MONTHYEARML21070A4122021-03-11011 March 2021 Requesting Revision to License Condition in Appendix C in Renewed Facility Operating License Project stage: Request ML21111A0312021-04-20020 April 2021 Application to Modify 50.69 Categorization to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Tier 1 Categorization Process Project stage: Other ML21125A2152021-05-0505 May 2021 Supplement Application to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Tier 1 Categorization Process in Accordance Project stage: Supplement ML21140A0842021-05-19019 May 2021 Acceptance of Requested Licensing Action Revision to Appendix C License Conditions in Accordance with the Requirements of 10 CFR 50.69 (E-mail) Project stage: Acceptance Review ML21263A2482021-10-0101 October 2021 Audit Plan Supporting LAR Request to Implement Alternate Defense-in-Depth, Pressure Boundary, & Seismic Tier 1 Categorization Process in Accordance with Requirements of 10 CFR 50.69 Project stage: Approval ML21295A0362021-10-20020 October 2021 NRR E-mail Capture - Supplement to Limerick 50.69 Audit Plan Dated October 1, 2021 (L-2021-LLA-0042) Project stage: Other ML22028A1832022-01-24024 January 2022 NRR E-mail Capture - Audit Plan Supplement for LIM 50.69 LAR (L-2021-LLA-0042) Project stage: Approval ML22034A0142022-02-0202 February 2022 NRR E-mail Capture - Audit Plan Supplement for LIM 50.69 LAR (L-2021-LLA-0042) Project stage: Approval ML22045A4802022-02-14014 February 2022 Supplement - Application to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Categorization Process in Accordance with Project stage: Supplement ML22103A2542022-04-19019 April 2022 Draft Request for Additional Information Project stage: Draft RAI ML22136A0032022-05-13013 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Limerick License Amendment Request (L-2021-LLA-0042) Project stage: RAI PMNS20220671, Public Meeting to Discuss Request for Additional Information for Limerick Generating Station License Amendment Request Regarding 10 CFR 50.69 License Conditions2022-06-24024 June 2022 Public Meeting to Discuss Request for Additional Information for Limerick Generating Station License Amendment Request Regarding 10 CFR 50.69 License Conditions Project stage: RAI ML22168A1922022-06-24024 June 2022 Summary of May 3, 2022, Public Observation Meeting with Constellation Energy Generation, LLC Re. Proposed License Amendment Request to Modify 10 CFR 50.69 License Conditions Project stage: Meeting ML22182A4002022-06-30030 June 2022 Response to RAI, Application to Implement Alternate Defense-in-Depth Categorization Process, Alternate Pressure Boundary Categorization Process & Alternate Seismic Categorization Process Project stage: Response to RAI ML22227A1112022-08-25025 August 2022 Summary of June 24, 2022, Public Observation Meeting with Constellation Energy Generation, LLC Proposed License Amendment Request to Modify 10 CFR 50.69 License Conditions Project stage: Meeting PMNS20230131, Public Meeting to Discuss Status of NRC Review of Limerick Generating Station License Amendment Request Regarding 10 CFR 50.69 License Conditions2023-02-22022 February 2023 Public Meeting to Discuss Status of NRC Review of Limerick Generating Station License Amendment Request Regarding 10 CFR 50.69 License Conditions Project stage: Meeting ML23053A1562023-02-23023 February 2023 NRC Presentation Slides for Public Meeting on February 23, 2023 - 10 CFR 50.69 Alternate Processes License Amendment Request Preliminary Partial Denial Project stage: Meeting ML23076A2832023-02-23023 February 2023, 28 March 2023 Summary of February 23, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re. Proposed License Amendment Request to Modify 10 CFR 50.69 License Conditions Project stage: Request ML23076A2812023-02-23023 February 2023 Licensee Presentation on Pressure Boundary Process Project stage: Other ML23076A2822023-02-23023 February 2023 Licensee Presentation on Defense-in-Depth Process Project stage: Other ML23079A1882023-03-24024 March 2023 Summary of Regulatory Audit in Support of Alternate Processes for Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Project stage: Other ML23076A2802023-03-28028 March 2023 Summary of February 23, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re. Proposed License Amendment Request to Modify 10 CFR 50.69 License Conditions Project stage: Meeting ML23089A1602023-03-30030 March 2023 NRR E-mail Capture - NRC Notification to the Commonwealth of Pennsylvania Re. Limerick Generating Station, Units 1 and 2 Amendment - Alternative 10 CFR 50.69 Categorization Approaches Project stage: Other ML23094A1982023-05-17017 May 2023 Notice of Issuance of Amendment Nos. 261 & 223 and Denial - Federal Register Notice Project stage: Approval ML23094A1792023-05-17017 May 2023 Amd Nos. 261 & 223 Alternate Seismic Approach for Risk-Informed Categorization & Treatment of Structures, Systems, Components for NPR & Denial of Proposed Alternative Defense in Depth & Pressure Boundary Component-Partial Denial SE Encl 4 Project stage: Other ML23089A1242023-05-17017 May 2023 Issuance of Amd Nos. 261 & 223 Alternate Seismic Approach for Risk-Informed Categorization and Treatment of Structures, Systems a Components for NPR and Denial Proposed Alternative Defense in Depth and Pressure Boundary Component Project stage: Approval ML23094A1712023-05-17017 May 2023 Amd Nos. 261 & 223 Alternate Seismic Approach for Risk-Informed Categorization & Treatment of Structures, Systems and Components for NPR and Denial Proposed Alternative Defense in Depth and Pressure Boundary Component Project stage: Other 2022-04-19
