| | | Reporting criterion |
|---|
| 05000220/LER-1978-001, Submittal of Licensee Event Report LER 78-01 Concerning Delta Temperature of the Discharge Water Exceeded Environmental Tech. Spec | Submittal of Licensee Event Report LER 78-01 Concerning Delta Temperature of the Discharge Water Exceeded Environmental Tech. Spec | |
| 05000220/LER-1978-003, Regarding Drywell High Pressure Switch RE04A Setpoint Drift and LER 78-003-00 | Regarding Drywell High Pressure Switch RE04A Setpoint Drift and LER 78-003-00 | |
| 05000220/LER-1978-005, And LER 78-005-00 for Nine Mile Point, Unit 1 Re During Unit Shutdown, Reserve Power Breaker on Power Board II Failed to Close in After Loss of Normal Power and During Plant Outage While Marking Up Outside MSIV 01-03 Discovered | And LER 78-005-00 for Nine Mile Point, Unit 1 Re During Unit Shutdown, Reserve Power Breaker on Power Board II Failed to Close in After Loss of Normal Power and During Plant Outage While Marking Up Outside MSIV 01-03 Discovered That Valve | |
| 05000220/LER-1978-006, Re During Steady State Operation, Performance of Surveillance Test IC-75 Found a Trip Setpoint of 22.5 Inches Water on One Vacuum Switch in the Vacuum Relief System from the Pressure Suppression Chamber to the | Re During Steady State Operation, Performance of Surveillance Test IC-75 Found a Trip Setpoint of 22.5 Inches Water on One Vacuum Switch in the Vacuum Relief System from the Pressure Suppression Chamber to the | |
| 05000220/LER-1978-009-01, For Nine Mile Point Unit 1 Regarding Replacement of Explosive Charges in the TIP Shear Valves with New Charges and the Resulting Unsatisfactory Ohmmeter Continuity Test for Acceptable Electric Contact | For Nine Mile Point Unit 1 Regarding Replacement of Explosive Charges in the TIP Shear Valves with New Charges and the Resulting Unsatisfactory Ohmmeter Continuity Test for Acceptable Electric Contact | |
| 05000220/LER-1978-009, And LER 78-010-00 for Nine Mile Point, Unit 1 Re Technical Specification Violations of Listed Sections | LER 78-009-00 and LER 78-010-00 for Nine Mile Point, Unit 1 Re Technical Specification Violations of Listed Sections | |
| 05000220/LER-1978-013, And LER 78-013-00 for Nine Mile Point, Unit 1 Re Technical Specification Violations of Section 3.6.2 | And LER 78-013-00 for Nine Mile Point, Unit 1 Re Technical Specification Violations of Section 3.6.2 | |
| 05000220/LER-1978-014, LERs 78-014,00, 78-016-00, and 78-016-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery That the Fuel Transfer Pump on 102 D/G Would Not Fill the Day Tank, Discovery of RE18C with a Setpoint of 129 Inches Wc, and | LERs 78-014,00, 78-016-00, and 78-016-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery That the Fuel Transfer Pump on 102 D/G Would Not Fill the Day Tank, Discovery of RE18C with a Setpoint of 129 Inches Wc, and RE04B | |
| 05000220/LER-1978-015, And LER 78-015-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery That the Fuel Transfer Pump in 102 D/G Would Not Fill the Day Tank and Discovery That 12 Control Room Air Treatment Fan Would Not Run | And LER 78-015-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery That the Fuel Transfer Pump in 102 D/G Would Not Fill the Day Tank and Discovery That 12 Control Room Air Treatment Fan Would Not Run | |
| 05000220/LER-1978-018, For Nine Mile Point Unit 1 Regarding Discovery of Main Steam High Flow Switch with a Setpoint of 106.2 PSI, Which Is Above the Technical Specification | For Nine Mile Point Unit 1 Regarding Discovery of Main Steam High Flow Switch with a Setpoint of 106.2 PSI, Which Is Above the Technical Specification | |
