01
[Table view] |
Text
D I
I
-I c
9 A
I ___. _ __
~_
CfU tVHOICA SSW PU",P ROOM A SUPPLY rAN K-2 90<
SSW PUMP ROOM A 7.
IVHOIAA,8 SSW PUMP ROOM A COOUNG COILS K-290 ~
II IVHOICC SSW PUMP ROOM C SUPPLY F"N K-2904 II IVH03A SS W' PUMP A(.a MC COOLING COIL K-2902 IVH07SA SSW PUMP ROONA COIl. CASINET K-2502 SSW PUMP ROOM C i
IVH01$8 SSW ~UMP ROOMS COIL CABINtT
<- 2902 IVH07SC SSw FUMP ROOMe COIL CABINET K-2902 1\\ i' I
\\ 1 1
~
I 4
l L@HI7Y=-J
-I IVI.rOB'!-:
~SA~'TY RELATED
( SEE NOTE 2 )
IVHOICS SSW PU" P ROOM B SUPPLY FAN K-2904 Ai SLE EL. 657'- 6 '
IVH02AA,B SSW FUUP ROOM S COOLING COILS K-2902
/
...A,, __
REV. 2 SEPT. 1990 NON -
SAFETY RELATED
( SEE NOTE 2 )
o
~-
I SSW PUMP ROOM B N UClEA~ SAFETY RElATED ITEMS ARE SHOWN ON THIS DRAWING I,01: SAFETY CLASSIFICATION SEE ""ING, EQUIPMENT. VAlVE, 01 INST.OMENT lISH. I
~ :
I THE P ' IDle, I DIAG ItAMS fOR THE C, I FUNCTION SYMBOLS.... E SHOWN ON DItAWING Ml0-~I06 UNLESS OTHUWISE NOTED SHEET NUMIER & DIAGIAM REFERENCE.... E SHOWN IN THE FUNCTION SYMBOL 2 NUCLEAR SAFETY-RELATEO DUCTWORK SYSTEM \\S SHO\\'IN ON THIS P" In THIS CLASSIACATlON APPLIES 10 DUCTWORK AND DUCTWORK AO::ESSQRIES (E XCEPT DAMPERS )
FURNISHED FABRICATED AND INSTALLED UNDER SPECIACATiCN K - 2 910.
FOR SAFETY CLASSIFICATION C'F DUCTWORK SUPPORlS. SEE SUPPORT DRA'H\\NGS.
FOR SAFETY a..ASS1FICATION OF EQUIPMENT, ~
EQUIPMENT LIST.
FOR SAFE.TY CLASSIACATlOfli OF PIPING/VALVES SEE LlNf/VALVE LIST.
FOR SAFETY CLASSIFICATION OF DAMPERS. SEE APPROPRIATE DAWl'ER LI.;!S.!:.T. __________________
~_I CLINTON POWER STATION UPDATED SAFETY ANALYSIS REPORT FIGURE 3.6-1 DIVISIONAL SEPARATION AND HIGH-ENERGY P&ID'S-SHUTDOWN SERVICE WATER VENTILATION SHEET 95 OF 111
o c
B A
£:10 Z UiHS 60~H;OI"l IVPO 5 IVP23A A IVP2"IA8 IVPO"J2A IVPZ"IAA o
'9 7 IVP02.SA, 5C DRY WELL COOLING SYSTE;.:cM,=:=-=-=-"""",,"",
COIL CABINETS IA, IC
,vP""A 3/4 K -2.902.
H.P VENT TO Pl..... NT SERvICE WA.TER POO
=~~~;;:-'
IVP03PA DRYWELL CHILLED WATER PUMP IA
"'fOOL "EMOVAL FL""
iO FOI1.
I IVP04CA DRYWELL CHILLED WATER CHILLER 1.0.
K-2.905B tVPOtb9 tV P~4
.. A
.,.~
VPOSO
~
~o~~-------
E-4 L-_______ -'
D*'
NOTE' \\ ) INSTRUlv' ;f.J'" \\...001' \\'"
A,I!>A"-><>O ' ED I f'L" c.E KAleel K
' POllA 2.
IVP67AB I
IIVP085B IVP 02 OA 4 IVP20AA IvP03SlA.
IV P2QAB '
IvP 21A B 1 2,.
tVP2 1A A IV PO!:!lAO 2.
