Category:Response to Request for Additional Information (RAI)
MONTHYEARML23011A3382022-09-30030 September 2022 Westinghouse, Supplemental Response to NRC RAI A-RCS1 (Redacted Version of ML22256A287) ML22186A0552022-06-30030 June 2022 Westinghouse, Responses to the Nrc'S Request for Additional Information ML22080A2822022-03-21021 March 2022 Westinghouse, Response to NRC Request for Additional Information Associated with the SNM-1107 License Renewal Environmental Impact Statement ML22052A0122022-02-21021 February 2022 Response to NRC Request for Additional Information Associated with the SNM-1107 License Renewal Environmental Impact Statement ML21102A0692021-04-0606 April 2021 Westinghouse Columbia Fuel Fabrication Facility License Renewal Environmental Commitments ML21090A2062021-03-31031 March 2021 Attachments to Westinghouse'S Responses to the Nrc'S Request for Supplemental Information (Rsis) and Observations (Obss) (Non-Proprietary) ML21090A2032021-03-30030 March 2021 Enclosure 1: Westinghouse'S Responses to the Nrc'S Request for Supplemental Information (Rsis) and Observations (Obss) ML21141A1522021-03-24024 March 2021 RAI-31 - Actual CO2e Emissions Calculations ML21141A1512021-03-24024 March 2021 Clarification Needs-Westinghouse Lr EIS-WEC Response ML21081A0252021-03-19019 March 2021 Enclosure 1 - Supplemental Information to Support the AP1000 Design Certification Extension (Non-Proprietary) ML21019A5122021-01-31031 January 2021 Enclosure 3 - Westinghouse Response to NRC Observation 3-3 (Non-Proprietary) CNL-21-014, Response to Request for Additional Information for Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for the Watts Bar Nuclear Plant, Unit 2 Steam Generators (WBN TS-391-20-024)2021-01-19019 January 2021 Response to Request for Additional Information for Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for the Watts Bar Nuclear Plant, Unit 2 Steam Generators (WBN TS-391-20-024) ML20353A2942020-12-18018 December 2020 Enclosure 17 - Response to Request for Additional Information - 2018/2019 Annual Groundwater Report ML20353A2772020-12-18018 December 2020 Enclosure 1 - Response to Request for Additional Information Re Environmental Review for the Proposed Renewal of the Westinghouse Columbia Fuel Fabrication Facility License ML20353A3342020-12-18018 December 2020 Enclosure 27 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Section 2 ML20353A2882020-12-18018 December 2020 Enclosure 11 - Response to Request for Additional Information - RA-433, Environmental Remediation ML20353A2812020-12-18018 December 2020 Enclosure 5 - Response to Request for Additional Information - RAF-104-5, Environmental Protection Guidelines and Checklist ML20353A2782020-12-18018 December 2020 Enclosure 2 - Response to Request for Additional Information - March 2019 Environmental Report Updates ML20353A2822020-12-18018 December 2020 Enclosure 6 - Response to Request for Additional Information - TAF-500-11, 10 CFR 70.72 Engineering Pre-screening Checklist ML20353A3292020-12-18018 December 2020 Enclosure 26 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Section 5 ML20353A2962020-12-18018 December 2020 Enclosure 19 - Response to Request for Additional Information - Preliminary Human Health Risk Assessment Westinghouse Columbia Fuel Fabrication Facility 5801 Bluff Road Hopkins South Carolina ML20353A2802020-12-18018 December 2020 Enclosure 4 - Response to Request for Additional Information - Phase II Remedial Investigation Work Plan ML20353A3352020-12-18018 December 2020 Enclosure 28 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Section 6 ML20353A3282020-12-18018 December 2020 Enclosure 25 - Response to Request for Additional Information, Boring Logs ML20353A2792020-12-18018 December 2020 Enclosure 3 - Response to Request for Additional Information - Cww Well Permit and Approval ML20353A2832020-12-18018 December 2020 Enclosure 7 - Response to Request for Additional Information - Facility Wide Criteria and Tap Model ML20353A2842020-12-18018 December 2020 Enclosure 8 - Response to Request for Additional Information - Table 2 - Emission Calculations for Industrial Incinerator ML20353A2862020-12-18018 December 2020 Enclosure 9 - Response to Request for Additional Information - Table 6 - Industrial Incinerator; Emission Calculations for Metals, Acid Gases, and Dioxin/Furans ML20353A2872020-12-18018 