LER-1978-001, Submittal of Licensee Event Report LER 78-01 Concerning Delta Temperature of the Discharge Water Exceeded Environmental Tech. Spec |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2201978001R00 - NRC Website |
|
text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS>
DISTRIBUTION FOR INCOMING MATERIAL 50-220 REC:
GRIER B H NRC ORG:
LEMPGES T E NlAGARA MOHAWK PWR DOCDATE: Oi/i3/78.
DATE RCVD: 04/i4/78 DOCTYPE:
LETTER NOTARIZED:
NO COPIES RECEIVED
SUBJECT:
LTR i ENCI i FORWARDING I ICENSE - EVENT REPT (RO 50-220/78-00i ON oi/04/78 CONCERNING DELTA TEMPERATURE OF THE DISCHARGE WATER EXCEEDED ENVIRON TECH SPEC
- 2. i. 5 DUE TQ
- - AILURE OF GATE C CIRCULATING WATER DISCHARGE GATE TO DISHCARGE TUNNEL TO CLOSE PROPERLY... W/ATT.
PLANT NAME: NINE MILE PT UNIT LER (BACKFIT)
(DISTRIBUTION CODE M007>
REVIEWER INITIAL:
XJM DISTRIBUTOR INITIAL:
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS
.,1NTERNAL:
EXTERNAL:
G FIL ~~~~W/ENCL 1
E~A~W/2 ENCL LPDR S
OSWEGO'Y++W/ENCL THM>c>W/ENCI c-z Z C'H4~E ~
ACRS CAT 8~HIW/0 ENCL NRC PDR~~~W/ENCL DISTRIBUTION:
LTR 6 SIZE: iP+iP+2P ENCL 6 CONTROL NBR:
782i900ii 8l 5%%%8l +sl+%%%%%%%%%%%%%%%%0I%%4HI 4%4%%
THE END
%%%%%%%4 %%%%%p x%%%%%%%%%%%%%%%%%%%%
g II I
I
~
ll 4
~
I
! q
<CCugTX,,-
MYNIAGARA I
ClXt'FiLECOPY M
WP-0109 NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVARDWEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 Janua/Icj 19, 1978 Boyce H.
G/Ii,e/L Oi/I,ecto/L United State5 Nuefea/i, Reg~/Ly CommQ a~on Region I 691 Pa/cia Avenue, Kmg otI Pruwm, PA.
19406
~lb RE:
Sock& No.
50-220 Sea/L A,. Gru.e/L:
In accotutance ~ Nne NLe Po~ NucZea/L S~n (tnLt Techni.cat! Speci,t'Iicatione, RIe he/teby aubmbt Licensee Event Repo/Lt LiER 78-01, I0tu.ch m in van o$ Se~n 2.1.5 o$ We Envmonm~ Tech'.cat' pe@i.pcatLoru.
TRQ
/1.epo/ct Nas complied in She
$o/Imat de5~gnatedkn NUREG-Olbl, dated July 1977.
Vefcy ~IJ you/L5,
,gg,',..:
. ('.-t.7,,"
Thomas E.
Lempge5 GenecaL Supe/cintendent-Nu&ea/L Gene/ut,Cion
)o/L R.R. Schneute/L Vi.ce P/I.mkde<-
Hect/Iic P/I.oduction C
C rl C
C~if'I ~
W C9 gt)
C=M MC I
Attachments (2 eneLoau/I.e5) xc:
Mcmto/L, 0(glace of NRR (17 copie5) 7s2>s'ooq~
gl
s U. S. NUCLEAR REGULATORY COMMISSION LICENSE E EV EN T R EPOR Qi
{PLEASE PRINT OR TYPE ALLREOUIRED INFORMATION) 6 0
0 0
0 Qs4 1
1 1
1 Qs~Qs 25 26 LICENSE TYPE 30 57 CAT 58 LICENSE NUMBER NRC FORM 366 (g 77) <<
IQ I
CONTROL BLOCK:
I
~oi N
Y N
N P
1 Q2 0
0 7
8 9
LICENSEE CODE 14 is CON'T
~01 QB 0
5 0
0 0
2 2
0 07 0
1 0
4 7
8 6
0 1
1 3
7 8 0 7
8 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75
'REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Q10
~02 Durin reverse flow operations, del ta temperature of the discharge
~03 water exceeded speci ficati on 2. 1. 5 of the Envi ronmenta1 Techni ca 1 Specifications.
The allowed 50 degrees F,delta temperature was 6
exceeded by values of 0.5 to 2s6 degrees F
during the period two
~DB through six hours after reversal.
