ML070930359
From kanterella
Jump to navigation
Jump to search
ML070930359 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 01/31/2005 |
From: | AmerGen Energy Co, Exelon Nuclear |
To: | Office of Nuclear Reactor Regulation |
References | |
Download: ML070930359 (225) | |
Similar Documents at Clinton | |
---|---|
Category:Drawing
MONTHYEARML22111A1982022-03-31031 March 2022
[Table view]2 to Updated Safety Analysis Report, Chapter 3, Figures Part 2 of 5 ML22111A1992022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 3 of 5 ML22111A2002022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 4 of 5 ML22111A2222022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix E, Figures Part 2 of 2 ML17354A2052017-12-20020 December 2017 Revision 19 to Updated Safety Analysis Report, Chapter 3, Figure 3.6-1 Through Figure 3.11-16, Part 5 of 5 (Redacted) ML16306A0812016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 95 of 111 to 3.6-1, Sheet 100 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 43 of 111 to 3.6-1, Sheet 49 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 43 of 111 to 3.6-1, Sheet 49 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 50 of 111 to 3.6-1, Sheet 55 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 50 of 111 to 3.6-1, Sheet 55 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 56 of 111 to 3.6-1, Sheet 62 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 56 of 111 to 3.6-1, Sheet 62 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 63 of 111 to 3.6-1, Sheet 69 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 63 of 111 to 3.6-1, Sheet 69 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 70 of 111 to 3.6-1, Sheet 82 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 70 of 111 to 3.6-1, Sheet 82 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 83 of 111 to 3.6-1, Sheet 94 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 83 of 111 to 3.6-1, Sheet 94 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 101 of 111 to 3.6-1, Sheet 111 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 101 of 111 to 3.6-1, Sheet 111 of 111 ML16306A0792016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 70 of 111 to 3.6-1, Sheet 82 of 111 ML16305A3112016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 43 of 111 to 3.6-1, Sheet 49 of 111 ML16306A0772016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 56 of 111 to 3.6-1, Sheet 62 of 111 ML16306A0832016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 101 of 111 to 3.6-1, Sheet 111 of 111 ML16306A0802016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 83 of 111 to 3.6-1, Sheet 94 of 111 ML16306A0782016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 63 of 111 to 3.6-1, Sheet 69 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 95 of 111 to 3.6-1, Sheet 100 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 95 of 111 to 3.6-1, Sheet 100 of 111 ML16305A3122016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 50 of 111 to 3.6-1, Sheet 55 of 111 RS-13-157, Response to Request for Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)2013-07-0303 July 2013 Response to Request for Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 4 - Table of Contents Through Figure 4.6-302013-01-10010 January 2013 Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 4 - Table of Contents Through Figure 4.6-30 ML13016A3322013-01-10010 January 2013 Updated Safety Analysis Report, Revision 15, Chapter 4 - Table of Contents Through Figure 4.6-30 ML0709302592005-01-31031 January 2005 Cps/Usar, Chapter 15, Accident Analyses, Revision 11 ML0709303642005-01-31031 January 2005 Cps/Usar, Appendix F, Fire Protection Safe Shutdown Analysis, Revision 11 ML0709303622005-01-31031 January 2005 USAR, Figure 1 Through Figure 22 ML0709303612005-01-31031 January 2005 Cps/Usar, Fire Protection Evaluation Report, Revision 11 ML0709303602005-01-31031 January 2005 Cps/Usar, Appendix D, Requirements Resulting from TMI-2 Accident, Revision 11 ML0709202042005-01-31031 January 2005 Cps/Usar, Chapter 4, Reactor, Revision 11 ML0709202062005-01-31031 January 2005 Cps/Usar, Chapter 5, Reactor Coolant System and Connected System, Revision 11 ML0709302252005-01-31031 January 2005 Cps/Usar, Chapter 6, Engineered Safety Features, Revision 11 ML0709302282005-01-31031 January 2005 Cps/Usar, Chapter 7, Instrumentation and Control Systems, Revision 11 ML0709302292005-01-31031 January 2005 Cps/Usar, Chapter 8, Electric Power, Revision 11 ML0709302362005-01-31031 January 2005 Cps/Usar, Chapter 10, Steam and Power Conversion System, Revision 11 ML0709302452005-01-31031 January 2005 Cps/Usar, Chapter 12, Radiation Protection, Revision 11 ML0709302532005-01-31031 January 2005 Cps/Usar, Chapter 13, Conduct of Operations, Revision 11 ML0709302542005-01-31031 January 2005 Cps/Usar, Chapter 14, Initial Test Program, Revision 11 ML0709303592005-01-31031 January 2005 Cps/Usar, Appendix C, Computer Programs, Revision 11 ML0327306192003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.5-6 Through Chapter 3, Table 3.3-33 ML0327306182003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-20 Through 2.5-5 ML0327306172003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-12 Through 2.4-19 ML0327306162003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-2 Through 2.4-11 ML0327306152003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.1-3 Through 2.4-1 ML0327306132003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Figures 2.1-20 Through Plate 1 ML0327306102003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Attachment 1, Figures B-1-12 Through Figure B-2-2 ML0327216042003-09-25025 September 2003 Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.3-7 Through 2.3-15 2022-03-31 Category:Graphics incl Charts and Tables MONTHYEARML16056A1392016-03-11011 March 2016
