ML24225A168

From kanterella
Revision as of 07:37, 4 October 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
– Notification of Inspection and Request
ML24225A168
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/16/2024
From: Louis Mckown
NRC/RGN-II/DRP/RPB5
To: Jim Barstow
Tennessee Valley Authority
References
Download: ML24225A168 (1)


Text

Jim Barstow Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 4A-C Chattanooga, TN 37402-2801

SUBJECT:

BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

Dear Jim Barstow:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Browns Ferry Nuclear Plant, Units 1,2, and 3 during the weeks of November 4 - 8, and November 18 - 22, 2024. The inspection team will be led by Kevin Pfeil, Resident Inspect at Browns Ferry Nuclear Plant. This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71152, Problem Identification and Resolution, issued on October 31, 2023.

The biennial PI&R inspection and assessment of the licensees Corrective Action Program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.

On August 8, 2024, Kevin Pfeil confirmed with member of your staff, William Webster, Browns Ferry team lead, arrangements for the two-week onsite inspection and the one-day pre-inspection visit.

The enclosure lists documents that will be needed prior to the inspection. Please, provide the referenced information no later than October 7, 2024; and contact Kevin Pfeil with any questions concerning the requested information. The inspectors have worked to minimize your administrative burden by specifically identifying documents necessary for inspection preparation.

If additional documents are required, they will be requested as needed. Prior to the onsite inspection, Kevin Pfeil will discuss with your staff inspection support administrative details including availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; working space; arrangements for site access; and other applicable information.August 16, 2024 J. Barstow 2 In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Kevin Pfeil at (518) 229-8021.

Sincerely, Louis J. McKown, II, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 05000259, 05000260, and 05000296 License Nos.: DPR-33, DPR-52, and DPR-68

Enclosure:

Information Request for Browns Ferry Nuclear Plant Problem Identification & Resolution Inspection cc: w/ Encl: via Listserv Signed by McKown, Louis on 08/16/24

J. Barstow 3

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

ML24225A168 X SUNSI Review X Non-Sensitive X Publicly Available Sensitive Non-Publicly Available

OFFICE RII/DRP RII/DRP NAME K. Pfeil L. McKown DATE 8/16/2024 8/16/2024 INFORMATION REQUEST FOR BROWNS FERRY NUCLEAR PLANT PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION November 4th-8th and November 18th-22nd

Note: Unless otherwise noted, the information requested below corresponds to documents generated since July 11, 2022. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.

1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to:

a) Corrective action process b) Cause evaluation c) Operability determination process d) Operating experience program e) 10 CFR Part 21 and programs for reporting defects and non-compliance f) Employee concerns program g) Self-assessment program h) Maintenance rule program and implementing procedures i) System health process or equivalent equipment reliability improvement programs j) Quality assurance program

If any of the procedures requested above were revised after August 8, please provide (or have available) copies of all revisions during the onsite inspection.

2. List of top ten risk significant systems, top ten risk significant components for each one of the top ten risk significant systems, and top ten risk significant operator manual actions; and a copy of the probabilistic risk assessment importance measures report, if available. Please provide by September 16, 2024.
3. List of all Condition Reports (CRs) initiated including the following information or each CR:

a) CR number b) Brief, but complete problem description c) Affected system d) Affected component e) Responsible plant department f) CR completion status g) CAQ characterization

Provide this list in a format compatible with spreadsheet software (example shown below) and ensure the list is searchable and can be filtered by system and organization.

CR # Subject Description System Component Org CAP/ Status Not CAP 02351551 A RHR Pump Should include initial description RHR 2-RHR-PMP-A ENG CAP APPROVED failed flow criteria section from NCR entry per SR 5.0.5.4

4. List of outstanding corrective actions including the following information for each action:

Enclosure a) Corrective action number b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc.)

c) Brief, but complete corrective action description d) Associated CR number e) Corrective action initiation date f) Number of extensions g) Corrective action due date h) Completion status

Provide this list in a format compatible with spreadsheet software (example shown below) and ensure the list is searchable and can be filtered by system and organization.

Corrective Type Description CR Initiation Extensions Due Status Action # Date Date AR0034 CAPR Revise CR0058 01/05/12 2 06/15/12 Awaiting Procedure CARB NGK-003-4585 review

5. List of control room deficiencies with a brief description and corresponding CR and/or work order (WO) number
6. List of operator workarounds and operator burdens with a brief description and corresponding CR number
7. List of all prompt operability determinations or other engineering evaluations to provide reasonable assurance of operability; if fewer than approximately 20, provide full CR package.
8. List of all CRs that have been voided, cancelled, or deleted. Please provide the following information for each CR:

a) CR number b) Brief, but complete problem description c) Affected system d) Responsible organization e) CAP characterization f) Reason voided, cancelled, or deleted

9. List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the Maintenance Rule. Please include the following information for each system in (a)(1):

a) Date of classification in (a)(1) b) Reason for being placed in (a)(1) c) Planned actions and their status d) Copy of evaluations

10. List of Maintenance Preventable Functional Failures (MPFF) of risk significant systems with actions completed and current status, and associated CR(s).

2

11. List of corrective and deficient maintenance WOs and WRs for safety-related (SR) structures, systems, and components and any condition considered a condition adverse to quality. Please include the following information for each:

a) WO number b) Brief, but complete work description c) Affected system and components d) Date of initiation e) Date of completion (if completed) f) Associated CR (if applicable) g) Priority h) Status (e.g., open/closed) i) CAQ characterization

Provide this list in a format compatible with spreadsheet software (example shown below) and ensure the list is searchable and can be filtered by system.

WR/WO # Description System Component Initiation Due Date CAQ Priority Status Date

WO01345 Replace breaker 2A-SI 2A-SI-PMP, 01/05/11 03/15/22 Yes 3 Closed BKR-08-BB4 BKR-08-BB4 for 2A SI Pump.

12. Corrective action closeout packages, including CRs with description of corrective actions, for all NRC findings and licensee-identified violations (LIVs). Include a cross reference linking NRC finding tracking numbers and LIVs to appropriate CR numbers.
13. Corrective action closeout packages, including CRs with description of corrective actions, for all licensee event reports (LERs) issued. Include a cross reference linking LER number to appropriate CR number.
14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.) and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.) evaluated by the site for applicability to the station, regardless of the determination of applicability. Include the reference number (e.g., CR number) for the documents that evaluated the associated OE information.
15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program.
16. Copies of all department self-assessments.
17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends.
18. If performed, provide all self-assessments of the site safety culture completed within the last two years.

3

19. Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods.
20. Contact information and availability during inspection period for Employee Concerns Program representative on site.
21. Copy of the latest CAP statistics (if exists) such as the number of CRs initiated by department, human performance errors by department, and others as may be available.
22. List of routine meetings and agendas involving the CAP (including but not limited to CAP screening, maintenance rule, operating experience, new work screening team, operations focus, management review, challenge, etc.,) to be held during the inspection period.
23. Five-year Review: List of CRs related to equipment aging issues in the top ten risk significant systems since November 2019 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.;

environmental qualification). Provide the following information for each CR, in a format compatible with spreadsheet software and ensure the list is sortable and searchable:

a) CR number b) CR problem description c) Affected system d) Affected component e) Responsible organization f) CAP characterization g) Status

24. List of all root cause, apparent cause, common cause and related or similar equipment cause evaluations with a brief description.
25. System health reports, system design basis documents, maintenance rule functions and status, and system description information for top ten risk significant systems OR upon notification of system selections.

4