| 05000220/LER-1978-019, For Nine Mile Point Unit 1 Regarding Discovery That Hydraulic Snubber 31-HS-1 Had Failed and Was Empty of Hydraulic Fluid and Disconnected from Its Anchor at the Feedwater Pipe | For Nine Mile Point Unit 1 Regarding Discovery That Hydraulic Snubber 31-HS-1 Had Failed and Was Empty of Hydraulic Fluid and Disconnected from Its Anchor at the Feedwater Pipe | |
| 05000220/LER-1978-020, LERs 78-020-00, 78-021-00, 78-022-00, and 78-023-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery of RE18A with a Setpoint of 135 Inches Wc, Discovery of RE04A and RE04B with a Setpoint of 3.65 PSIG, Discovery o | LERs 78-020-00, 78-021-00, 78-022-00, and 78-023-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery of RE18A with a Setpoint of 135 Inches Wc, Discovery of RE04A and RE04B with a Setpoint of 3.65 PSIG, Discovery of Turbine . | |
| 05000220/LER-1978-024, For Nine Mile Point Unit 1 Regarding Discovery That Test N1-St-Q2,4,5,7,8,9, and 10 Had Not Been Performed During a Review of Quarterly Surveillance Test Results | For Nine Mile Point Unit 1 Regarding Discovery That Test N1-St-Q2,4,5,7,8,9, and 10 Had Not Been Performed During a Review of Quarterly Surveillance Test Results | |
| 05000220/LER-1978-025, LERs 78-025-00, 78-026-00, and 78-027-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery of RE04D with a Setpoint of 3.70 PSIG, Discovery of Numerous Small Leaks in Small Sample and Instrument Pipes, and Discovery | LERs 78-025-00, 78-026-00, and 78-027-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery of RE04D with a Setpoint of 3.70 PSIG, Discovery of Numerous Small Leaks in Small Sample and Instrument Pipes, and Discovery of RE22D Wit | |
| 05000220/LER-1978-028, For Nine Mile Point Unit 1 Regarding Discovery of the Allowable Test Interval of TS 4.1.4c for the Core Spray Power-Operated Valves Had Been Exceeded | For Nine Mile Point Unit 1 Regarding Discovery of the Allowable Test Interval of TS 4.1.4c for the Core Spray Power-Operated Valves Had Been Exceeded | |
| 05000220/LER-1978-029, Regarding Discovery of High Drywell Pressure Switches RE04A, RE04B, and RE04C with Setpoints Less Conservative than the Technical Specifications | Regarding Discovery of High Drywell Pressure Switches RE04A, RE04B, and RE04C with Setpoints Less Conservative than the Technical Specifications | |
| 05000220/LER-1978-030, 78-031-00, and 78-032-00 for Nine Mile Point Unit 1 Regarding, Respectively, Unavailability of Feedwater Pump 29-03 While Its Pump Seals Were Replaced, Unavailability of Liquid Poison Pump NP02A While a Frozen Valve | 78-031-00, and 78-032-00 for Nine Mile Point Unit 1 Regarding, Respectively, Unavailability of Feedwater Pump 29-03 While Its Pump Seals Were Replaced, Unavailability of Liquid Poison Pump NP02A While a Frozen Valve | |
| 05000220/LER-1978-033-03, /03L-0 on 780916:Surveillance Tests on Barton Model 289 Pressure Indicating Switches Showed Changes in Setpoints Due to Instru Drift.Rev Surveillance Test Scheds Now Adequate to Ensure Early Detection of Drifts | /03L-0 on 780916:Surveillance Tests on Barton Model 289 Pressure Indicating Switches Showed Changes in Setpoints Due to Instru Drift.Rev Surveillance Test Scheds Now Adequate to Ensure Early Detection of Drifts | |
| 05000220/LER-1978-034, Regarding an Environmental Contractor Obtaining 22 Hourly Fish Impingement Samples, and One Two-Hour Sample, Which Is Contrary to the Technical Specification Requiring 24 Hourly Samples | Regarding an Environmental Contractor Obtaining 22 Hourly Fish Impingement Samples, and One Two-Hour Sample, Which Is Contrary to the Technical Specification Requiring 24 Hourly Samples | |