IVP OOB D Ivpoce c
~;J(,' RED. (1'Vp.)
IVP0 2.SA EL.n3*-13/4 - CAZ.. "5")
D*'
IVP05TA DRYWELL CHILLED WATER COMPRE5510N TANK I A K-2.839 IVP07MA CHEMICAL FEEDER BY 1. P. c.
IVPOBMA CORROSION TEST RACK (FIELD FA8)
BIO,"CP D I DO
~EISMIC IVP027A IVP !2AA IVPO;;SE, SF DRYWELL COOLING SYSTEM COIL CABINETS K-2902 REVISION 7 DECEMBER 1996
,,+XIO REO.
IV P O.3 EA 10 IV PD3G\\
10 IVPO~ C A 10 I"P02 8
IV i='20CB '
IVP29AA IVPQ4 7A I
0
I I
FUEL HP I VE.NT.
r.1 BLOb
/
~
T.e.
IVP44 AA...
,,,POi,,,
IVP2B M
,vPO. 6A I
1 """S:?'1~~~
T*C.
I _~
I
--of---- CDNT"INM<NT
&LDG ----I--DR~ WELL I
BIOlooCP 0100 SE.ISMIC I <
II/POB AA "1"'QlU=".c."A;--;I"'O" I ~
II/pez SA 10 Ivp4:,........ 3N
Pe"1iC NUCLEAR SAfETY *.ElATEDI ITEMS AlE SHOWN ()til THIS Dl!AWING I fOI SANTY CLASSI_IC~"ION Sli.....0.
1OU..-INt. YALVE. 01: INSTIUMINI Llltl. I B*
NOTE:
THE "
I D/ C &.1 DIAGRAMS FOR THE C &. I FUNCTION SYMlc:x.S AlE SHOWN ON DRAWING Ml0-~
UNLESS OTHERWISE NOTED. S.. ET NUMIU & DfAGIAM IEFfRENCIE.... 1 SHOWN IN THI FUN~TJOH SYMIOl.
FIGURE 3.6-1 DIVISIONAL SEPARATION AND HIGH-ENERGY P&ID'S-RYWELL COOLING CHILLED WATER SYSTEM SHEET 96 OF 111 o
c B
A
£,10 lVP2"16S
!.7 IVP0'l28 IVP2.q BA o
c 8
A 8
H.P. VENT CD..
c;..
c 7
IV P02.5B SD DRY WELL COOLlN'G SYSTEM 1;\\
COIL CABINETS I B, ID K-2.'302.
IV P 50 SA I'
IVP03S6 K-2.882.
NOTE \\
0-1 IVPQ2DB 4
I V P 2.0 e....
IVP03PB IVPZIBe PIP 'l I BA IVPO?A.L 2.~
I VP02.E L 2.
e IVP04C S DRYWELL CHILLED WATER CHILLER IS K-2.'3 0 5~
IV PO 3.3 l!o
\\ VPI!>CP I VPI~B8 II/z Y.F.
D 6
IVP05TB DRYWELL CHILLED WJ..TER COMPRESSION TANK I B K-2839
,o,a
' EP.
VP03A N ~
lV POe,..... P 4 IVPQ09t-J lVPOOB P IVP007N IV P02.e.... 4 IVPo'Z.et-J 4 IVP0 7MB CHEMICAL FEEDER BY I. P.C.
I.-J H.P. VENT IVP08MB CORROSION TEST RACK (FIELD FAB. l BIO,"CP C 100 BLDG, --~--- CONTA.'NMENT BLOG. --~!--OR,(W ELL BIO,"CP 0100 t
tv O ~" D IVP 0
- e.
s E.15M1-lc~r_-<5~E~T~"~I7~S~P:::S~' Gr~~:J I IVPOBAB,fit.
IvP02BB IVPY50M!,
lVPS4A8~
IV P0 2.SD E1.7"7 *-IO" (A.... 2"*)
IVP91D V2 IVP6330 1
NOlf:
REVISION 7 DECEMBER 1996 IV P 3BB 10,. B
~£t).
I ~M05-1046 >
"-'..:-=="-"-r-zSHT 4 ES.
MOS-!! 09 SHT. 2 Bt R.F.
