License Renewal Phase IV Report 05000263/2020014
ML20182A685
Person / Time
Site: Monticello 
Issue date: 06/30/2020
From: Ann Marie Stone
NRC/RGN-III/DRP/B1
To: Conboy T
Northern States Power Company, Minnesota
References
IR 2020014
Download: ML20182A685 (10)


Text

June 30, 2020

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - LICENSE RENEWAL PHASE IV REPORT 05000263/2020014

Dear Mr. Conboy:

On June 10, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Monticello Nuclear Generating Plant and discussed the results of this inspection with Ms. M. Kelly, Director of Site Performance and Support and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Ann Marie J. Stone, Chief Engineering Branch 1 Division of Reactor Safety

Docket No. 05000263 License No. DPR-22

Enclosure:

As stated

Inspection Report

Docket Number:

05000263

License Number:

DPR-22

Report Number:

05000263/2020014

Enterprise Identifier: I-2020-014-0002

Licensee:

Northern States Power Company, Minnesota

Facility:

Monticello Nuclear Generating Plant

Location:

Monticello, MN

Inspection Dates:

June 01, 2020 to June 10, 2020

Inspectors:

J. Corujo-Sandin, Reactor Inspector

G. O'Dwyer, Reactor Engineer

J. Park, Reactor Inspector

Approved By:

Ann Marie J. Stone, Chief

Engineering Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a License Renewal Phase IV at Monticello Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. For the inspection documented below, it was determined that the objectives and requirements stated in the IP could be performed remotely.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

===71003 - Post-Approval Site Inspection for License Renewal

The team conducted this Phase IV license renewal inspection remotely. The team selected Aging Management Programs (AMPs) for evaluation considering risk insights and programs that were enhanced or new under the renewed operating license. The team also considered for selection those programs with monitoring results that were performed for the first time or those that identified examination or test results not experienced in the past. For the AMPs selected, the team reviewed records and interviewed plant staff to evaluate whether AMP elements were being implemented involving program scope, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, corrective actions, confirmation process, administrative controls, and operating experience.

The following aging management programs were evaluated by the team:

Post-Approval Site Inspection for License Renewal===

(1) EWI-11.01.11; Fuel Oil Chemistry
(2) EWI-11.01.14; Buried Piping & Tanks Inspection
(3) EWI-11.01.19; Compressed Air Monitoring
(4) EWI-11.01.31; Protective Coating Monitoring & Maintenance Program
(5) EWI-11.01.33; Bolting Integrity
(6) EWI-11.01.35; Selective Leaching of Materials

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On June 10, 2020, the inspectors presented the License Renewal Phase IV results to Ms. M. Kelly, Director of Site Performance and Support and other members of the licensee staff.
  • On June 10, 2020, the inspectors presented the Technical Debrief inspection results to Mr. J. Madden, Engineering Manager and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71003