| 05000220/LER-1978-035, Forwards LER 78-035/01T-0 | Forwards LER 78-035/01T-0 | |
| 05000220/LER-1978-035-01, /01T-0 on 781020:all Main Steam High Flow Pressure Indicating Instr Were Found W/Setpoints Less than Tech Specs.Heise 0-200 PSIG Test Gauge Calibrated & Used in Test Had Loose Screw & Was Recalibrated | /01T-0 on 781020:all Main Steam High Flow Pressure Indicating Instr Were Found W/Setpoints Less than Tech Specs.Heise 0-200 PSIG Test Gauge Calibrated & Used in Test Had Loose Screw & Was Recalibrated | |
| 05000220/LER-1978-036-04, /04T-0 on 781025:improper Appl of Brook Model 9456 Oval Gear Flowmeter Combined W/Failed Seal on Caustic Addition Pump Caused High Concentration of Sodium & Sulfate & Degraded Capability to Control Rate of Discharge | /04T-0 on 781025:improper Appl of Brook Model 9456 Oval Gear Flowmeter Combined W/Failed Seal on Caustic Addition Pump Caused High Concentration of Sodium & Sulfate & Degraded Capability to Control Rate of Discharge | |
| 05000220/LER-1978-036, Forwards LER 78-036/04T-0 | Forwards LER 78-036/04T-0 | |
| 05000220/LER-1978-037, Forwards LER 78-037/03L-0, 78-038/03L-0 & 78-039/03L-0 | Forwards LER 78-037/03L-0, 78-038/03L-0 & 78-039/03L-0 | |
| 05000220/LER-1978-037-03, /03L-0 on 781027:test Revealed Trip Setpoint of 26.5 Inches Water on One Vacuum Switch in Vacuum Relief Sys from Pressure Supression Chamber to Rx Bldg.Caused by Instru Drift in a Mercoid Model CP4122 Vacuum Switch | /03L-0 on 781027:test Revealed Trip Setpoint of 26.5 Inches Water on One Vacuum Switch in Vacuum Relief Sys from Pressure Supression Chamber to Rx Bldg.Caused by Instru Drift in a Mercoid Model CP4122 Vacuum Switch | |
| 05000220/LER-1978-038-03, /03L-0 on 781025:review of N1-ISP-RE22 Test Results Found 12 Instances Where Procedure Was Violated. Caused by Carelessness in Procedure Implementation. Re-instruction & Closer Supervision Instituted | /03L-0 on 781025:review of N1-ISP-RE22 Test Results Found 12 Instances Where Procedure Was Violated. Caused by Carelessness in Procedure Implementation. Re-instruction & Closer Supervision Instituted | |
| 05000220/LER-1978-039-03, /03L-0 on 781103:surveillance Test N1-ISP-RE02 Revealed Rx Lo-Lo Water Level Switch W/Trip Setpoint of +2 Inches Water.Caused by Instru Drift.Setpoint Reset | /03L-0 on 781103:surveillance Test N1-ISP-RE02 Revealed Rx Lo-Lo Water Level Switch W/Trip Setpoint of +2 Inches Water.Caused by Instru Drift.Setpoint Reset | |
| 05000220/LER-1978-040-03, /03L-0 on 781113: 112 Core Spray Topping Pump Motor Breaker Closed Starting Pump But Breaker Closing Spring Motor Was Running Continuously & Not Charging Closing Spring.Caused by Misaligned Motor Assembly at Latching Pawl | /03L-0 on 781113: 112 Core Spray Topping Pump Motor Breaker Closed Starting Pump But Breaker Closing Spring Motor Was Running Continuously & Not Charging Closing Spring.Caused by Misaligned Motor Assembly at Latching Pawl | |
| 05000220/LER-1978-040, Forwards LER 78-040/03L-0 | Forwards LER 78-040/03L-0 | |
| 05000220/LER-1978-041, Forwards LER 78-041/04T-0 | Forwards LER 78-041/04T-0 | |
| 05000220/LER-1978-041-04, /04T-0 on 781220:during Impingement Sampling Only 23 Samples (22 Hourly Samples & One 2-hr Sample) Were Collected Instead of 24 Required Samples,Caused by one-time Personnel Scheduling Change | /04T-0 on 781220:during Impingement Sampling Only 23 Samples (22 Hourly Samples & One 2-hr Sample) Were Collected Instead of 24 Required Samples,Caused by one-time Personnel Scheduling Change | |