This condition resulted in minimal
~o7 safety implications.
~OB 7
8 9
80
~OS 7
8
\\
SYSTEM
CAUSE
CAUSE COMP.
VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE
~HF Qil ~E
~X X
X X
X X
X 8 L~JQ>s
~E Qss 9
10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LF RIRO EVENT YEAR REPORT NO.
CODE TYPE N
Qs sssoss
~78 Q
~00 I
Q>
~04 QT 21 22 23 24 26 27 28 29 30 31 32 ACTION.FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDR PRIME COMP.
COMPONENT TAKEN ACTION ON PLANT METHOD HOURS +22 SUBMITTED FORM SUB.
SUPPLIER MANUFACTURER
~OIB ~OIB
~020
'~ZQ>>
0
+
QJ 023
~t" 02
~026 X
g g
g 026 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 027 O
C the circulatin water dischar e
ate to the dischar e tunnel il d o close corn letel
. This ermitted warm dischar e water to mix 3
with the inlet water raisin the tern erature of the inlet water.
Gate C will be investi ated durin the next refuelin outa e to 4
determine wh it han s
u 7
8 9
FACILITY STATUS 5 POWER OTHER STATUS QSO E
Q>>
Loas6JQ>>
NA 7
8 9
10 12 13 44 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNTOF ACTIVITYQ 6
~Z 033
~ZQ34 NA 7
8 9
10 11 44 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q39
~l7
~<0 0 Qss Z
Qss sA 7
8 9
11 12 13 PERSONNEL INJURIES METHOD OF DISCOVERY
~AQ31 45 46 45 DISCOVERY DESCRIPTION Q32 Reverse Flow Operations LOCATIONOF RELEASE Q 80 80 80 80 7
8 8
9 11 12 LOSS OF OR DAMAGETO FACILITYQ43 TYPE
DESCRIPTION
Z Q42 NA 9
10 PUBLICITY ISSUED DESCRIPTION ~46 unO4" NA 9
10 NAME oF PREPARER D. K. tlacVitt'8 69 NRC USE ONLY 80 80 ss s
80 o
~ >j 7'IAGARA U MOHAWK
~ )
NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVARDWEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 3'amuuty 13, 1978 A,. Boyce H.
Gtu.e/L
'Pi/Le&o/L UnLted Statee NucLeut, ReguLato/I.y CommQhion Region I 631 Pmk Avenue King o) PtuL5h~,
PA.
19406 RE:
gocket No. 50-220 LER 78-01/04 T-0 Nine ILiLe Point NucLeuL S~n Ueif: <1 OeatL ~. G/Iie/L:
Section 2.1.5 of Che Env~onm~ TechnicaL Specipcatioru
/I.equi/I.u
~ We t Tempemtu/1e of ou/L di5chatIge wate/L Co Che Lake. noC exceed 50 F
Wo hocus a$Can. gow />eve/uaL and Che/Lea(ke/c.
Con~y Co ~,
on Janus/Ly 4, 1978, We 50 F /tT wa5 exceeded by vaLues o( 0.5oF Co 2.6 F
durung We pened Wo Ch/Lough six hou/L5 a)ke/L (Low /Ieve/L5aL.
On Jmuuvcy 3, 1978 at 2305 bouts, Che gow o( Che circcuLating wat wae /Leve/ued Co co/I/sect icing in We ~ke ~neL.
Opercatcng P/LocedIdte, Nl-OP-19, Ci/IcuLMing olate/L Sgfem, wa5 used (o/L CRQ opeJMian and (oLLowed without excep~n.
Howeve/L, Gate "C", We ci/LcuLating wate/L dQduI/Lge gat'e, Co Che di5charcge
~neL, (cuLed W cLoae compLeteLy.
TRQ gate,L s no/ImaLLy open, smpended ove/L We dieduucge ~neL.
The, d/u,vying fo/Lce
$o/L 0Loaing Che gate. i5 aoLeLy the weight o( the gate,.
High )Low (o/Lcing We gate again54 M'a guideL5 a pomibLe c~e o( Chi5
$~e:
A5 a, /Le5uLt o) Chih (aiLu/Le Co cLoae compLeteLy, arne% amounts o$ mvIm dQ cd/Ige wate/L we/I.e +Mowed Co mix with We coLd ~ke wate/L /Iai5ing We Cempe/~e o) We wate/L at the ~et to We conduce/L.
TkQ, in ~n, wa5 heated in We condense/t.
and cKscho/aged W We Lake at a g/Leat4, LT
~ aLLowed.