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24234A2772024-08-21021 August 2024 NRR E-mail Capture - Final RAI - Constellation Energy, LLC - Fleet Request - Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031) ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24176A1292024-06-20020 June 2024 Estimated Completion Schedule Change Email ML24156A0082024-05-31031 May 2024 NRR E-mail Capture - Constellation Energy, LLC - Fleet Request - Acceptance of Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24107A9192024-05-0808 May 2024 Email to Christian Williams Re Decision on the Limerick Exemption ML24107A9202024-05-0303 May 2024 Email to Christian Williams Re Availability of Environmental Assessment for the Limerick Exemption ML24122C6742024-05-0101 May 2024 Response to a Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24122C6702024-04-29029 April 2024 Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24051A0652024-02-16016 February 2024 Digital I&C LAR RAIs Re HFE (Email) ML24026A2922024-01-26026 January 2024 – Request for Additional Information Regarding Limerick Digital Instrumentation and Controls License Amendment Request ML23331A0062023-11-22022 November 2023 (External Sender) Supplement - Limerick Security Rule Exemption Request – ISFSI Docket No. Reference ML23311A2412023-11-0707 November 2023 NRR E-mail Capture - NRC Notification to the Commonwealth of Pennsylvania Re. Limerick Generating Station, Units 1 and 2 Amendment - Control Room Ventilation System Technical Specifications ML23304A0192023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Limerick 1 & 2 - Exemption from Security Rule (L-2023-LLE-0026) ML23276B4642023-10-0303 October 2023 NRR E-mail Capture - NRC Request for Additional Information Limerick TSTF-477 LAR ML23255A2872023-09-12012 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A ML23248A1282023-09-0101 September 2023 NRR E-mail Capture - Action: Opportunity to Review and Comment on a New NRC Information Collection, 10 CFR Part 50.55a, Codes and Standards (3150-XXXX) ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23208A1942023-07-27027 July 2023 NRR E-mail Capture - Limerick Generating Station - Audit Plan for TSTF-477 LAR Review (L-2022-LLA-0174) ML23202A0682023-07-21021 July 2023 NRR E-mail Capture - NRC Request for Additional Information Re. TSTF-477 LAR ML23201A1262023-07-18018 July 2023 Additional RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support ML23173A0632023-06-20020 June 2023 RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support ML23102A1642023-04-12012 April 2023 Generation Station, Unit No. 2 – Potential Emergent Relief Request for HPCI IST (EPID L-2023-LLR-0015) - Closure E-mail Dated 4/12/2023 ML23125A0522023-03-31031 March 2023 NRR E-mail Capture - Clean OL Pages for 50.69 LAR ML23089A1602023-03-30030 March 2023 NRR E-mail Capture - NRC Notification to the Commonwealth of Pennsylvania Re. Limerick Generating Station, Units 1 and 2 Amendment - Alternative 10 CFR 50.69 Categorization Approaches ML23086B9282023-03-27027 March 2023 Acceptance of Requested Licensing Action for License Amendment Request to Support Digital Modernization Project Installation ML23086A0822023-03-27027 March 2023 – Acceptance of Requested Licensing Action for Exemption Request to Support Digital Modernization Project Installation ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML23060A1662022-12-20020 December 2022 Acceptance Review: Adopt TSTF-477, Revision 3-Acceptance Letter ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22172A0752022-06-17017 June 2022 Response: Review and Feedback on Draft Limerick Digital License Amendment Request (L-2020-LRM-0041) ML22136A0032022-05-13013 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Limerick License Amendment Request (L-2021-LLA-0042) ML22124A2862022-05-0404 May 2022 Information Needed to Provide Substantive Feedback on Human Factors Engineering Supporting the Planned Limerick Digital I&C License Amendment Request ML22089A1172022-03-30030 March 2022 Additional Comments and Questions on Constellations March 31st Presentation ML22089A1162022-03-28028 March 2022 Comments and Questions on Constellations March 31st Presentation ML22112A2152022-03-28028 March 2022 Limerick_Acceptance Review TS Change to Correct Nonconservative Technical Specification Table 3.3.3-1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22034A0142022-02-0202 