Corrective Action

Documents

226439

Corrosion Discovered on Removed Fire Protection Valve

06/28/2010

228174

FP-13, License Renewal, Evidence of Selective Leaching

11/08/2010

232662

Add Note to MMP-008 to Clarify Requirements for Thread

Lubrication

05/23/2020

249063

Selective Leaching Identified on FP-7-2 Valve

09/09/2010

254764

Selective Leaching Identified on FP-199

10/19/2010

01356511

Selective Leaching Long Term Management Strategy

10/25/2012

01449311

Selective Leaching: Program Not Updated for New Strategy

10/03/2014

01475664

Torus Internal Coating Flaking Noted During 1132

04/22/2015

01475667

Torus Internal Corrosion Noted During 1132

04/22/2015

01477384

Numerous Small Areas of PCT Coatings Failed Acceptance

Criteria

05/28/2015

01558080

Numerous Small Areas of PCT Coatings Failed Acceptance

Criteria

05/05/2017

501000002818

1R XFMR - Moisture Found in 13.8KV Bus

09/22/2017

501000002848

1R XFMR - Enclosed Buses Need Sealing

09/20/2017

501000012494

PM 4159 Air Leaks Identified

05/25/2018

501000026573

4159-PM -3 Air Leaks Identified in the Drywell and 1 Minor Air

Leak in Steam Chase

04/30/2019

501000026876

Small Areas of Unsat PCT Coating

05/04/2019

501000028542

1362 Air Quality Test for IA System under WO 700042064

Single Benign Particle Detected

06/14/2019

501000032327

LR FSA AMP Ownership Needs Improvement

09/26/2019

501000032338

LR FSA: AMP Documents Outdated/Incorrect

09/26/2019

501000032354

LR FSA: Sel. Leaching Strategy Unclear

09/26/2019

501000032360

LR FSA: Bus Duct Inspection Criteria

09/26/2019

501000032360

LR FSA-Bus Duct Procedures Correct but USAR Not Updated

10/31/2019

501000036476

Bolting AMP OE Review

01/13/2020

501000036529

GAP Review for EWI-11.01.33 vs GALL 2

01/15/2020

501000038263-

200421-000

USAR-K Update Needed for ASME XI ISI Programs

03/01/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

501000038783

App J AMP Doc Issue

03/13/2020

501000039741

Unable to Find Form 3839 Records

04/16/2020

501000039871

SL AMP Procedures - Add Ductile Iron

04/20/2020

501000039968

1362 Air Quality Test for 17 AC Detected 10 Particles Greater

than 40 Microns

04/23/2020

Corrective Action

Documents

Resulting from

Inspection

501000039970

20 LR NRC Insp: LR-ISG-2012-02 OEE

04/22/2020

501000040540

20 LR NRC Insp: AMP Doc PM Lists

05/12/2020

501000041198

20 LR NRC Insp: Buried Pipe AMP PM

06/02/2020

501000041227

20 LR NRC Insp: Response >24 hrs

06/03/2020

501000041258

20 LR NRC Insp: USAR-K SL Outdated

06/03/2020

501000041281

20 LR NRC Insp: SL Valve Strategy

06/03/2020

501000041300

20 LR NRC Insp: SL Inspection Doc

06/03/2020

501000041300

20 LR NRC Insp: SL Inspection Doc

06/03/2020

501000041303

20 LR NRC Insp: Duct Iron SL Insp Proc

06/04/2020

501000041313

20 LR NRC Inspection: EWI-11.01.33 Should Be Enhanced

to Clarify Molybdenum Disulfide (MoS2) SHALL NOT Be Used

on Bolts in Scope of Bolting Integrity Program

06/04/2020

501000041313

20 LR NRC Insp: EWI-11.01.33 MoS2 Enh

06/04/2020

501000041316

20 LR NRC Insp: EWI-11.01.31 Enh

06/04/2020

501000041342

20 LR NRC Insp: Inadequate CAP Closure

06/05/2020

501000041351

Gap in RM Process for Lost Records

06/05/2020

501000041384

20 LR NRC Insp Questioned EWI-11.01.19 Pump Casing

Requirement

06/08/2020

501000041463

20 LR NRC Insp: Coatings Observation

06/11/2020

Miscellaneous

OE

600000676449

Fermi Power Plant, Unit 2 - Special Inspection Reactive Report

05000341/2019050

05/01/2020

OE

610000000867

EPRI Selective Leaching State of the Art Technical Update

(3002016057)

