MONTHYEARML20160A0532020-06-0808 June 2020 Digital Modernization Project LAR - Presubmittal Meeting - NRC Presubmittal Meeting Telecon June 12, 2020 Project stage: Meeting ML20162A0192020-06-10010 June 2020 NRC Staff Presentation for June 12, 2020, Public Pre-Application Meeting: ISG-06 Alternate Review Process Lessons Learned from Pre-Application Meetings Project stage: Meeting ML20175A2402020-06-30030 June 2020 Summary of June 12, 2020, Public Telephone Conference with Exelon Generation Company, LLC Regarding Planned Digital Modernization License Amendment Request Project stage: Other ML21063A1192021-03-0404 March 2021 Digital Modernization Project LAR Pre-submittal Meeting - March 16, 2021 (EPID L-2020-LRM-0041) (Slides) Project stage: Meeting ML21133A1342021-04-29029 April 2021 0 to Updated Final Safety Analysis Report, Chapter 15, Sections 15.0 Through 15.5 Project stage: Request ML21123A1362021-05-13013 May 2021 Summary of March 16, 2021, Public Webinar with Exelon Generation Company, LLC Regarding Planned Digital Modernization License Amendment Request Project stage: Other ML21174A0852021-06-23023 June 2021 Digital Modernization Project LAR Pre-submittal Meeting Project stage: Meeting PMNS20210655, Pre-Submittal Meeting with Exelon Generation Company, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22021-06-25025 June 2021 Pre-Submittal Meeting with Exelon Generation Company, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML21175A1732021-06-29029 June 2021 Digital Modernization Project LAR Pre-submittal Meeting Project stage: Meeting NL-21-0634, Request to Eliminate Automatic Main Steam Line Isolation on High Turbine Building Area Temperature2021-10-13013 October 2021 Request to Eliminate Automatic Main Steam Line Isolation on High Turbine Building Area Temperature Project stage: Request ML21286A0302021-10-13013 October 2021 Staffs Questions Pertaining to Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting Slides October 20, 2021 Project stage: Meeting PMNS20211169, Pre-Submittal Meeting with Exelon Generating Company, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22021-10-16016 October 2021 Pre-Submittal Meeting with Exelon Generating Company, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML21278A5452021-10-20020 October 2021 Digital Modernization Project LAR Pre-submittal Meeting Presentation Slides October 20, 2021 Project stage: Meeting ML21300A2772021-11-0909 November 2021 Summary of October 20, 2021, Pre-Submittal Public Teams Meeting with Exelon Generation Company, LLC Regarding Planned Digital Modernization License Amendment Request Project stage: Meeting ML21301A1612021-11-15015 November 2021 Summary of June 29, 2021, Public Meeting with Exelon Generation Company, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting PMNS20211501, Pre-Submittal Meeting with Exelon Generating Company, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22021-11-26026 November 2021 Pre-Submittal Meeting with Exelon Generating Company, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML21335A0772021-12-0707 December 2021 Dec 07 2021 LGS Digital Modernization Pre-submittal Meeting Slides Project stage: Request ML22005A1812022-01-0505 January 2022 NRR E-mail Capture - Staffs Questions Pertaining to Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting Slides December 7, 2021 Project stage: Meeting PMNS20211500, Pre-Submittal Meeting with Exelon Generating Company, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22022-01-10010 January 2022 Pre-Submittal Meeting with Exelon Generating Company, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML22021B2942022-02-0202 February 2022 Summary of December 7, 2021, Public Meeting with Exelon Generation Company, LLC Regarding Planned Digital Modernization License Amendment Project stage: Meeting ML22038A0992022-02-23023 February 2022 Summary of January 11, 2022, Public Meeting with Exelon Generation Company, LLC Regarding Planned Digital Modernization License Amendment Request Project stage: Meeting ML22080A1992022-03-18018 March 2022 Affidavit for Proprietary Presentation for March 31, 2022 Pre-Submittal Meeting with Constellation Energy Generation, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 Project stage: Meeting ML22089A1162022-03-28028 March 2022 Comments and Questions on Constellations March 31st Presentation Project stage: Other ML22089A1172022-03-30030 March 2022 Additional Comments and Questions on Constellations March 31st Presentation Project stage: Other ML22124A2862022-05-0404 May 2022 Information Needed to Provide Substantive Feedback on Human Factors Engineering Supporting the Planned Limerick Digital I&C License Amendment Request Project stage: Other ML22153A3602022-06-0909 June 2022 Constellations Presentation for June 9, 2022 Public Meeting About Limerick Generating Station Digital Modernization Project Project stage: Meeting ML22172A0752022-06-17017 June 2022 Response: Review and Feedback on Draft Limerick Digital License Amendment Request (L-2020-LRM-0041) Project stage: Draft Other ML22249A2202022-09-0606 September 2022 Constellations Non-Proprietary Presentation for Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting September 8, 2022 Project stage: Meeting ML22250A4372022-09-0808 September 2022 NRC Staffs Presentation for September 8, 2022 Partially Closed Public Meeting with Constellation - Review Planning and Tentative Review Timeline Project stage: Meeting 2021-06-23
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24234A2772024-08-21021 August 2024 NRR E-mail Capture - Final RAI - Constellation Energy, LLC - Fleet Request - Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031) ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24176A1292024-06-20020 June 2024 Estimated Completion Schedule Change Email ML24156A0082024-05-31031 May 2024 NRR E-mail Capture - Constellation Energy, LLC - Fleet Request - Acceptance of Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24107A9192024-05-0808 May 2024 Email to Christian Williams Re Decision on the Limerick Exemption ML24107A9202024-05-0303 May 2024 Email to Christian Williams Re Availability of Environmental Assessment for the Limerick Exemption ML24122C6742024-05-0101 May 2024 Response to a Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24122C6702024-04-29029 April 2024 Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24051A0652024-02-16016 February 2024 Digital I&C LAR RAIs Re HFE (Email) ML24026A2922024-01-26026 January 2024 – Request for Additional Information Regarding Limerick Digital Instrumentation and Controls License Amendment Request ML23331A0062023-11-22022 November 2023 (External Sender) Supplement - Limerick Security Rule Exemption Request – ISFSI Docket No. Reference ML23311A2412023-11-0707 November 2023 NRR E-mail Capture - NRC Notification to the Commonwealth of Pennsylvania Re. Limerick Generating Station, Units 1 and 2 Amendment - Control Room Ventilation System Technical Specifications ML23304A0192023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Limerick 1 & 2 - Exemption from Security Rule (L-2023-LLE-0026) ML23276B4642023-10-0303 October 2023 NRR E-mail Capture - NRC Request for Additional Information Limerick TSTF-477 LAR ML23255A2872023-09-12012 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A ML23248A1282023-09-0101 September 2023 NRR E-mail Capture - Action: Opportunity to Review and Comment on a New NRC Information Collection, 10 CFR Part 50.55a, Codes and Standards (3150-XXXX) ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23208A1942023-07-27027 July 2023 NRR E-mail Capture - Limerick Generating