February 2022 NRR E-mail Capture - Audit Plan Supplement for LIM 50.69 LAR (L-2021-LLA-0042) ML22028A1832022-01-24024 January 2022 NRR E-mail Capture - Audit Plan Supplement for LIM 50.69 LAR (L-2021-LLA-0042) ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML22005A1812022-01-0505 January 2022 NRR E-mail Capture - Staffs Questions Pertaining to Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting Slides December 7, 2021 ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21295A0362021-10-20020 October 2021 NRR E-mail Capture - Supplement to Limerick 50.69 Audit Plan Dated October 1, 2021 (L-2021-LLA-0042) ML21286A0302021-10-13013 October 2021 Staffs Questions Pertaining to Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting Slides October 20, 2021 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 2024-09-06
[Table view] |
Text
From: Klett, Audrey Sent: Monday, January 24, 2022 2:55 PM To: Stewart, Glenn H:(Exelon Nuclear)
Cc: Sreenivas, V
Subject:
Audit Plan Supplement for LIM 50.69 LAR (L-2021-LLA-0042)
Attachments: Audit Questions (Seismic) - LIM 5069 (L-2021-LLA-0042).docx
Hi Glenn,
By letter dated March 11, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21070A412), as supplemented by letters dated May 5, 2021 and December 15, 2021 (ADAMS Accession Nos. ML21125A215 and ML21349B364, respectively),
Exelon Generation Company, LLC (the licensee) requested a license amendment to Renewed Facility Operating License Nos. NPF-39 and NPF-85 for the Limerick Generation Station, Units 1 and 2 (Limerick) related to its previous adoption of Title 10 of the Code of Federal Regulations (10 CFR), Part 50.69, Risk-informed categorization and treatment of structures, systems and components for nuclear power reactors.
This email serves as a supplement to NRCs Audit Plan dated October 1 and 21, 2021 (ADAMS Accession Nos. ML21263A248 and ML21295A036). The NRC staff is continuing the audit through February 25, 2022, to discuss new and follow-up questions resulting from the previous audit teleconference and the licensees supplements to its submittal. The NRC staff will request information and interviews throughout the audit period. Throughout the audit, the NRC staff will supplement this list with audit questions and audit-related requests so that the licensee can prepare for audit discussions with NRC staff. Any information accessed through the licensees portal will not be held or retained in any way by NRC staff. The NRC will use the audit questions and portal information to support the periodic audit meetings with the licensee, which the NRC staff will schedule as needed. The NRC staff requests the licensee to have the requested audit information be readily available and accessible for the NRC staffs review via a Web-based portal.
The attachment to this email includes a set of new audit questions pertaining to the supplement dated December 15, 2021. The staff requests a teleconference with the licensee either late this week or next week to discuss the audit questions.
Audrey Klett, Senior Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Operating Reactor Licensing Plant Licensing Branch 1 301-415-0489
Hearing Identifier: NRR_DRMA Email Number: 1500
Mail Envelope Properties (BLAPR09MB60673A241603F93E49FAB062875E9)
Subject:
Audit Plan Supplement for LIM 50.69 LAR (L-2021-LLA-0042)
Sent Date: 1/24/2022 2:54:32 PM Received Date: 1/24/2022 2:54:00 PM From: Klett, Audrey
Created By: Audrey.Klett@nrc.gov
Recipients:
"Sreenivas, V" <V.Sreenivas@nrc.gov>
Tracking Status: None "Stewart, Glenn H:(Exelon Nuclear)" <Glenn.Stewart@exeloncorp.com>
Tracking Status: None
Post Office: BLAPR09MB6067.namprd09.prod.outlook.com
Files Size Date & Time MESSAGE 2169 1/24/2022 2:54:00 PM Audit Questions (Seismic) - LIM 5069 (L-2021-LLA-0042).docx 33616
Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
AUDIT QUESTIONS RELATED TO THE
DECEMBER 15, 2021, SUPPLEMENT TO THE LICENSE AMENDMENT REQUEST TO
TO IMPLEMENT ALTERNATIVE SEISMIC APPROACH IN APPROVED 10 CFR 50.69
EXELON GENERATION COMPANY, LLC
LIMERICK GENERATING STATION, UNITS 1 AND 2
DOCKET NOS. 50-352, 50-353
APLC Use of Different Approaches for Seismic Risk Consideration in 10 CFR 50.69 Categorization
The proposed license condition in Section 2.2 of Attachment 1 to the supplement dated December 15, 2021 (Agencywide Document Accession and Management System (ADAMS)
Accession No. ML21349B364) states that categorization of systems can be performed using either the previously approved Seismic Margins Analysis (SMA) approach or the proposed alternative seismic approach. Section 3.1.1 of Enclosure 1 to the submittal dated March 11, 2021 (ADAMS Accession No. ML21070A412), discusses the overall categorization process. Based on the available information in the original submittal and subsequent supplements, including the supplement dated December 15, 2021, it is unclear to the NRC staff which approach will be used for categorizing an entire system.
