(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:Response to Request for Additional Information (RAI)
MONTHYEARML22080A2822022-03-21021 March 2022 Westinghouse, Response to NRC Request for Additional Information Associated with the SNM-1107 License Renewal Environmental Impact Statement ML22052A0122022-02-21021 February 2022 Response to NRC Request for Additional Information Associated with the SNM-1107 License Renewal Environmental Impact Statement ML21102A0692021-04-0606 April 2021 Westinghouse Columbia Fuel Fabrication Facility License Renewal Environmental Commitments ML21141A1522021-03-24024 March 2021 RAI-31 - Actual CO2e Emissions Calculations ML21141A1512021-03-24024 March 2021 Clarification Needs-Westinghouse Lr EIS-WEC Response ML20353A2922020-12-18018 December 2020 Enclosure 15 - Response to Request for Additional Information LTR-RAC-18-81 Hf Spiking Station 2 Summary Westinghouse Nuclear Fuel Facility Hopkins, Sc ML20353A2912020-12-18018 December 2020 Enclosure 14 - Response to Request for Additional Information - Monthly Discharge Monitoring Reports ML20353A2932020-12-18018 December 2020 Enclosure 16 - Response to Request for Additional Information - Soil & Materials Engineers, Inc., 1982, Ground-Water Hydrology of the Westinghouse Electric Corporation Plant, Richland County, South Carolina: Report No. H-8119, March 1, 1982 ML20353A2902020-12-18018 December 2020 Enclosure 13 - Response to Request for Additional Information - LTR-RAC-19-64, Manifests for Hfss 2 Soil Remediation ML20353A2892020-12-18018 December 2020 Enclosure 12 - Response to Request for Additional Information - DHEC Response to Hf Spiking Station 2 Assessment Report ML20353A2872020-12-18018 December 2020 Enclosure 10 - Response to Request for Additional Information - Sum of Fractions of Isotopic Uranium in Soil Beneath Sea-Land Containers Figures ML20353A2972020-12-18018 December 2020 Enclosre 20 - Response to Request for Additional Information - May 2019 Air Permit Renewal Application Table 4 - Emission Calculations for Scrubber ML20353A3242020-12-18018 December 2020 Enclosure 21 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Appendix 2.E ML20353A3272020-12-18018 December 2020 Enclosure 24 - Site CSM Cross Sections, 2.5X Vertical Exaggeration and 15X Vertical Exaggeration, Conceptual Site Model Rev. 1a ML20353A3282020-12-18018 December 2020 Enclosure 25 - Response to Request for Additional Information, Boring Logs ML20353A3342020-12-18018 December 2020 Enclosure 27 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Section 2 ML20353A3352020-12-18018 December 2020 Enclosure 28 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Section 6 ML20353A2812020-12-18018 December 2020 Enclosure 5 - Response to Request for Additional Information - RAF-104-5, Environmental Protection Guidelines and Checklist ML20353A3292020-12-18018 December 2020 Enclosure 26 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Section 5 ML20353A2822020-12-18018 December 2020 Enclosure 6 - Response to Request for Additional Information - TAF-500-11, 10 CFR 70.72 Engineering Pre-screening Checklist ML20353A2882020-12-18018 December 2020 Enclosure 11 - Response to Request for Additional Information - RA-433, Environmental Remediation ML20353A2862020-12-18018 December 2020 Enclosure 9 - Response to Request for Additional Information - Table 6 - Industrial Incinerator; Emission Calculations for Metals, Acid Gases, and Dioxin/Furans ML20353A2842020-12-18018 December 2020 Enclosure 8 - Response to Request for Additional Information - Table 2 - Emission Calculations for Industrial Incinerator ML20353A2942020-12-18018 December 2020 Enclosure 17 - Response to Request for Additional Information - 2018/2019 Annual Groundwater Report ML20353A2772020-12-18018 December 2020 Enclosure 1 - Response to Request for Additional Information Re Environmental Review for the Proposed Renewal of the Westinghouse Columbia Fuel Fabrication Facility License ML20353A2782020-12-18018 December 2020 Enclosure 2 - Response to Request for Additional Information - March 2019 Environmental Report Updates