Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 03/31/2022 |
From: | Constellation Energy Generation |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML22111A226 | List:
|
References | |
RS-22-048 | |
Download: ML22111A195 (671) | |
Similar Documents at Clinton | |
---|---|
Category:Map
MONTHYEARML24285A1472024-10-24024 October 2024
[Table view]Ltr. to Geoffrey M. Standing Bear, Principal Chief, Osage Nation Re CPS Section 106 Consultation ML24285A1422024-10-24024 October 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1442024-10-24024 October 2024 Ltr. to Estavio Elizondo, Sr., Chairman, Kickapoo Traditional Tribe of Texas Re CPS Section 106 Consultation ML24285A1462024-10-24024 October 2024 Ltr. to Gena Kakkak, Chairwoman, Menominee Indian Tribe of Wisconsin Re CPS Section 106 Consultation ML24285A1482024-10-24024 October 2024 Ltr. to Joseph Rupnick, Chairman, Prairie Band Potawatomi Nation Re CPS Section 106 Consultation ML24285A1432024-10-21021 October 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1412024-10-21021 October 2024 Ltr. to Craig Harper, Chief, Peoria Tribe of Oklahoma Re CPS Section 106 Consultation ML24103A1002024-05-0101 May 2024 Enclosure 1- Area Map, 50 Mile Radius Clinton ML24103A1012024-05-0101 May 2024 Enclosure 2- CPS Ape ML24103A1022024-05-0101 May 2024 Enclosure 3- Area Map, 6 Mile Radius Clinton ML22111A1972022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 1 of 5 ML22111A1952022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Figures, Part 2 of 2 ML22111A1942022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Figures, Part 1 of 2 ML20105A2482020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 2, Figure 2.5-1, Part 2 of 2 ML20105A2472020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 2, Figure 2.1-2, Part 1 of 2 ML20105A2502020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.3-1, Part 1 of 5 ML20105A2512020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 2 of 5 ML20105A2522020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 3 of 5 ML20105A2532020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 4 of 5 ML0327306192003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.5-6 Through Chapter 3, Table 3.3-33 ML0327306152003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.1-3 Through 2.4-1 ML0327306162003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-2 Through 2.4-11 ML0327306182003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-20 Through 2.5-5 2024-05-01 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML24092A3452024-04-0101 April 2024
[Table view]Updated Safety Analysis Report (Usar), Revision 23 ML22216A2212022-05-19019 May 2022 2 to Updated Safety Analysis Report, Appendix E, Figures Part 1 of 2_Redacted ML22111A2152022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 17, Quality Assurance ML22111A2002022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 4 of 5 ML22111A1962022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22111A2162022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix a, Glossary ML22111A1922022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22111A2182022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix C, Computer Programs RS-22-048, 2 to Updated Safety Analysis Report, B 2.0 Safety Limits (Sls)2022-03-31031 March 2022 2 to Updated Safety Analysis Report, B 2.0 Safety Limits (Sls) ML22111A2142022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML22111A2082022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22111A2102022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 12, Radiation Protection ML22111A1912022-03-31031 March 2022 2 to Updated Safety Analysis Report, USAR Cover and List of Effective Pages (Loep) ML22111A1982022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures Part 2 of 5 ML22111A2022022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 4, Reactor ML22111A1942022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Figures, Part 1 of 2 ML22111A1952022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Figures, Part 2 of 2 ML22111A1932022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Site Characteristics ML22111A2072022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems ML22111A1992022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 3 of 5 ML22111A2222022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix E, Figures Part 2 of 2 ML22111A2052022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 7, Instrument and Control Systems ML22111A2122022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML22111A2172022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix B, Construction Material Standards and Quality Control Procedures ML22111A1972022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 1 of 5 ML22111A2032022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22111A2202022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix E, Fire Protection Evaluation Report ML22111A1902022-03-31031 March 2022 Submittal of Revision 22 to Updated Safety Analysis Report, Letter and Attachments A-F ML22111A2092022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22111A2062022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 8, Electric Power ML22111A2242022-03-31031 March 2022 2 to Updated Safety Analysis Report, Clinton Power Station Operational Requirements Manual (Orm) ML22111A2112022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML20105A2502020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.3-1, Part 1 of 5 ML20105A2672020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML20105A2712020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix C, Computer Programs ML20105A2732020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix E, Fire Protection Evaluation Report ML20105A2642020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML20105A2612020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML20105A2702020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix B, Construction Material Standards and Quality Control Procedures ML20105A2652020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML20105A2682020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 17, Quality Assurance ML20105A2592020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 8, Electric Power RS-20-028, 1 to Updated Safety Analysis Report, CPS Tsb2020-03-31031 March 2020 1 to Updated Safety Analysis Report, CPS Tsb ML20105A2492020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML20105A2752020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix E, Figures Part 2 of 2 ML20105A2512020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 2 of 5 ML20105A2522020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 3 of 5 ML20105A2532020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 4 of 5 ML20105A2692020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix a, Glossary ML20105A2622020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management 2024-04-01 |