The (oLLoeing a T'6 we/ce /Leco/Lded:
~
~
40
~
~
"LER 78-01/04 T-0 0)
T7h)E LAKE T (oF) 87SCHARGE T (oF) 'T (oF) 2900 2400 0100 0200 0900 0400 0500 32 92 32 92 92 92 92 97.0 90.0 82.8 82.5
- 89. 9
- 83. 8 84.6 65 58 50.8'0. 5>>
- 51. 9"
- 51. 8" 52.6" V~~n o g E.T.S.
- 2. 1. 5 FLoN cvae atoned Co nominal at 0525 ho~,
on Jan~a 4,
1978.
TM Lncident m cowMned Co have muumuu knpact due, to Ae dhoM
~e o$ du~on and We xmas hT'a above, speci Pcationj.
The )~e o$
gate "C" Co cLoae completely vial be LnvebWgated dutung Ae net Ae(using 0Ltag e.
~cMeZy, u'homas E.
Lempgee General Superuntendent Nu&euc Gen~mn Joe R.R. Schneide/c Vace Prcu&ent-ELe~c Pcodu~on
el
~
~
~
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000220/LER-1978-001, Submittal of Licensee Event Report LER 78-01 Concerning Delta Temperature of the Discharge Water Exceeded Environmental Tech. Spec | Submittal of Licensee Event Report LER 78-01 Concerning Delta Temperature of the Discharge Water Exceeded Environmental Tech. Spec | | | 05000220/LER-1978-003, Regarding Drywell High Pressure Switch RE04A Setpoint Drift and LER 78-003-00 | Regarding Drywell High Pressure Switch RE04A Setpoint Drift and LER 78-003-00 | | | 05000220/LER-1978-005, And LER 78-005-00 for Nine Mile Point, Unit 1 Re During Unit Shutdown, Reserve Power Breaker on Power Board II Failed to Close in After Loss of Normal Power and During Plant Outage While Marking Up Outside MSIV 01-03 Discovered | And LER 78-005-00 for Nine Mile Point, Unit 1 Re During Unit Shutdown, Reserve Power Breaker on Power Board II Failed to Close in After Loss of Normal Power and During Plant Outage While Marking Up Outside MSIV 01-03 Discovered That Valve | | | 05000220/LER-1978-006, Re During Steady State Operation, Performance of Surveillance Test IC-75 Found a Trip Setpoint of 22.5 Inches Water on One Vacuum Switch in the Vacuum Relief System from the Pressure Suppression Chamber to the | Re During Steady State Operation, Performance of Surveillance Test IC-75 Found a Trip Setpoint of 22.5 Inches Water on One Vacuum Switch in the Vacuum Relief System from the Pressure Suppression Chamber to the | | | 05000220/LER-1978-009-01, For Nine Mile Point Unit 1 Regarding Replacement of Explosive Charges in the TIP Shear Valves with New Charges and the Resulting Unsatisfactory Ohmmeter Continuity Test for Acceptable Electric Contact | For Nine Mile Point Unit 1 Regarding Replacement of Explosive Charges in the TIP Shear Valves with New Charges and the Resulting Unsatisfactory Ohmmeter Continuity Test for Acceptable Electric Contact | | | 05000220/LER-1978-009, And LER 78-010-00 for Nine Mile Point, Unit 1 Re Technical Specification Violations of Listed Sections | LER 78-009-00 and LER 78-010-00 for Nine Mile Point, Unit 1 Re Technical Specification Violations of Listed Sections | | | 05000220/LER-1978-013, And LER 78-013-00 for Nine Mile Point, Unit 1 Re Technical Specification Violations of Section 3.6.2 | And LER 78-013-00 for Nine Mile Point, Unit 1 Re Technical Specification Violations of Section 3.6.2 | | | 05000220/LER-1978-014, LERs 78-014,00, 78-016-00, and 78-016-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery That the Fuel Transfer Pump on 102 D/G Would Not Fill the Day Tank, Discovery of RE18C with a Setpoint of 129 Inches Wc, and | LERs 78-014,00, 78-016-00, and 78-016-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery That the Fuel Transfer Pump on 102 D/G Would Not Fill the Day Tank, Discovery of RE18C with a Setpoint of 129 Inches Wc, and RE04B | | | 05000220/LER-1978-015, And LER 78-015-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery That the Fuel Transfer Pump in 102 D/G Would Not Fill the Day Tank and Discovery That 12 Control Room Air Treatment Fan Would Not Run | And LER 78-015-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery That the Fuel Transfer Pump in 102 D/G Would Not Fill the Day Tank and Discovery That 12 Control Room Air Treatment Fan Would Not Run | | | 05000220/LER-1978-018, For Nine Mile Point Unit 1 Regarding Discovery of Main Steam High Flow Switch with a Setpoint of 106.2 PSI, Which Is Above the Technical Specification | For Nine Mile Point Unit 1 Regarding Discovery of Main Steam High Flow Switch with a Setpoint of 106.2 PSI, Which Is Above the Technical Specification | | | 05000220/LER-1978-019, For Nine Mile Point Unit 1 Regarding Discovery That Hydraulic Snubber 31-HS-1 Had Failed and Was Empty of Hydraulic Fluid and Disconnected from Its Anchor at the Feedwater Pipe | For Nine Mile Point Unit 1 Regarding Discovery That Hydraulic Snubber 31-HS-1 Had Failed and Was Empty of Hydraulic Fluid and Disconnected from Its Anchor at the Feedwater Pipe | | | 05000220/LER-1978-020, LERs 78-020-00, 78-021-00, 78-022-00, and 78-023-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery of RE18A with a Setpoint of 135 Inches Wc, Discovery of RE04A and RE04B with a Setpoint of 3.65 PSIG, Discovery o | LERs 78-020-00, 78-021-00, 78-022-00, and 78-023-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery of RE18A with a Setpoint of 135 Inches Wc, Discovery of RE04A and RE04B with a Setpoint of 3.65 PSIG, Discovery of Turbine . | | | 05000220/LER-1978-024, For Nine Mile Point Unit 1 Regarding Discovery That Test N1-St-Q2,4,5,7,8,9, and 10 Had Not Been Performed During a Review of Quarterly Surveillance Test Results | For Nine Mile Point Unit 1 Regarding Discovery That Test N1-St-Q2,4,5,7,8,9, and 10 Had Not Been Performed During a Review of Quarterly Surveillance Test Results | | | 05000220/LER-1978-025, LERs 78-025-00, 78-026-00, and 78-027-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery of RE04D with a Setpoint of 3.70 PSIG, Discovery of Numerous Small Leaks in Small Sample and Instrument Pipes, and Discovery | LERs 78-025-00, 78-026-00, and 78-027-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery of RE04D with a Setpoint of 3.70 PSIG, Discovery of Numerous Small Leaks in Small Sample and Instrument Pipes, and Discovery of RE22D Wit | | | 05000220/LER-1978-028, For Nine Mile Point Unit 1 Regarding Discovery of the Allowable Test Interval of TS 4.1.4c for the Core Spray Power-Operated Valves Had Been Exceeded | For Nine Mile Point Unit 1 Regarding Discovery of the Allowable Test Interval of TS 4.1.4c for the Core Spray Power-Operated Valves Had Been Exceeded | | | 05000220/LER-1978-029, Regarding Discovery of High Drywell Pressure Switches RE04A, RE04B, and RE04C with Setpoints Less Conservative than the Technical Specifications | Regarding Discovery of High Drywell Pressure Switches RE04A, RE04B, and RE04C with Setpoints Less Conservative than the Technical Specifications | | | 05000220/LER-1978-030, 78-031-00, and 78-032-00 for Nine Mile Point Unit 1 Regarding, Respectively, Unavailability of Feedwater Pump 29-03 While Its Pump Seals Were Replaced, Unavailability of Liquid Poison Pump NP02A While a Frozen Valve | 78-031-00, and 78-032-00 for Nine Mile Point Unit 1 Regarding, Respectively, Unavailability of Feedwater Pump 29-03 While Its Pump Seals Were Replaced, Unavailability of Liquid Poison Pump NP02A While a Frozen Valve | | | 05000220/LER-1978-033-03, /03L-0 on 780916:Surveillance Tests on Barton Model 289 Pressure Indicating Switches Showed Changes in Setpoints Due to Instru Drift.Rev Surveillance Test Scheds Now Adequate to Ensure Early Detection of Drifts | /03L-0 on 780916:Surveillance Tests on Barton Model 289 Pressure Indicating Switches Showed Changes in Setpoints Due to Instru Drift.Rev Surveillance Test Scheds Now Adequate to Ensure Early Detection of Drifts | | | 05000220/LER-1978-034, Regarding an Environmental Contractor Obtaining 22 Hourly