Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2
ML24243A087
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/20/2024
From: Stephen Koenick
NRC/NMSS/DREFS/EPMB1
To: Jennifer Davis
Environmental Protection Agency
References
Download: ML24243A087 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Jamie Davis Acting NEPA Branch Manager EJ, Community Health, and Environmental Review Division U.S. Environmental Protection Agency Region 3 Administrator Philadelphia, PA 19103

SUBJECT:

RESPONSE TO ENVIRONMENTAL PROTECTION AGENCY COMMENTS REGARDING THE FINAL SITE-SPECIFIC SUPPLEMENT 7a TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS REGARDING NORTH ANNA POWER STATION, UNITS 1 AND 2 (DOCKET NUMBERS: 50-338 AND 50-339)

Dear Jamie Davis:

On August 26, 2024, the U.S. Environmental Protection Agency (EPA), Region 3, (Agencywide Documents Access and Management System ML24247A007) provided comments to the final site-specific environmental impact statement pertaining to the license renewal of North Anna Power Station (North Anna), Units 1 and 2 (NUREG-1437, Supplement 7a). In that letter, EPA has one suggestion:

Due to the advance nature of the Study [the Final Environmental Impact Statement], the NRC continue to monitor conditions to ensure that no significant impacts result from the reissuance of the license.

Regarding the suggestion, the U.S. Nuclear Regulatory Commission (NRC)s regulatory process is a combination of licensing and oversight. The issued license and requirements specified within establish the operating parameters for the safe operation of the plant. The NRCs Reactor Oversight Process (ROP) is the program to inspect, measure, and assess the safety and security performance of operating commercial nuclear power plants, and to respond to any decline in their performance. The NRC will continue to implement the ROP to monitor conditions at North Anna to ensure it meets NRC requirements for operation and respond to any decline in performance ensuring no significant impacts result from the reissuance of the renewed licenses.

More information on the NRCs ROP can be found on the NRCs ROP webpage:

https://www.nrc.gov/reactors/operating/oversight/rop-description.html.September 20, 2024 J. Davis 2 Additionally, Dominion is responsible for complying with and adhering to all applicable Federal, State, and local environmental statutes and regulations, as well as applicable industry standards, in conducting its activities during the subsequent license renewal term.

Thank you for your comments. If further information is required, please contact the NRC environmental project manager, Tam Tran, by phone at 301-415-3617 or via email at tam.tran@nrc.gov.

Sincerely, Stephen S. Koenick, Chief Environmental Project Manager Branch 1 Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards Dockets Nos. 50-338 and 50-339 Signed by Koenick, Stephen on 09/20/24

ML24243A087*concurred via email OFFICE PM:REFS LA:REFS BC:REFS NAME TTran AWalker-Smith SKoenick NAME 8/29/24 9/4/24 9/20/24