NUCLEAR SAFETY RELATED ITEMS ARE SHOWN ON THIS DRAWING 1,01 SAFETY CI,ASSIFlCAltON SEI rtPlNG, IOU.,MENT, YALVE, oa INSTIUMINT LISTS. I THE ".. I DIC & I OIAGI:AMS fOI THE C & I FUNCTION SYMiOU AU: SHOWN ON O.,AWING M 10- 91 0 9
. U~LESS OTHUWlSE NOTfD. SHEET NUMln, DIAG.AM---
.EFEUNCE AU SHOWN IN THE FUNCTION SYM'OL.
FIGURE 3.6-1 DIVISIONAL SEPARATION AND HIGH-ENERGY P&ID'S-DRYWELL COOLING CHILLED WATER SYSTEM SHEET 97 OF 111 o
c B
8 Lrr-,
PRIMARY GONTAINMENT ATMOSPI-<ERE SPEC. NO. K-2801 HOSE FL ANGE TO MATCH ---1----____
BOLT CIRCLE OF PIPE FLANGE RPV DRYWELL UNIT-I TAP.SB CONT ALN ME NT FUEL BOUNDAR'(
BUILDING SEE NOTE 4 OR.YWE.LL CONTAINMENT
-TIGHT SHUTOFF BUTTERFLY DAMPER
- 4. DEBRIS SCREEN, SEE VO SPECIALTY UST.
- 5. NUCLEAR SAFETY-RELATED DUCTWORK SYSTEM IS. SHOWN ON THIS P&lD. THIS CLASSI FICATION APPLIES TO DUCTWORK AND DUCTWORk ACCESSORIES ( E XCEPT
~:~~i~io"~~~~SRH~~E~~~~~~~J~DK~~O.
FOR SAFETY CLASSIFICATION OF DUCTWORK SUPPORTS. SEE SUFPORT DRAWINGS.
~~~ ~~~~~ECNL: i~~rI CATION OF Eo.UIPMENT,
~: ~~~7~~L~iA t7J~~CATION OF PIPI~G/VALVES, FOR SAFETY CLASSIFICATiON OF DAMPERS, SEE APPROPRIATE DAMPER LIST.
6, PERSONNEL PROTECTION SCREEN.
7 FOR INTAKE WIRE MESH CONNECTION TO EXISTING PIPE. FLANGE DETAIL REFER TO DWG. M14-1044-6.
- 8. 70 CFN MIN./SOO CFM MAX DURING POST LOCA PURGE OF PRIMARY CONTAINMENT.
REV. 2 SEPT. 1990 EI5MIC CATEGORY' )
AUX. BLDG. I CONTROL BLDG.
CONTROL.. BLDe..
NOTES:
I. -ALL pNE.UMAnC PIPIN~ FOIOt INST!<UMENTS ANO c:.oNT~Ol." TO e,e: FuR.NISrtE;O ANO II'olM.... LL.D
~y '=>F'E.C.IFICAil0N IIC..- '2..~11 CONiRACTOR,
- 2. 8 " OIA. FLExIBLE HOSE SHALL 8E CONNECTED TO REA.CTOR NOZZLE. N-B FOR PURGING OF REACTOR VESSEL H EAD DuRING, SHUTDOWN.
THIS CONNEC7JON TO eE ~ADE... 5 QU ICKLY AS POSSIBLE AFTER REMOVAL OF BLIND FL ANG E.ON N-8.
~. FOR RADIATION MONITOR DETAILS SE~ 1'110-'(106 -
SH.I!o AND
- 20.
NUCLEAR SAfETY RELATED ITEMS ARE SHOWN ON THIS DRAWING I.01 SA.ITV ClASSI.tCATtOH SII,.PlNG, EQUIPMINT, VALVE, 01 INSTRUMENT LISTS. I NOTE THE "
I DIC 'I DIAGIAMS fOi THE C' I FUNCTION SYMIOlS AlE SHOWN ON DRAWING M IO_ctIJO UNLESS OTHERWISE NOTID. SHEET NUMln, DIAGIAM IEfUENCE AlE SHOWN IN flU fUNCTION SYMIOl 1
DIVISIONAL SEPARATION AND HIGH-ENERGY P&ID'S-DRYWELL PURGE 98 OF 11
o c
B A
I I I 1-90Vi
~.:I3 ' i NI 0 '1"
£8-80-£0 31V lOdMAll l:l OJ 311 OUTSIDE AIR I NT.A k'F LOUVER CFM FROM IVRI6A24 IVROIA CONTAINMENT BLDG. VENT.
