ML22111A19831 March 20222 to Updated Safety Analysis Report, Chapter 3, Figures Part 2 of 5
ML22111A19931 March 20222 to Updated Safety Analysis Report, Chapter 3, Figures, Part 3 of 5
ML22111A20031 March 20222 to Updated Safety Analysis Report, Chapter 3, Figures, Part 4 of 5
ML22111A22231 March 20222 to Updated Safety Analysis Report, Appendix E, Figures Part 2 of 2
ML17354A20520 December 2017Revision 19 to Updated Safety Analysis Report, Chapter 3, Figure 3.6-1 Through Figure 3.11-16, Part 5 of 5 (Redacted)
ML16306A08131 October 2016Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 95 of 111 to 3.6-1, Sheet 100 of 111
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 43 of 111 to 3.6-1, Sheet 49 of 11131 October 2016Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 43 of 111 to 3.6-1, Sheet 49 of 111
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 50 of 111 to 3.6-1, Sheet 55 of 11131 October 2016Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 50 of 111 to 3.6-1, Sheet 55 of 111
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 56 of 111 to 3.6-1, Sheet 62 of 11131 October 2016Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 56 of 111 to 3.6-1, Sheet 62 of 111Hydrostatic
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 63 of 111 to 3.6-1, Sheet 69 of 11131 October 2016Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 63 of 111 to 3.6-1, Sheet 69 of 111
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 70 of 111 to 3.6-1, Sheet 82 of 11131 October 2016Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 70 of 111 to 3.6-1, Sheet 82 of 111
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 83 of 111 to 3.6-1, Sheet 94 of 11131 October 2016Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 83 of 111 to 3.6-1, Sheet 94 of 111
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 101 of 111 to 3.6-1, Sheet 111 of 11131 October 2016Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 101 of 111 to 3.6-1, Sheet 111 of 111
ML16306A07931 October 2016Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 70 of 111 to 3.6-1, Sheet 82 of 111
ML16305A31131 October 2016Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 43 of 111 to 3.6-1, Sheet 49 of 111
ML16306A07731 October 2016Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 56 of 111 to 3.6-1, Sheet 62 of 111Hydrostatic
ML16306A08331 October 2016Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 101 of 111 to 3.6-1, Sheet 111 of 111
ML16306A08031 October 2016Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 83 of 111 to 3.6-1, Sheet 94 of 111
ML16306A07831 October 2016Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 63 of 111 to 3.6-1, Sheet 69 of 111
RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 95 of 111 to 3.6-1, Sheet 100 of 11131 October 2016Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 95 of 111 to 3.6-1, Sheet 100 of 111
ML16305A31231 October 2016Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 50 of 111 to 3.6-1, Sheet 55 of 111
RS-13-157, Response to Request for Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)3 July 2013Response to Request for Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)Spent Fuel Pool Instrumentation
RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 4 - Table of Contents Through Figure 4.6-3010 January 2013Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 4 - Table of Contents Through Figure 4.6-30
ML13016A33210 January 2013Updated Safety Analysis Report, Revision 15, Chapter 4 - Table of Contents Through Figure 4.6-30
ML07093025931 January 2005Cps/Usar, Chapter 15, Accident Analyses, Revision 11Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Operator Manual Action
Abnormal operational transient
Scram Discharge Volume
Feedwater Controller Failure
Spiral reload
Earthquake
Fuel cladding
Power change
Flow Induced Vibration
ML07093036431 January 2005Cps/Usar, Appendix F, Fire Protection Safe Shutdown Analysis, Revision 11Hot Short
Safe Shutdown
Fire Barrier
Safe Shutdown Earthquake
Scram Discharge Volume
Fire Protection Program
ML07093036231 January 2005USAR, Figure 1 Through Figure 22
ML07093036131 January 2005Cps/Usar, Fire Protection Evaluation Report, Revision 11Safe Shutdown
Ultimate heat sink
Fire Barrier
Coatings
Emergency Lighting
Fire Protection Program
Fire Watch
Early Warning Fire Detection
Scaffolding
Backfit
ML07093036031 January 2005Cps/Usar, Appendix D, Requirements Resulting from TMI-2 Accident, Revision 11Reactor Vessel Water Level
Grab sample
Probabilistic Risk Assessment
Fuel cladding
ML07092020431 January 2005Cps/Usar, Chapter 4, Reactor, Revision 11Shutdown Margin
Anticipated operational occurrence
Hydrostatic
Nondestructive Examination
Finite Element Analysis
Scram Discharge Volume
MELLLA
Fuel cladding
Power change
Coast down
ML07092020631 January 2005Cps/Usar, Chapter 5, Reactor Coolant System and Connected System, Revision 11Reactor Vessel Water Level
Packing leak
Grab sample
Stroke time
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Abnormal operational transient
Earthquake
Power-Operated Valves
Fuel cladding
Liquid penetrant
Pressure boundary leak
Coast down
ML07093022531 January 2005Cps/Usar, Chapter 6, Engineered Safety Features, Revision 11Safe Shutdown
High winds
Reactor Vessel Water Level
Stroke time
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Emergency Lighting
Foreign Material Exclusion
Power-Operated Valves
Fuel cladding
Liquid penetrant
Scaffolding
ML07093022831 January 2005Cps/Usar, Chapter 7, Instrumentation and Control Systems, Revision 11
ML07093022931 January 2005Cps/Usar, Chapter 8, Electric Power, Revision 11Hot Short
Safe Shutdown
Fire Barrier
Slow transfer
Safe Shutdown Earthquake
Emergency Lighting
Scram Discharge Volume
ML07093023631 January 2005Cps/Usar, Chapter 10, Steam and Power Conversion System, Revision 11Safe Shutdown
Ultimate heat sink
Grab sample
Hydrostatic
Abnormal operational transient
Fast acting solenoid valve
ML07093024531 January 2005Cps/Usar, Chapter 12, Radiation Protection, Revision 11High Radiation Area
Grab sample
Locked High Radiation Area
Scram Discharge Volume
ML07093025331 January 2005Cps/Usar, Chapter 13, Conduct of Operations, Revision 11Safe Shutdown
Fitness for Duty
Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Process Control Program
Operability Determination
Earthquake
Fire Protection Program
Power change
ML07093025431 January 2005Cps/Usar, Chapter 14, Initial Test Program, Revision 11Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Stroke time
Hydrostatic
Emergency Lighting
Scram Discharge Volume
Power change
Flow Induced Vibration
ML07093035931 January 2005Cps/Usar, Appendix C, Computer Programs, Revision 11Finite Element Analysis
Earthquake
ML03273061925 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.5-6 Through Chapter 3, Table 3.3-33Safe Shutdown
Ultimate heat sink
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Earthquake
Deep Dose Equivalent
Fuel cladding
ML03273061825 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-20 Through 2.5-5
ML03273061725 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-12 Through 2.4-19Ultimate heat sink
ML03273061625 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-2 Through 2.4-11
ML03273061525 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.1-3 Through 2.4-1
ML03273061325 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Figures 2.1-20 Through Plate 1Safe Shutdown Earthquake
Probabilistic Risk Assessment
Earthquake
ML03273061025 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Attachment 1, Figures B-1-12 Through Figure B-2-2Earthquake
ML03272160425 September 2003Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.3-7 Through 2.3-15Ultimate heat sink