ML15141A185

From kanterella
Revision as of 20:25, 21 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Grand Gulf Nuclear Station, Unit 1 - Request for Withholding Information from Public Disclosure (TAC No. MF5303)
ML15141A185
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/15/2015
From: Wang A B
Plant Licensing Branch IV
To:
Entergy Operations
Wang A B
References
TAC MF5303
Download: ML15141A185 (3)


Text

Vice President, Operations Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 15, 2015 SUBJECT: GRAND GULF NUCLEAR STATION, UNIT 1 -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MF5303) Dear Sir or Madam: By letter dated May 8, 2015, Entergy Operations, Inc. (Entergy, the licensee) submitted an affidavit dated April 27, 2015, executed by Lisa K. Schichlein, GE-Hitachi Nuclear Energy Americas LLC (GEH), requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: Attachment 2 to GNR0-2015/00031, "Response to Request for Additional Information RAl-3, Proprietary Information" A publicly available version of Attachment 2, designated as Attachment 3 to the letter dated May 8, 2015, is in the Agencywide Documents Access and Management System (Accession No. ML 15128A552). The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies. b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, Attachment 2 to GNR0-2015/00031, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

-2 -Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. If you have any questions, please contact me at 301-415-1445 or via e-mail at Alan.Wang@nrc.gov. Docket No. 50-416 cc: Lisa K. Schichlein Sincerely, Alan B. Wang, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Senior Project Manager, NPP/Services Licensing Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd. Wilmington, NC 28401 Additional Distribution via Listserv

-2 -Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRG). You also should understand that the NRG may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRG makes a determination adverse to the above, you will be notified in advance of any public disclosure. If you have any questions, please contact me at 301-415-1445 or via e-mail at Alan.Wang@nrc.gov. Docket No. 50-416 cc: Lisa K. Schichlein Sincerely, IRA/ Alan B. Wang, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Senior Project Manager, NPP/Services Licensing Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Rd. Wilmington, NC 28401 Additional Distribution via Listserv DISTRIBUTION: PUBLIC LPLIV r/f RidsAcrsAcnw _MailCTR Resource RidsNrrPMGrandGulf Resource RidsNrrDssSrxb Resource RidsNrrLAPBlechman Resource RidsOgcmailCenter Resource RidsNrrDorllpl4-2 Resource RidsRgn4MailCenter Resource ADAMS Accession No. ML 15141A185 OFFICE NRR/LPL4-2/PM N RR/LPL4-2/LA NRR/DSS/SXRB/BC NRR/LPL4-2/BC NRR/LPL4-2/PM NAME AWang PBlechman CJackson MKhanna AWang DATE 6/2/15 5/26/15 7/9/15 7/13/15 7/15/15 //OFFICIAL RECORD COPY