SUPPLY AIR HEATING COIL K -2908 I VRO I A CONTINUOUS 8000
~8~l:INMENT SHT~~-I >----'::C:;F:7M---'-~
<1200 EXHAUST FROM FUEL BUILDING FROM TURB I NE BUILD I NG FROM CONTAINMENT BLDG. VENT.
8 COMMON STATI ON HVAC STACK CFM 3_2660 CFM 20000 CFM 20000 CFM 24000 CFM 6400 CFM OCA038 16 IGS2 0.C 12
'lEE" NOTE 4 16270 (&000 ) (0)
CFM (CFM) (CFMj IVR02A CONTAl NMENT BLDG. VENT.
SUPPLY AIR COOLING COIL K -2906 I VR02A FROM COUNTING ROOM AUX.
DEeON.
141,070 CFM
- 11 01-1 C1 FROM FUEL BLDG.
FROM AUX.
BL~G.
DRY WEL L PURGE OIV. X 01 V. X IVR03CA.CB CONTAINMENT BLDG. VENT.
SUPPLY FANS I A. 18 K-2904 IVR03CA IVR03CB DIV X IVROBYA
~
3C 0
fT 0
~
u 10 89,770 16, Z70 CFM CFM I '/R07XA g~
I!! U DIV X IVRQBYB IVR04CA.CB CONTAINMENT B L~G. VENT.
! VR06X EXHAUST FANS lAo 18 K -2904
';" OJ A. ?l AItl END OPEN TO FUEL HANDLI NG B L~G.
3 IVR07XA & IVR07XB SILENC ER K-2910 FOR POS T L OC t. PURGE 7"'OCFM -MIN, '
600 CF,M MAX.
IVR04CB DIV X 16270 CFM NOTE:
FUEL BLDG.
CONT A I NMENT BY P. C.
(PIPING TO END REVISION 7 JUNE 1997
~6S~?~~E A~FTER ----I...--'~::-.:.:"7~
ISOLATION VALVE)
BIOGep PIPE SPEC. NO. K-2882 FROM CONTAINMENT EXHAUST PENETRAT ION NOTE ;
-~l DEBRIS SCREEN SEE VA SYSTEM SPECIALTY LIST.
!IVRI33YA;(S,YC,'<D0 NOTE:
fill[ _
IVillmA.IVRD3YB, MIIJlYC, NClIVRD3'1'tl _
IN PIIIULUL ilDlVIX Wme/ THE COW>ION cueT.
2 INSTALL BLANK -OFF PLATE -14 THICK SEE VR SPECIALTY LIST.
- 3. NPMBERS IN PARENTHESIS INOICATE Fl.JJN WHEN ONLY 16 2 70 o=M SYSTEM IS OPERATING 416210 CFMWHEN ORYWELL
~GE FILTER LNlTS ARE CPERATING /lK) CONTAINMENT VENT IS ON
~~~~T~E~O~~~~b~s~~~AI~~~ ~~I~GE IS ON. 0 CFM WHEN O"YW£LL PURGE FILTER UNITS ARE NOT OPERATING
- 5. NUCLE AR SAFETY-REL ATED DUCTWORK SYSTEM IS SHOWN ON THIS P&. ID. T HI S CLASSIFICATION APPLIES TO DUCTWORK AND DUCTYr'ORK ACCESSORIES (EXCEPT DAMPERS) FURNI SHED, FABRICATED AND INSTALLED UNDER SPECIFICATiON K-2910. FOR SAFETY CLASSIFICATION OF DUCTWORK THE P & IOIC & I OETAILS FOR THE C & I
~g~Pi'~?r~EEL!~:I~?t.rTI~~ A 6'~N~~u J PM E NT, SEE EQUJPMENT LJ ST.
NUCLEAR SAFETY RELATED ITEIotS ARE SHOWN ON THIS DRAWING
~~~ ~~r;~;C¢Ess~r~fATJON OF PJPJNG/VALVES,
~
(CON'T.)
IFOR SAFETY CLASSIFICATION SEE PIPINC.
EOUIPr.NT. VALVE. OR INSTRUr.tH LISTS.)
FUNCTION SYWBOlS ARE SHOWN ON DRAWING ~
UNLESS OTHERWISE NDTEO. SHEET NUWBER & OETAIL REFERENCE ARE SHOWN IN THE FUNCTION SYWBOl.