[Table view]Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees Decommissioning Funding Status Reports ML15219A6452015-09-0303 September 2015 Tables 1 and 2 ML15212A0102015-09-0303 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation RA-13-081, Proposed Resolution for Completion of the Seismic Walkdowns Associated with NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term2013-09-16016 September 2013 Proposed Resolution for Completion of the Seismic Walkdowns Associated with NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term RA-13-075, Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites2013-09-12012 September 2013 Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites NEI 08-09, Re-Submittal of the Exelon Cyber Security Plan2010-07-23023 July 2010 Re-Submittal of the Exelon Cyber Security Plan RS-08-141, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2008-10-31031 October 2008 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors RA-08-057, Unit 1, Application for Approval of License Transfers2008-06-20020 June 2008 Unit 1, Application for Approval of License Transfers ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0617102122006-06-15015 June 2006 Oak Ridge Institute for Science and Education - Analytical Results for 21 Water Samples, Batch One, from the Vicinity of the Clinton Station, Clinton, Illinois (Inspection Report No. 050-00461/2006-004) (Rfta No. 06-001) ML0709202062005-01-31031 January 2005 Cps/Usar, Chapter 5, Reactor Coolant System and Connected System, Revision 11 ML0709302252005-01-31031 January 2005 Cps/Usar, Chapter 6, Engineered Safety Features, Revision 11 ML0709302282005-01-31031 January 2005 Cps/Usar, Chapter 7, Instrumentation and Control Systems, Revision 11 ML0709302362005-01-31031 January 2005 Cps/Usar, Chapter 10, Steam and Power Conversion System, Revision 11 ML0709302402005-01-31031 January 2005 Cps/Usar, Chapter 11, Radioactive Waste Management, Revision 11 ML0709302452005-01-31031 January 2005 Cps/Usar, Chapter 12, Radiation Protection, Revision 11 ML0709302542005-01-31031 January 2005 Cps/Usar, Chapter 14, Initial Test Program, Revision 11 ML0709302592005-01-31031 January 2005 Cps/Usar, Chapter 15, Accident Analyses, Revision 11 ML0709303592005-01-31031 January 2005 Cps/Usar, Appendix C, Computer Programs, Revision 11 ML0709303602005-01-31031 January 2005 Cps/Usar, Appendix D, Requirements Resulting from TMI-2 Accident, Revision 11 2016-03-11 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML24092A3452024-04-0101 April 2024
[Table view]Updated Safety Analysis Report (Usar), Revision 23 ML22216A2212022-05-19019 May 2022 2 to Updated Safety Analysis Report, Appendix E, Figures Part 1 of 2_Redacted RS-22-048, 2 to Updated Safety Analysis Report, B 2.0 Safety Limits (Sls)2022-03-31031 March 2022 2 to Updated Safety Analysis Report, B 2.0 Safety Limits (Sls) ML22111A1952022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Figures, Part 2 of 2 ML22111A2152022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 17, Quality Assurance ML22111A1912022-03-31031 March 2022 2 to Updated Safety Analysis Report, USAR Cover and List of Effective Pages (Loep) ML22111A2172022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix B, Construction Material Standards and Quality Control Procedures ML22111A2242022-03-31031 March 2022 2 to Updated Safety Analysis Report, Clinton Power Station Operational Requirements Manual (Orm) ML22111A2122022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML22111A2072022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems ML22111A2092022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22111A2142022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML22111A1902022-03-31031 March 2022 Submittal of Revision 22 to Updated Safety Analysis Report, Letter and Attachments A-F ML22111A1972022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 1 of 5 ML22111A2002022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 4 of 5 ML22111A1932022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Site Characteristics ML22111A1942022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Figures, Part 1 of 2 ML22111A1922022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22111A2062022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 8, Electric Power ML22111A2022022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 4, Reactor ML22111A2202022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix E, Fire Protection Evaluation Report ML22111A2032022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22111A2112022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML22111A2162022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix a, Glossary ML22111A1982022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures Part 2 of 5 ML22111A1992022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 3 of 5 ML22111A2182022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix C, Computer Programs ML22111A2082022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22111A2102022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 12, Radiation Protection ML22111A1962022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22111A2052022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 7, Instrument and Control Systems ML22111A2222022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix E, Figures Part 2 of 2 ML20105A2622020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management ML20105A2592020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 8, Electric Power ML20105A2702020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix B, Construction Material Standards and Quality Control Procedures ML20105A2712020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix C, Computer Programs ML20105A2632020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 12, Radiation Protection ML20105A2652020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML20105A2602020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems ML20105A2642020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML20105A2672020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML20105A2692020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix a, Glossary ML20105A2772020-03-31031 March 2020 1 to Updated Safety Analysis Report, CPS Operational Requirements ML20105A2682020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 17, Quality Assurance ML20105A2502020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.3-1, Part 1 of 5 ML20105A2512020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 2 of 5 ML20105A2522020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 3 of 5 ML20105A2612020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML20105A2532020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 4 of 5 ML20105A2752020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix E, Figures Part 2 of 2 2024-04-01 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML070930359&oldid=5349004"