ML22160A411

From kanterella
Revision as of 20:15, 17 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Supplemental Information for R.E. Ginna Nuclear Power Plant to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2
ML22160A411
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/09/2022
From: David Gudger
Constellation Energy Generation, Exelon Generation Co LLC
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML22160A411 (4)


Text

200 Exelon Way Kennett Square, PA 19348

www.constellation.com

10 CFR 50.90

June 9, 2022

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555- 0001

R. E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244

Subject:

Supplemental Information for R.E. Ginna Nuclear Power Plant to Adopt TSTF-5 05, "Provide Risk-I nformed Extended Completion Times - RITSTF Initiative 4b," Revision 2

References:

1. Letter from D. Gudger (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "License Amendment Request to Revise Technical Specific ations to Adopt Risk-I nformed Completion Times TSTF-505, Revision 2, 'Provide Risk-I nformed Extended Completion Times -

RITSTF Initiative 4b,' " dated May 20, 2021 (ML2 1140A3 24)

2. Letter from D. Gudger (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, Supplemental Information No. 1 for R.E. Ginna Nuclear Power Plant to Adopt TSTF-5 05, "Provide Risk -Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 5 0.69,

'Risk-I nformed categoriz ation and treatment of structures, systems and components for nuclear power reactors.' " dated October 14, 2021 (ML21287A006)

This le tter is a supplement t o Reference 1. Exelon Generation Company, LLC ( Exelon) proposed an am endment to ch ange the R. E. Ginna Nuclear P ower P lant (Ginna) Tech nical Specification (TS). The proposed amendment would modify TS requirements to permit the use of Risk Informed Completion Times in accordance with TSTF-5 05, Revision 2, "Provide Risk-I nformed Extended Completion Times - RITSTF Initiative 4b," (ADAMS Ac cession No.

ML21140A 324). By l etter da ted October 14, 2021 ( Reference 2), Exel on provided supplemental informatio n to the proposed a mendment (Reference 1). Attachment 3 of Reference 2 provides a s uggest ed license condition. This letter provides clarification on t he proposed license condition and supersedes w hat w as p rovided in Attachment 3 o f Reference 2.

U.S. Nuclear Regulatory Comm ission Supplemental Information for TSTF-5 05 Docket No. 50-2 44 June 9, 2022 Page 2

Constellation Energy Generation, LLC (CEG) has reviewed the information supporting a finding of no significant hazards consideration and the environmental consideration provided to the NRC in Reference 1. The responses provided in this letter do not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. Furthermore, the re sponses provided in this l etter do not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.

CEG also requests ADAMS for immediate release marked as a publicly available document.

There are no commitments contained in this response.

In accordance with 10 CFR 50.91, " Notice for public comment; State consultation,"

paragraph (b), EGC is notifying the State of New York of this application for license amendment by transmitting a copy of this letter and its attachments to the designated State Official.

Should you have any questions concerning this letter, please contact Jessie Hodge at (610) 765-55 32.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 9 th day of June 2022.

Respectfully,

David T. Gudger Senior Manager - Licensing Constellation Energy Generation, LLC

Attachments: 1. License C ondition Information

cc: USNRC Region I, Regional Administrator w/ attachments USNRC Senior Resident Inspector, Ginna "

USNRC Project Manager, Ginna "

A. L. Peterson, NYSERDA "

ATTACHMENT 1

License Amendment Request

R. E. Ginna Nuclear Power Plant

Renewed Facility Operating License No. DPR-18

Docket No. 50- 244

License Condition Information Supplemental Attachment 1 Information for Page 1 of 1 TSTF-5 05 Docket No. 50-2 44

Constellation proposes the addition of the following condition to the renewed operating license of Ginna to document the NRCs approval of the use of Risk -Informed Completion Times TSTF 505, Revision 2, Provide Risk Informed Extended Completion Times RITSTF Initiative 4b

Constellation Energy Generation, LLC is approved to implement TSTF-505, Revision 2, modifying the Technical Specification requirements related to Completion Times (CT) for Required Actions to provide the option to calculate a longer, R isk-Informed CT (RICT). The methodology for using the new Risk-Informed Completion Time Program is described in NEI 06- 09-A, Risk -Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (RMTS) Guidelines, Revision 0, which was approved by the NRC on May 17, 2007.

Constellation Energy Generation, LLC will complete the implementation items listed in Attachment 6 of Exelon Letter to the NRC dated May 20, 2021, prior to implementation of the RICT Program. All issues identified in the attachment will be addressed and any associated changes will be made, focused-scope peer reviews will be performed on changes that are PRA upgrades as defined in the PRA standard (ASME/ANS RA-Sa-2009, as endorsed by RG 1.200, Revision 2), and any findings will be resolved and reflected in the PRA of record prior to the implementation of the RICT Program.