The discussion of the Tier 1 approach in Sections 3.1.1 and 4.1 of Enclosure 1 to the submittal dated March 11, 2021, is not changed by the supplement dated December 15, 2021. The purpose of retaining the mention of the Tier 1 approach, which is no longer being requested or reviewed per the supplement dated December 15, 2021, in these sections is unclear to the NRC staff.
Table 1 in Attachment 1 to the supplement dated December 15, 2021, has two different entries under seismic in the Risk (Non-modeled) element. It is unclear to the NRC staff whether the first entry is for the previously approved SMA approach. Therefore:
- i. Confirm that the licensee proposes to use a single approach (i.e., either SMA or, if approved, the proposed alternative seismic approach described in the supplement dated December 15, 2021) for categorization of an entire system. If the licensee proposes to use different approaches for different components of the same system, then justify the validity of such an implementation given the differences in the underlying basis for the approaches and the guidance in NEI 00-04, Revision 0 (ADAMS Accession No. ML052910035), which indicates the use of a single approach for categorizing a system.
ii. Clarify whether not changing the mention of Tier 1 approach from Sections 3.1.1 and 4.1 of Enclosure 1 to the submittal dated March 11, 2021 via the supplement dated December 15, 2021, is an oversight. If it is, then provide the updated text for those sections. If it is not, then provide the justification, given that the Tier 1 approach is no longer being requested by the licensee or reviewed by the NRC staff.
1
iii. Confirm that only the Tier 2 alternative seismic approach is being requested for use in the licensees 10 CFR 50.69 program, clarifying the intent of multiple instances of statements such as Exelon considers the Limerick site to be a Tier 1 site in the context of the NRC staffs review of the Tier 2 approach and the proposed license condition (see APLC-02).
iv. Confirm that the first entry under seismic in the Risk (Non-modeled) element in Table 1 in Attachment 1 to the supplement dated December 15, 2021, applies to the previously approved SMA approach. If such confirmation cannot be provided, then explain the intent, purpose, and use of this entry in the context of the supplement dated December 15, 2021, and the licensees approved 10 CFR 50.69 program.
APLC RAI 02 - Proposed Changes to License Condition
The proposed license condition in Section 2.2 of Attachment 1 to the supplement dated December 15, 2021, states, in part:
In addition, Exelon is approved to implement 10 CFR 50.69 using any of the following alternate processes for categorization of RISC-1, RISC-2, RISC-3, and RISC-4 SSCs: the defense-in-depth approach contained in PWROG-20015-NP; the passive pressure boundary categorization approach described in EPRI 3002015999; and the alternative seismic approach as described in Exelon's submittal letter dated March 11, 2021, and associated supplements, as specified in Unit [1] License Amendment No. [XXX] dated [DATE].
While the licensee states in Attachment 1 to the supplement dated December 15, 2021, that the information in each section of the supplement supersedes the information in the corresponding section of the submittal dated March 11, 2021, in its entirety, the NRC staff identified instances from the submittal dated March 11, 2021, where the Tier 1 approach does not appear to be superseded (see APLC-01 (ii)). Further, the supplement dated December 15, 2021, includes language such as Exelon considers the Limerick site to be a Tier 1 site (see APLC-01 (iii)).
Therefore, the dated March 11, 2021, and associated supplements, portion of the proposed license condition is ambiguous. The use of and associated supplements in the proposed license condition could be misinterpreted to mean that the NRC would be approving both the approach (i.e., the Tier 1 approach) in the submittal dated March 11, 2021, and the approach (i.e., the Tier 2 approach) in the supplement dated December 15, 2021. This is inconsistent with the licensees request in, and the NRC staffs review of the supplement dated December 15, 2021. The NRC staff notes that the use of and associated supplements language in previous NRC-approved amendments (e.g., ADAMS Accession Nos. ML19330D909 and ML21082A422) was appropriate for those cases because the supplements clarified or updated the same approach that was proposed in the corresponding LAR submittals. However, Limericks situation is different in that the supplement dated December 15, 2021, proposes an approach which is different from that in the LAR submittal (i.e., the submittal dated March 11, 2021).
Please revise the license condition to reference only the supplements that include the Tier 2 approach (e.g., the December 15 supplement and any subsequent relevant supplement(s)) or revise the license in some other way to make it unambiguous that only the Tier 2 alternative seismic approach is approved for use in Limericks 10 CFR 50.69 program.