|
---|
Category:E-Mail
MONTHYEARML24312A2422024-11-0707 November 2024 Restart La Docs - Palisades Scoping Posters ML24306A2222024-11-0101 November 2024 Restart La Docs - Palisades Reauthorization of Power Operations Environmental Review- Request for Confirmatory Information 2 ML24304A8572024-10-29029 October 2024 Draft Request for Additional Information: Palisades Operating Final Safety Analysis Report ML24295A3622024-10-21021 October 2024 Request for Additional Information Quality Assurance Program to Support License Transfer Request ML24289A1962024-10-10010 October 2024 Email Dated October 10, 2024 from Wallace Taylor Indicating His Intention to Refile ML24289A1952024-10-0909 October 2024 Follow-up Email Dated October 9, 2024 from the Office of the Secretary to Wallace Taylor Regarding the Filing Error ML24289A1942024-10-0808 October 2024 Email Dated October 8, 2024 from the Office of the Secretary to the Participants of the Palisades 50-255 & 72-007 LT-3 Proceeding Regarding Filing Error ML24289A1932024-10-0808 October 2024 Email Dated October 9, 2024 from the Office of the Secretary to Wallace Taylor Regarding Filing Error ML24277A3062024-10-0303 October 2024 Restart La Docs - 9-18-2024 Michigan SHPO Comments on Palisades Phase I Archaeological Survey ML24277A3032024-10-0303 October 2024 Restart La Docs - (External_Sender) Re Status Update - Palisades Request for Reauthorization of Power Operations ML24277A3042024-10-0303 October 2024 Restart La Docs - Sokaogon Chippewa Community Reply to NRC Status Update Re Palisades Restart ML24306A0662024-10-0303 October 2024 Email from Michael Laronge, Thpo, Sokaogon Chippewa Community Regarding Palisades Restart Project ML24277A3082024-10-0303 October 2024 Restart La Docs - 10-2-2024 Michigan SHPO Comments Re Palisades Nuclear Plant Architectural Survey ML24277A3072024-10-0202 October 2024 Restart La Docs - (External_Sender) ER24-431 Palisades Nuclear Plant Subsequent License Renewal, Covert Township, Van Buren County (NRC) ML24270A2622024-09-26026 September 2024 Email to Petitioners and Licensee Representatives Transmitting Order of the Secretary Re Petition for Declaratory Order from Beyond Nuclear Et Al., for the Palisades Nuclear Plant ML24269A0162024-09-24024 September 2024 Email from Holtec Decommissioning International, LLC Re Reply to Beyond Nuclear Et Al.S Petition for Declaratory Order ML24262A0742024-09-18018 September 2024 Restart La Docs - FW Palisades Scoping Comment Period Ended ...E-mail Capture Platform Status ML24262A0732024-09-18018 September 2024 Restart La Docs - FW Palisades Scoping Comment Period Ended ...E-mail Capture Platform Status ML24291A2442024-09-18018 September 2024 Response to Questions from Alan Blind Regarding Public Meeting on August 1, 2024 ML24277A3052024-09-18018 September 2024 Restart La Docs - (External_Sender) Sec. 106 Consultation - ER24-431, Palisades Phase I Archaeological Survey ML24260A3552024-09-16016 September 2024 Restart La Docs - Palisades Reauthorization of Power Operations- Environmental Audit RCI Responses ML24260A3542024-09-12012 September 2024 Restart La Docs - (External_Sender) Re Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A2622024-09-0404 September 2024 Restart La Docs - FW Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A0572024-09-0404 September 2024 Restart La Docs - Draft Letter in Support of Draft RAIs and Draft Environmental Regulatory Audit Plan ML24248A2612024-09-0404 September 2024 Restart La Docs - Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A0902024-08-28028 August 2024 Steam Generator Inspection Call ML24270A2712024-08-0707 August 2024 Public Comments for August 1, 2024, Public Outreach Meeting on Potential Palisades Nuclear Plant Restart ML24192A0012024-07-0606 July 2024 (E-Mail) Palisades Nuclear Plant - Plant - Draft Request for Additional Information: Palisades Operating TS License Amendment Request - June 6, 2024 ML24187A1332024-07-0505 July 2024 LTR-24-0069 Emailed Response Regarding Palisades Restart Project ML24192A1472024-06-28028 June 2024 Email - Palisades Nuclear Plant - Draft Request for Additional Information: Palisades Administrative TS License Amendment Request - June 28, 2024 ML24192A1672024-06-28028 June 2024 Restart - NRC Request for Additional Information - EP ORO Coordination - June 28, 2024 ML24248A0562024-06-27027 June 2024 Restart La Docs - Draft Letter in Support of Draft RAIs and Draft Environmental Regulatory Audit Plan ML24135A3542024-05-20020 May 2024 NRC Response to Jody Flynn of Michigan Regarding Statements Made About Holtec in the April 25, 2024 Peekskill Herald Article: Holtec Playing Fast and Loose with Taxpayers Money by Tina Volz-Bongar (Docket 50-255) ML24141A0862024-05-16016 May 2024 Notification of NRC Activities Regarding Palisades Restart ML24170A8812024-05-15015 May 2024 NRR E-mail Capture - Post Acceptance/Abeyance Process for the 10 CFR 2.206 Petition on Palisades Misuse of Decommissioning Trust Fund ML24032A2442024-02-0101 February 2024 OEDO-24-00011 - 10 CFR 2.206 Petition Holtec Misuse Decommissioning Fund- Email to Petitioner ML24005A1262024-01-0505 January 2024 Permanently Defueled Emergency Plan Implementation Notification ML23055A1532023-02-24024 February 2023 Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22343A2282022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML22343A1902022-12-0909 December 2022 Acceptance Review: Palisades Proposed Exemption from 10 CFR 140.11 (a)(4) – Primary and Secondary Liability Insurance ML22284A0502022-10-0707 