FOR SAFETY CLASSIFICATION OF DAMPERS, SE E APPROPR IATE DAMPER LIST.
- 6. AIR FLC1NS SHOWN FOR FANS IVR03CJVCB ANO IVR04CAlCB MAY RE5U..T L'l UNSTABLE FAN OPERATION. IPC HAS DETER -
MINED TrlAT THIS CONDITION IS ACCEPTAB'..E UNTIL AT LEAST THE FIRSTOUTAGE. (REF.IPC LTR. NO.S-6083).
4 FIGURE 3.6-1 DIVISIONAL SEPARATION AND HIGH-ENERGY P&ID'S-CONTAINMENT BLDG. HVAC SHEET 99 OF 11 1 o
c
U>...
o C
B A
'(
IVXOISA,S!I SWITCHGEAR HEAT
~MOVAL COIL- ~INe:T 1<.- 2902 NON-SAFElY SAFETY RELArol IVXOIYA eFN IVX02YA NON -
SAFETY (SEE NOTE 21 IVX02 SA,S&
SWITGHGeAA HEAT 1Iat..10VA!.. COIL. c.M>INET 1<.-2902 13.770 en.*
IVX02.S'"
IV)(OIS6 7
24000 F ~
e IYXO!>CA,CIII IVX04CA,C!I 5WJ1i:,HGEAll HEAT f2.Et..10VAI,.. FAN K*2904 13770CF"M IYXO!>CA,C!I IllATTElty IWOM EXHAUST :l'JI<i'r-K-2904-IVXI2.CA.C6 SWITHGEAR HE-AT RE:MOVAL RETURN FANS IA ~ Ie
\\0\\-2.904 AUxiLIARY BLDG..
SWITCHGEAR ROOM IA I El. 781'- O' EAST
\\-
i;:
u
()
o 7:;OCF....
NON - SAFETy 10230 eFN AUXILIAKY SLOG.
SWITCHGEAR ROOM IA EL762'- O' EAST AUl<ILlARY BLOb.
SWITCHGEAR ROOM I B 1 EL 781'-0' WEST RELATED I SEE NOTE2 1 7S0 4
3 4350 AUXILIARY BLDG.
BATTERY ROOM IA I El. 781'*0* EAST AUXllIA.RY BLDG.
SA TTERY ROO" IB 1 El. 781cO* WEST 1.750 CFM REV. 2 NON - SAFETY RELATED I SEE NOTE 21 SEPT. 1990 4750 3 5 a CP'M OV.12'V o C~N NOTES:
--I. THE P 10. I DIG" I DIAGRAMS FOR THE C 1.1 FUNCTION SYMBOLS ARE SHa.vN ON ~AWING MIO*'1I15 UNLESS OTHERWISE ~OTED. SHEET NUMBER \\. DIAGRAM REFERENCE ARE SHOWN IN THE FUNCTDN SYMBOL.
2 NUCLEAR SAFETY-RELATED DUCTWORK SYSTEM IS SHOWN ()\\I THIS P " ' d.
THIS CLA SSIACATION APPLIES TO DUCTWORK AND DUCTWORK. ACCE SSORIES I EXCEPT DAMPERS)
FURNISHED, FABRICATED AND INSTALLED UNDER SPECIFICATION K-2910.
FOR SAFETY Cl..ASSIFlCATIQN OF DUCTYIOR K SUPPORTS. SEE SUPPORT ORA'{IINGS FOR SAFETY.a.ASSlFlCAl1ON OF EOUIPMENT, SEE EQUIPMENT LIST*
f'1::A SAFETY CLASSIFICATION Of PIPING, / VALVES SEE LINE IVALVE LIST.
FOR SAFETY CLASSIFICATION OF DAMPERS SEE APPROPRIATE DAMPER UST.
NUCLEAR SAFETY RELAtED ITEMS ARE SHO_ ON THIS DltAWING
( 001 $AfITT CLUSIfICA_ ** _
IGUIPMINT. YAlYi. 01 "~NT U$TS.)
o C
B FIGURE 3.6-1 DIVISIONAL SEPARATION AND HIGH-ENERGY P&ID'S-ESSENTIAL SWITCHGEAR HEAT REMOVAL
/
SHEET 100 OF 111