Station - Audit Plan for TSTF-477 LAR Review (L-2022-LLA-0174) ML23202A0682023-07-21021 July 2023 NRR E-mail Capture - NRC Request for Additional Information Re. TSTF-477 LAR ML23201A1262023-07-18018 July 2023 Additional RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support ML23173A0632023-06-20020 June 2023 RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support ML23102A1642023-04-12012 April 2023 Generation Station, Unit No. 2 – Potential Emergent Relief Request for HPCI IST (EPID L-2023-LLR-0015) - Closure E-mail Dated 4/12/2023 ML23125A0522023-03-31031 March 2023 NRR E-mail Capture - Clean OL Pages for 50.69 LAR ML23089A1602023-03-30030 March 2023 NRR E-mail Capture - NRC Notification to the Commonwealth of Pennsylvania Re. Limerick Generating Station, Units 1 and 2 Amendment - Alternative 10 CFR 50.69 Categorization Approaches ML23086B9282023-03-27027 March 2023 Acceptance of Requested Licensing Action for License Amendment Request to Support Digital Modernization Project Installation ML23086A0822023-03-27027 March 2023 – Acceptance of Requested Licensing Action for Exemption Request to Support Digital Modernization Project Installation ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML23060A1662022-12-20020 December 2022 Acceptance Review: Adopt TSTF-477, Revision 3-Acceptance Letter ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22172A0752022-06-17017 June 2022 Response: Review and Feedback on Draft Limerick Digital License Amendment Request (L-2020-LRM-0041) ML22136A0032022-05-13013 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Limerick License Amendment Request (L-2021-LLA-0042) ML22124A2862022-05-0404 May 2022 Information Needed to Provide Substantive Feedback on Human Factors Engineering Supporting the Planned Limerick Digital I&C License Amendment Request ML22089A1172022-03-30030 March 2022 Additional Comments and Questions on Constellations March 31st Presentation ML22089A1162022-03-28028 March 2022 Comments and Questions on Constellations March 31st Presentation ML22112A2152022-03-28028 March 2022 Limerick_Acceptance Review TS Change to Correct Nonconservative Technical Specification Table 3.3.3-1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22034A0142022-02-0202 February 2022 NRR E-mail Capture - Audit Plan Supplement for LIM 50.69 LAR (L-2021-LLA-0042) ML22028A1832022-01-24024 January 2022 NRR E-mail Capture - Audit Plan Supplement for LIM 50.69 LAR (L-2021-LLA-0042) ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML22005A1812022-01-0505 January 2022 NRR E-mail Capture - Staffs Questions Pertaining to Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting Slides December 7, 2021 ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21295A0362021-10-20020 October 2021 NRR E-mail Capture - Supplement to Limerick 50.69 Audit Plan Dated October 1, 2021 (L-2021-LLA-0042) ML21286A0302021-10-13013 October 2021 Staffs Questions Pertaining to Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting Slides October 20, 2021 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 2024-09-06
[Table view] |
Text
From: Ballard, Brent Sent: Wednesday, January 5, 2022 12:41 PM To: Mascitelli, Francis J:(Exelon Nuclear)
Cc: Budock, George P:(Exelon Nuclear); Pareez Golub; Waters, Michael; Johnston, Jeanne; Marshall, Michael; Jain, Bhagwat
Subject:
Dec 7 Pre-submittal Meeting Written Feedback Attachments: 07DEC Public Meeting Feedback.docx
Good afternoon Frank,
Attached is NRC staff feedback from the December 7th public meeting. For item 3, the staff believes an agreement was reached on this point but we wanted to provide the feedback in writing in case additional discussion is needed. Please let me know if you have any questions on the feedback.
When can we expect to receive Exelons presentation for the January 11 th meeting?
