05000285/LER-1980-016-03, /03L-0:on 800621,weld on Suction Side of Pump CH-1B in Demineralized Water Flush Line Cracked.Caused by Vibration of Piping in Svc.Crack Was Ground Out & Rewelded Using Certified Procedure & Line Tested

From kanterella
Revision as of 02:24, 1 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-0:on 800621,weld on Suction Side of Pump CH-1B in Demineralized Water Flush Line Cracked.Caused by Vibration of Piping in Svc.Crack Was Ground Out & Rewelded Using Certified Procedure & Line Tested
ML19321A742
Person / Time
Site: Fort Calhoun 
Issue date: 06/25/1980
From: Jewell W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19321A738 List:
References
LER-80-016-03L, LER-80-16-3L, NUDOCS 8007240134
Download: ML19321A742 (4)


LER-1980-016, /03L-0:on 800621,weld on Suction Side of Pump CH-1B in Demineralized Water Flush Line Cracked.Caused by Vibration of Piping in Svc.Crack Was Ground Out & Rewelded Using Certified Procedure & Line Tested
Event date:
Report date:
2851980016R03 - NRC Website

text

_ _

LICENSEE EVENT REPORT

~

~

' CONTROL BLOCK: l l

l l

l l lh (PLEASE P91NT OR TYPE ALL REQUIRED INFORMATION) 8 6

l Nl El Fi Cl Sl 11@l 0l 01 01 0 l 0 l 0l 0 l 0 l 0 l 0 l 0 l@26l4l1l1l1l1l@l l

l@

0 t 14 15 UCENSE NUMBER 25 UCENSE TvPE JO 57 CAT 58 7

8 9 UCENSEE CODE CON'T s ujy lL l@l0 l 5 10 l 0l O f 21 8l S l@l 0 l 612 l l l 810 l@l 0 l 6 l 215 l 8 l 0 l@

IOI1I 7

8 60 61 DOCKET NUMcER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h EI The weld on the suction side of the pump CH-1B in the demineralized water flush I

r5 trl I line cracked. Redundent charging pumps CH-1A and CH-1C were operable therefore I

OiAi l Technical Specifications 2.2. requirements were satisfied. Related LER's are I

iO isi I LER 78-005,78-006, 78-046.

I l

10161l I

10171 I I

10,811 SCI:

$ao*E ssCO$E COMPONENT CODE SUSC dE SU E

E lO19l lP IC l@ l Bl@ l Cl@ l P lIl P l E l Y lX l@ l Al@ @ @

7 8

9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LER EVENT Y E AR R EPORT NO.

COCE TYPE N O.

@ yg/RO 1810l l-l 1011161 l/l 1013 l l Ll l-l l 0l a

._21 22 23 24 26 27 28 29 30 31 32 KN ACT O P T

NOURS 22 SB 4 FOR B.

$U MA UF C RER I Bl@l Zl@

l Z l@

l Zi@

l0l0l0l0l l N l@

l NI@

lAl@

lC12l9l5l@

33 34 35 36 37 40 41 42 43 44 47 CA;JSE DESCRIPTION AND CORRECTIVE ACTIONS h li101i The crack was due to vibration of the oicino in service. The crack was around out I it sil I and rewelded usino a certified procedure and the line was hydrostatically tested i

D TT1 I before returning to service. No other corrective measures required.

I L'_L3.1 I I

Li_L* ! I l

' ClEY ipOwER OTNERsTATus b$iSCOYE0v' oiscovERv eEsCRirTiON [E_J@ l 110l Ol@l NA l

lAl@l Operator Observation l

4 1 s 48TiviTv CO'0 TENT RELEASED OF RELEASE AMOUNTOF ACT1VITv tOCAT10N OF RELEASE y l Z l @ W@l NA l-l NA l

,ERso~ net Ex,0.SEs oEsCRieTiON @

NuMeER Type l1 l 7l 10 l 0 l1 l@l E l@l1 Maintenance man 20 mrem l

PERsONNEtiN2U4ES NUMSER

DESCRIPTION

E 10 l 0 l 0 l@l NA l

7 8 9 11 12 80

' i's " "M"R #0 *"" @

^ '

Tv ITTo1 LZ J@l NA l

7 8 9 10 80 U

NRC USE ONLY 45

DESCRIPTION

isdsut @l NA

<V l

11lllililllll{

)

2 O 68 69 80 -

7 8 9 10 W.

. sleWell 402-426-4011 2,

NAME OF PREPARER PHONE:

me omosy

LER No.80-016 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000295 ATTACHMENT NO. 1

Safety Analysis

During the time that CH-1B was out of service for repair of the crack in the demineralized flush line, CH-1A and CH-1C were operable except for a two hour period that CH-lC was out of service due to a solenoid that failed open on the leak off line.

- na Technical Specifications 2.2(3) Modification of Minimum Require-ments ments were met and there was no significant exposure to plant personnel or activity released to the atmosphere.

1 v. m y,+>-

LER No.80-016 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 ATTACHMENT NO. 2

Corrective Action

The crack in the weld of the demineralized flush line was repaired by grinding out the old weld and rewelded using a certified procedure.

The line was hydrostatically tested before returning to service.

The vibration in the piping has been addressed and a modific.ation to install suporessors on the pump suction and discharge side has tieen partially completed.

A. _ b

.2 L.t$w 7

p s. c.s.

LER No.80-016 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 ATTACHMENT NO. 3 Failure Data This is the fourth reportable failure of this type at Fort Calhoun Station.

Incidents that are related to this failure were previously documented on LER 78-005,78-006 and 78-046.