October 2022 Acceptance Review: License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22227A0082022-08-12012 August 2022 Acceptance Review: Exemption Request from 10CFR50.47(b), 10 CFR 50.47(c)(2), and 10 CFR Part 50, Appendix E, Section IV ML22227A0092022-08-12012 August 2022 Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme (L-2022-LLA-0099) ML22179A0752022-06-28028 June 2022 E-mail from Entergy Dated June 28, 2022, Notification of Palisades and Big Rock Point License Transfer (EPIDs L-2022-LLM-0002 and L-2020-LLM-0003) ML22159A2672022-06-0202 June 2022 Answers to Your Questions on Palisades ML22159A2652022-05-0303 May 2022 Questions Asked at Palisades Plant Performance Public Meeting April 26, 2022 ML21328A0062021-11-18018 November 2021 NRR E-mail Capture - (External_Sender) State of Michigan Response - Palisades Nuclear Plant and Big Rock Point Plant - Application for Order Consenting to Transfers of Licenses and Conforming License Amendments ML22208A1052021-11-16016 November 2021 NRR E-mail Capture - (External_Sender) State of Michigan Response - Palisades - Preparation for Issuance of Final Environmental Assessment and Finding of No Significant Impact Holtec Exemption Request to Use Dtf ML21309A5152021-11-0505 November 2021 NRR E-mail Capture - Palisades Nuclear Plant - Preparation for Issuance of Final Environmental Assessment and Finding of No Significant Impact Holtec Exemption Request to Use Dtf 2024-09-04
[Table view] |
Text
From: Justin Poole (He/Him)
To: James Miksa; Amy Filbrandt
Subject:
Steam Generator Outage Call Date: Wednesday, August 28, 2024 2:09:00 PM
Jim/Amy,
Inservice inspections of steam generator tubes play a vital role in assuring SG tube integrity. A telephone conference call has been arranged with members of your staff to discuss the ongoing results of the steam generator tube inspections to be conducted during the upcoming inspection at Palisades Nuclear Plant. This call will occur after the majority of the tubes have been inspected, but before the steam generator inspection activities have been completed.
Below is a list of discussion points to facilitate this call.
The NRC staff will document a publicly available summary of the conference call, including any material that you provide to the NRC staff in support of the call.
Should you have any questions you can contact me.
Justin C. Poole Project Manager Palisades Restart NRR/DORL/LPL 3 U.S. Nuclear Regulatory Commission (301)415-2048
STEAM GENERATOR TUBE INSPECTION DISCUSSION POINTS
The following discussion points have been prepared to facilitate the conference call arranged with the licensee to discuss the results of the steam generator tube inspections to be conducted during the upcoming steam generator inspection. This conference call is scheduled to occur towards the end of the planned SG tube inspections, but before the unit completes the inspections and repairs.
The NRC staff plans to document a publicly available summary of the conference call, as well as any material that is provided in support of the call.
- 1. Discuss any trends in the amount of primary-to-secondary leakage observed during the most recently completed cycle.
- 2. Discuss whether any secondary side pressure tests were performed during the outage and the associated results.
- 3. Discuss any exceptions taken to the industry guidelines.
- 4. For each steam generator, provide a description of the inspections performed including the areas examined and the probes used (e.g., dents/dings, sleeves, expansion-transition, U-bends with a rotating probe), the scope of the inspection (e.g., 100% of dents/dings greater than 5 volts and a 20% sample between 2 and 5 volts), and the expansion criteria.
- 5. For each area examined (e.g., tube supports, dent/dings, sleeves, etc.), provide the following:
A summary of the number of indications identified to date for each degradation mode (e.g., number of circumferential primary water stress corrosion cracking indications at the expansion transition).
For the most significant indications in each area, provide an estimate of the severity of the indication (e.g., voltage, depth, and length of the indication), including whether tube integrity (structural and accident induced leakage integrity) was maintained during the previous operating cycle. In addition, discuss any analyses performed specifically for the most significant indications to demonstrate tube integrity.
- 6. Describe repair/plugging plans.
- 7. Describe in-situ pressure test and tube pull plans and results (as applicable and if available).
- 8. Discuss the following regarding loose parts:
The inspections performed to detect loose parts.
A description of any loose parts detected and their location within the SG (including the source or nature of the loose part, if known).
If the loose parts were removed from the SG.
Indications of tube damage associated with the loose parts.
- 9. Discuss the scope and results of any secondary side inspection and maintenance activities (e.g., in-bundle visual inspections, feedring inspections, sludge lancing, assessing deposit loading, etc.).
- 10. Discuss any unexpected or unusual results.
- 11. Provide the schedule for steam generator-related activities during the remainder of the current outage.
- 12. Discuss any actions taken or plans for obtaining water samples or deposit samples (e.g., sludge pile, tube scale, etc.) to evaluate potential detrimental chemistry conditions or contaminants (e.g., chlorides, sulfates, Pb) during the plant shutdown.