Thank you, Brent
Brent Ballard Project Manager Plant Licensing Branch 1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 301-415-0680 Hearing Identifier: NRR_DRMA Email Number: 1473
Mail Envelope Properties (BY5PR09MB462766DC3741CAB7C317623AE04B9)
Subject:
Dec 7 Pre-submittal Meeting Written Feedback Sent Date: 1/5/2022 12:40:36 PM Received Date: 1/5/2022 12:40:00 PM From: Ballard, Brent
Created By: Brent.Ballard@nrc.gov
Recipients:
"Budock, George P:(Exelon Nuclear)" <George.Budock@exeloncorp.com>
Tracking Status: None "Pareez Golub" <pareez.e.golub@sargentlundy.com>
Tracking Status: None "Waters, Michael" <Michael.Waters@nrc.gov>
Tracking Status: None "Johnston, Jeanne" <jeanne.johnston@nrc.gov>
Tracking Status: None "Marshall, Michael" <Michael.Marshall@nrc.gov>
Tracking Status: None "Jain, Bhagwat" <Bhagwat.Jain@nrc.gov>
Tracking Status: None "Mascitelli, Francis J:(Exelon Nuclear)" <Francis.Mascitelli@exeloncorp.com>
Tracking Status: None
Post Office: BY5PR09MB4627.namprd09.prod.outlook.com
Files Size Date & Time MESSAGE 652 1/5/2022 12:40:00 PM 07DEC Public Meeting Feedback.docx 24555
Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
- 1. How 3 channels (2 out of 3 channel logic vs. 2 out of 4) meets all design requirements. The NRC staff agrees that the 2 of 3 condition represents a system that is capable of performing its safety functions however, there remains a question of whether a system in this state continues to meet all design requirements. In particular, the single failure criteria of IEEE 603 or IEEE 279 in conjunction with surveillance testing requirements does not appear to be satisfied with a system in this condition. Refer to IEEE 279 clause 4.11, During such operation the active parts of the system shall of themselves continue to meet the single failure criterion. Bullet 4 on slide 21 of Exelons December 7th presentation states:
Only three channels are needed to meet all design requirements for voted channels.
Please explain how a system in this state meets single failure criteria when a channel is out of service for surveillance testing purposes. Under the new TS, one channel can be removed for testing or otherwise be inoperable within entering an Action (as stated on 7 th bullet of slide 21).
- 2. Demonstrating three channels provides lowest functional capability of the system.
- a. In absence of a limiting condition for operability, operation of the system with only three functioning channels would need to demonstrate not only functional capability but would also have to show compliance with the performance criteria of IEEE 279 or IEEE 603 which include maintaining single failure criteria during periodic surveillance testing activities during which only two channels would remain operable. The NRC staff referred to several TS examples for plants with similar designs that include limiting conditions for operability that must be considered during the time in which the safety system is in a 2 of 3 logic condition. Though the LCO times vary significantly between plants, all of the example TSs include descriptions of conditions of operation that must be considered when the system is in a 2 of 3 configuration.
- b. Please provide a description using a staged approach to loss of protection channels, and associated example Action Statements for required actions to take in the event of a loss of one of the four channels, and then for a loss of two channels, and then for a loss of two or more of the four channels of the Plant Protection System. Describe the minimum number of channels that are required to be operable for each of the Modes of Operation. Demonstrate how the design meets the requirements of IEEE 603. For example, for operations with three operable channels, describe how the design requirements of IEEE 603 are still being met if one more channel becomes inoperable.
- 3. Reestablish basis for continued elimination of previously removed response times from the TS. The NRC staff pointed out that if the licensee wants to retain the existing exemption from time response testing provisions, they will need to review the bases for these exemptions. If the replacement system diagnostic functions are to be credited in lieu of the current calibration and functional test surveillance tests as described in the licensees presentation, then a new basis for these time response test exemptions may need to be established. If a basis for these exemptions is not reestablished in the LAR, then the TR test exemptions may become invalid and new test requirements would be needed.
Please discuss how the proposed relocation satisfies Criterion 2 and 3 of 10CFR 50.36(c)(2)(ii), which require an LCO to be included in the TSs:
Criterion 2-A process variable, design feature, or operating restriction that is an initial condition of a design basis accident (DBA) or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier; and Criterion 3 - A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a DBA or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
- 4. Please describe any potential impact on each ESFAS Actuation System LCOs/surveillance requirements and ECCS System-Level LCOs/surveillance requirements (i.e., RCIC, ECCS and NSSSS system) based on operability of the Plant Protection System. For example, what will be the limiting conditions for operation of HPCI, RCIC, ADS, Core Spray A, Core Spray B, NSSSS Isolation, etc. based on the operability condition of the Plant Protection System with one or more, and then two or more channels INOP?
- 5. Please describe any potential impact associated with the surveillance testing requirements for each of the Manual Initiation Functions at the system level for each subsystem of the ECCS/NSSSS systems. Which portions of the circuits for manual initiation are covered by these surveillance tests?