Fish Impingement Samples, and One Two-Hour Sample, Which Is Contrary to the Technical Specification Requiring 24 Hourly Samples | Regarding an Environmental Contractor Obtaining 22 Hourly Fish Impingement Samples, and One Two-Hour Sample, Which Is Contrary to the Technical Specification Requiring 24 Hourly Samples | | | 05000220/LER-1978-035, Forwards LER 78-035/01T-0 | Forwards LER 78-035/01T-0 | | | 05000220/LER-1978-035-01, /01T-0 on 781020:all Main Steam High Flow Pressure Indicating Instr Were Found W/Setpoints Less than Tech Specs.Heise 0-200 PSIG Test Gauge Calibrated & Used in Test Had Loose Screw & Was Recalibrated | /01T-0 on 781020:all Main Steam High Flow Pressure Indicating Instr Were Found W/Setpoints Less than Tech Specs.Heise 0-200 PSIG Test Gauge Calibrated & Used in Test Had Loose Screw & Was Recalibrated | | | 05000220/LER-1978-036-04, /04T-0 on 781025:improper Appl of Brook Model 9456 Oval Gear Flowmeter Combined W/Failed Seal on Caustic Addition Pump Caused High Concentration of Sodium & Sulfate & Degraded Capability to Control Rate of Discharge | /04T-0 on 781025:improper Appl of Brook Model 9456 Oval Gear Flowmeter Combined W/Failed Seal on Caustic Addition Pump Caused High Concentration of Sodium & Sulfate & Degraded Capability to Control Rate of Discharge | | | 05000220/LER-1978-036, Forwards LER 78-036/04T-0 | Forwards LER 78-036/04T-0 | | | 05000220/LER-1978-037, Forwards LER 78-037/03L-0, 78-038/03L-0 & 78-039/03L-0 | Forwards LER 78-037/03L-0, 78-038/03L-0 & 78-039/03L-0 | | | 05000220/LER-1978-037-03, /03L-0 on 781027:test Revealed Trip Setpoint of 26.5 Inches Water on One Vacuum Switch in Vacuum Relief Sys from Pressure Supression Chamber to Rx Bldg.Caused by Instru Drift in a Mercoid Model CP4122 Vacuum Switch | /03L-0 on 781027:test Revealed Trip Setpoint of 26.5 Inches Water on One Vacuum Switch in Vacuum Relief Sys from Pressure Supression Chamber to Rx Bldg.Caused by Instru Drift in a Mercoid Model CP4122 Vacuum Switch | | | 05000220/LER-1978-038-03, /03L-0 on 781025:review of N1-ISP-RE22 Test Results Found 12 Instances Where Procedure Was Violated. Caused by Carelessness in Procedure Implementation. Re-instruction & Closer Supervision Instituted | /03L-0 on 781025:review of N1-ISP-RE22 Test Results Found 12 Instances Where Procedure Was Violated. Caused by Carelessness in Procedure Implementation. Re-instruction & Closer Supervision Instituted | | | 05000220/LER-1978-039-03, /03L-0 on 781103:surveillance Test N1-ISP-RE02 Revealed Rx Lo-Lo Water Level Switch W/Trip Setpoint of +2 Inches Water.Caused by Instru Drift.Setpoint Reset | /03L-0 on 781103:surveillance Test N1-ISP-RE02 Revealed Rx Lo-Lo Water Level Switch W/Trip Setpoint of +2 Inches Water.Caused by Instru Drift.Setpoint Reset | | | 05000220/LER-1978-040-03, /03L-0 on 781113: 112 Core Spray Topping Pump Motor Breaker Closed Starting Pump But Breaker Closing Spring Motor Was Running Continuously & Not Charging Closing Spring.Caused by Misaligned Motor Assembly at Latching Pawl | /03L-0 on 781113: 112 Core Spray Topping Pump Motor Breaker Closed Starting Pump But Breaker Closing Spring Motor Was Running Continuously & Not Charging Closing Spring.Caused by Misaligned Motor Assembly at Latching Pawl | | | 05000220/LER-1978-040, Forwards LER 78-040/03L-0 | Forwards LER 78-040/03L-0 | | | 05000220/LER-1978-041, Forwards LER 78-041/04T-0 | Forwards LER 78-041/04T-0 | | | 05000220/LER-1978-041-04, /04T-0 on 781220:during Impingement Sampling Only 23 Samples (22 Hourly Samples & One 2-hr Sample) Were Collected Instead of 24 Required Samples,Caused by one-time Personnel Scheduling Change | /04T-0 on 781220:during Impingement Sampling Only 23 Samples (22 Hourly Samples & One 2-hr Sample) Were Collected Instead of 24 Required Samples,Caused by one-time Personnel Scheduling Change | |
|