ML20353A2832020-12-18018 December 2020 Enclosure 7 - Response to Request for Additional Information - Facility Wide Criteria and Tap Model ML20353A2962020-12-18018 December 2020 Enclosure 19 - Response to Request for Additional Information - Preliminary Human Health Risk Assessment Westinghouse Columbia Fuel Fabrication Facility 5801 Bluff Road Hopkins South Carolina ML20353A2802020-12-18018 December 2020 Enclosure 4 - Response to Request for Additional Information - Phase II Remedial Investigation Work Plan ML20353A2792020-12-18018 December 2020 Enclosure 3 - Response to Request for Additional Information - Cww Well Permit and Approval ML20317A1912020-11-12012 November 2020 Westinghouse Response to Request for Additional Information Schedule- Environmental Review for the Proposed Renewal of the Westinghouse Columbia Fuel Fabrication Facility License (Enterprise Project Identifier L-201-RNW-0016) ML20287A5462020-10-12012 October 2020 Westinghouse - Response to Request for Additional Information Request for Alternate Disposal Approval and Exemption for Specific Columbia Fuel Fabrication Facility Waste ML20266G5522020-09-22022 September 2020 Attachment 1 - Response to Request for Additional Information Request for Alternate Disposal Approval and Exemption for Specific Columbia Fuel Fabrication Facility Waste ML20266G5512020-09-22022 September 2020 Westinghouse Electric Company, LLC - Response to Request for Additional Information - Alternate Disposal Approval and Exemptions for Specific Columbia Fuel Fabrication Facility Waste ML20063P3272020-02-29029 February 2020 Interim Remedial Investigation Data Summary Report Westinghouse Columbia Fuel Fabrication Facility ML18257A0622018-09-13013 September 2018 Response to Request for Additional Information Westinghouse Electric Company WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement. ML18144A9942018-05-24024 May 2018 Westinghouse Electric Company, LLC - Response to Request for Additional Information Regarding Application for NRC Consent to License Transfer (EPID L-2018-LLM-0001) ML18005A5362018-01-0505 January 2018 Westinghouse - Response to Request for Additional Information (TAC # L33317)re License Renewal Application for Columbia Fuel Fabrication Facility 2022-03-21
[Table view] |
Text
WESTINGHOUSE NON-PROPRIETARY CLASS 3 to LTR-RAC-20-94 Date: December 18, 2020 Enclosure 8 Response to Request for Additional Information Table 2 - Emission Calculations for Industrial Incinerator
Table 2 - Emission Calculations for Industrial Incinerator Westinghouse Electric Company LLC Hopkins, South Carolina prepared by GEL Engineering, LLC May 30, 2019 A B C D E F AP-42 Emission Factor for Industrial /
Maximum Annual Commercial Multiple Waste Charge Rate Throughput Chamber Combuster Control Efficiency Hourly Emissions Annual Emissions Source (tons/hr) (tons/year) Pollutant (lbs/ton)1 (%)3 (lbs/hr)4 (tons/yr)4 Industrial Incinerator 0.25 2,190 PM 7.00 50 0.88 3.83 2
PM10 7.00 50 0.88 3.83 PM2.52 7.00 50 0.88 3.83 SO2 2.50 0.63 2.74 CO 10.0 2.50 10.95 NOx 3.00 0.75 3.29 VOCs 3.00 0.75 3.29 Footnotes:
1 Emission factors from AP-42 Chapter 2.1, Refuse Combustion, Table 2.1-12, Uncontrolled Emission Factors for Refuse Combusters, Industrial/Commercial Multiple Chamber Combuster.
2 As AP-42 provides no speciated PM emission factors, it is conservatively assumed that PM10 and PM2.5 are equivalent to PM.
3 The incinerator is equipped with inherent radiological controls for the purpose for recovering uranic materials. These controls include HEPA filtration prior to discharge to the atmosphere. It is conservatively assumed that these inherent radiological controls will reduce PM emissions by 50 percent.
4 These are preliminary emission estimates based on best available data from AP-42. The renewed permit will include a "test and set" condition for the Industrial Incinerator.
Example Calculation: tons throughput lbs emissions lbs emissions A hour x C ton throughput x (100% - D%)/100% = E hour tons throughput lbs emissions 1 ton B year x C ton throughput x (100% - D%)/100% x 2000 lbs tons emissions
= F year