05000333/LER-1981-063-03, /03L-0:on 810805,IRM G Became Erratic W/Upscale Spikes Causing half-scrams.Caused by Loose Connector at Preamplifier Which Allowed Momentary Grounding.Connector Tightened

From kanterella
Revision as of 07:08, 21 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-0:on 810805,IRM G Became Erratic W/Upscale Spikes Causing half-scrams.Caused by Loose Connector at Preamplifier Which Allowed Momentary Grounding.Connector Tightened
ML20010F783
Person / Time
Site: FitzPatrick 
Issue date: 09/02/1981
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20010F779 List:
References
LER-81-063-03L, LER-81-63-3L, NUDOCS 8109110325
Download: ML20010F783 (1)


LER-1981-063, /03L-0:on 810805,IRM G Became Erratic W/Upscale Spikes Causing half-scrams.Caused by Loose Connector at Preamplifier Which Allowed Momentary Grounding.Connector Tightened
Event date:
Report date:
3331981063R03 - NRC Website

text

U. S. NUCLE AR REGULC '9Y COMMISSION NRC FORM 366 (778 LICENSEE EVEjMT REPORT CONTROL BLOCK: l l

1 l

l I Ih (PLEAJE PRINT OR TYPE ALL REQUIRED INFORMATION) i e

TIM l N l Y l J l A l F l 1 l@l010l-10l010l0 l-lO!OlOl@lLlIlIl1l1l@l l

l@

7 8 9 LICENSEE CCOE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE J3 H LATED CON'T lolil

((Rcf l L l@l015101010131313 l@l 01810 l 51811 l@l o l 9 I 012 ! 8 I 1 l@

7 3

60 61 CCCK ET NuYS E R 68 69 EVENT C ATE 74 75 REPORT CATE 63 EVENT DESCOlPTION AND PRC8ABLE CONSEQUENCES h l o 12 I l During normal shutdown operations, IRM 'G' became erratic with upscale soikes I

lo13l l causing half-scrams.

IRM A (in the same Reactor Protection channel) was also 1

lo la l I inoperable. TS Table 3.1-1 required that Reactor Protection System ' A' be olaced I

4 t o i s I l in a tripped condi tion until IRM

'F' was repaired.

No slanificant hazard I

I loisl l existed.

l l o l 71 l I

I o la i l 80 7

8 3 CCY P.

V A LV !

SYSTEV

CAUSE

CAUSE COCE CCOE SU8 CODE CCVPCNENT COCE SLeC00E SLSCDCE loisl l ll Bl@ l E l@ l A l@ l El Ll El Cl 01 Nl@ [ Zl@ l Zl@

7 8

9 10 11 12 13 14 13 23 SECLENTI AL CCCUARENCE RE*CRT A EVISION tga AC EVENT YE AR REPORT NQ.

CODE TYPE NC.

@ N&Pg la li i 1-l 10 16 13 I I/I lo la I ltI l-!

l 01 a

21 22 23 24

6 27 IS
3 03 31 32 AC CN C PLANT E

d HOURS S6 a E FCA 9.

SL PP LI E VA FA T RER l B l@l Zl@

lZl@

l Z l@

l 0 10 l 0 l 0 l lN I@

l Yl@

l Nl@

lGl018l0l@

33

  1. 4 3 s.

Jo_

3 40 41 4;

43 44 47 CAUSE CESCRIPTICN AND CORRECTIVE ACTIONS lijallThe cause of erratic operation was due to a : loose connector at the ore-amolifier l

l i i t J l which al lowed momenta ry arounding.

Followina tiahtenina of the connector _ IRM

'F' I

i lwas tested with satisfactory results and returned to service within acoroximatelv g

i, ;2, I

iil2i Isix (6) hours.

I li t a l l 7

3 3 STA 5

  • b P % E A CTHERSTATUS CISCO Y

CISCOVERY CES;R:PT?CN NA l

l Al@l Ooerator Observation l

l1 i5llDl@ l0l 0l Ol@l ACTiv t TV CCNTENT mELEASE3 CP " ELE ASE AMOUNT CF ACTivlTV LCCATION OF PELEASE i

l l

.m ii ic i Lu @ ui@l 7

5 3 to 11 44 45 aa PERSCNNEL ExPCSURES NUV8iR TYPE CESCRIPTION 4 l

Ii l 7 l l 010 l 0 l@l Z lhl NA PERSONN EL INJURIES NUV9ER CES;BiPTION I

I:lallO!OIOl@l NA EO 7

3 3 11 12 LCSS OF CR DAVAGE TO FACILITY TYPE CESCRIPTION l

Iiio1IZI@l NA sa 7

a s to 8109110325 810902 NRc usE cNtv PusticiTY ISSUE 3 CESCRIPTION PDR ADOCK 05000333 PDR I

lll1ifIi!l I fj ;

l 2 l c ) l N l(S44jl NA g

4 63 69 dc ;

I 7

$ 9 70 715-162-;SL0

{

V. Verr.e Childs PHON E.

NAa.tE OF PREPARER e