03/25/2020

OE

610000000879

NUREG-2191 Vol 2, Generic Aging Lessons Learned for

Subsequent License Renewal (GALL-SLR) Report, Section

XI.M33 Selective Leaching

05/12/2020

Procedures

0140

Drywell Interior Surface Inspection

268

Fire Protection System Flow Test

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AWI-08.11.03

Nuclear Coatings Program

4108-01-PM

Emergency Diesel Generator 6 Year Maintenance

EWI-08.26.02

Selective Leaching Inspection Process

EWI-11.01.01

Bus Duct Inspection Program

EWI-11.01.11

Fuel Oil Chemistry

EWI-11.01.14

Buried Piping & Tanks Inspection

EWI-11.01.19

Compressed Air Monitoring

EWI-11.01.31

Protective Coating Monitoring & Maintenance Program

EWI-11.01.33

Bolting Integrity

EWI-11.01.35

Selective Leaching of Materials

FP-G-RM-01

Quality Assurance Records Control

FP-G-RM-02

Records Processing

FP-PE-RLP-01

License Renewal Implementation

FP-PE-UPT-01

Underground Piping and Tanks Integrity Program

FP-WM-PLA-01

Work Order Planning Process

NSP-DOL-0598

Diesel Fuel Oil Tank Inspection

NSP-DOL-0598

Diesel Fuel Tank Inspection

PCR

2000015193-

200420-000

Procedure Change Request for EWI-11.01.33 Bolting Integrity

03/09/2020

PCR

2000015610

Procedure Change Request for MMP-008, Bolting Practices

PCR

2000015610

Procedure Change Request for MMP-008

PEI-03.01.03

Selective Leaching (Graphitic Corrosion) Inspection

Self-Assessments 01468275

Audit Aging Management Programs

03/02/2015

01533999

Aging Management SSA in Prep for 2016 P&IR

09/07/2016

6060000001098

SnapShot Report, Perform AMP Effectiveness Reviews in

Accordance with NEI 14-12

03/01/2020

606000000952

License Renewal Phase IV Self-Assessment Plan

09/26/2020

Work Orders

00453355

CONST - T-44, Transfer Fuel to FRAC Tanks and Clean T-44

06/12/2013

00453355

CONST - T-44, Transfer Fuel to Frac Tanks and Clean T-44

06/12/2013

00457542

Perform Elec PM

07/07/2013

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

00487027

OPS-FIR, 0268 3-Year Fire Protection System Flow Test

2/01/2015

00532393

EPRO - MRE, UPTI Inspection

01/22/2018

00552645

Const - T-45A, Clean and Inspect T-45A Day Tank

01/19/2018

490719

0135 Torus Painted Surface Internal Insp.

05/09/2015

490906

0140 Drywell Interior Surface Inspection

05/09/2015

500121

PM 4159 Leak Detection PM 3 ARs 5 WOs

05/10/2016

533733

0140 Drywell Interior Surface Inspection

05/10/2017

537441

CPF: Hydrant FP-192 AND FP-27; Install New Valves

04/22/2017

537441

CPF: Hydrant FP-192 and FP-27, Install New Valves

03/17/2017

700005790-0020

Perform UT and Visual Inspection of Tank, Inspect LIS-7259

06/08/2017

700009412

EDG G-3B Electrical Control Panel Bolt Broken

2/13/2019

700013462

Performed PM 4858-59 for 1R XFMR X03

10/26/2017

700017270

Walk Down Found No Problems in Air and AN2 Systems within

LR Scope

04/14/2019

700020823

0140 Drywell Interior Surface Inspection

05/10/2019

700023986

PM 4159 Leak Reduced to Less than Champagne Bubbles

05/29/2018

700031848

PM 4954 Air Dryers Leak Shows Elbow Needs to Be Replaced

QIM 501000016607 Written

09/07/2018

700047082

Walked Down Found No Problems in Air and AN2 Systems

within LR Scope

2/13/2019

700058662

PM 4953 Compressors Results All SAT

01/28/2020

700059432

1362 Test All Results SAT

09/10/2019

700062663

1362 Test All Results Were SAT

03/13/2020

700067605

Graphitic Corrosion Inspection Results Form 3839

01/08/2020

QF0571

Troubleshooting Plan for QIM 501000039968 10 Particles

Greater than 40 Microns

04/23/2020