December 2020 Enclosure 10 - Response to Request for Additional Information - Sum of Fractions of Isotopic Uranium in Soil Beneath Sea-Land Containers Figures ML20353A2892020-12-18018 December 2020 Enclosure 12 - Response to Request for Additional Information - DHEC Response to Hf Spiking Station 2 Assessment Report ML20353A2902020-12-18018 December 2020 Enclosure 13 - Response to Request for Additional Information - LTR-RAC-19-64, Manifests for Hfss 2 Soil Remediation ML20353A2912020-12-18018 December 2020 Enclosure 14 - Response to Request for Additional Information - Monthly Discharge Monitoring Reports ML20353A2922020-12-18018 December 2020 Enclosure 15 - Response to Request for Additional Information LTR-RAC-18-81 Hf Spiking Station 2 Summary Westinghouse Nuclear Fuel Facility Hopkins, Sc ML20353A2932020-12-18018 December 2020 Enclosure 16 - Response to Request for Additional Information - Soil & Materials Engineers, Inc., 1982, Ground-Water Hydrology of the Westinghouse Electric Corporation Plant, Richland County, South Carolina: Report No. H-8119, March 1, 1982 ML20353A2972020-12-18018 December 2020 Enclosre 20 - Response to Request for Additional Information - May 2019 Air Permit Renewal Application Table 4 - Emission Calculations for Scrubber ML20353A3242020-12-18018 December 2020 Enclosure 21 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Appendix 2.E ML20353A3272020-12-18018 December 2020 Enclosure 24 - Site CSM Cross Sections, 2.5X Vertical Exaggeration and 15X Vertical Exaggeration, Conceptual Site Model Rev. 1a ML20329A0832020-11-20020 November 2020 Westinghouse Electric Company - Updated Responses to Request for Supplemental Information 5-1 for the Application for the Sentry Dry Storage Cask System (Certificate of Compliance (CoC) No. 72-1026; Proposed Amendment 5) ML20317A1912020-11-12012 November 2020 Westinghouse Response to Request for Additional Information Schedule- Environmental Review for the Proposed Renewal of the Westinghouse Columbia Fuel Fabrication Facility License (Enterprise Project Identifier L-201-RNW-0016) ML20287A5462020-10-12012 October 2020 Westinghouse - Response to Request for Additional Information Request for Alternate Disposal Approval and Exemption for Specific Columbia Fuel Fabrication Facility Waste ML20276A2972020-10-0202 October 2020 Westinghouse'S Responses to the Nrc'S Requests for Supplement Information (Rsis) and Observations (Obss) (Non-Proprietary) ML20266G5512020-09-22022 September 2020 Westinghouse Electric Company, LLC - Response to Request for Additional Information - Alternate Disposal Approval and Exemptions for Specific Columbia Fuel Fabrication Facility Waste ML20266G5522020-09-22022 September 2020 Attachment 1 - Response to Request for Additional Information Request for Alternate Disposal Approval and Exemption for Specific Columbia Fuel Fabrication Facility Waste TSTF-19-14, Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements2020-02-12012 February 2020 Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements ML19070A1162019-03-0505 March 2019 Westinghouse, Responses to NRC Request for Additional Information Documented in ADAMS Accession No. ML 18270A094 on the Core Design and Safety Analyses Methodology Transition Program 2022-09-30
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
WESTINGHOUSE NON-PROPRIETARY CLASS 3 2 to LTR-RAC-20-94 Date: December 18, 2020 Enclosure 12 Response to Request for Additional Information DHEC Response to HF Spiking Station #2 Assessment Report
Healthy People. Healthy Communities.
March 7, 2019 Ms. Diana P. Joyner Principal Environmental Engineer Environmental, Health & Safety Operations Columbia Fuel Fabrication Facility 5801 Bluff Road Hopkins, SC 29061 Re : Response to HF Spiking Station #2 Assessment Report Westinghouse Electric/Columbia Plant HF Spiking Station #2 Assessment Report received on November 30 , 2018 Richland County File# 51377
Dear Ms. Joyner,
The South Carolina Department of Health and Environmental Control (Department) has reviewed the referenced assessment report. The following comments were generated from this review:
- 1. The disposal soil manifest needs to be submitted to the Department once the task it completed.
- 2. Based on the March 7, 2019 meeting, the Department approves the backfilling of the excavated area with Flow-fill.
Please submit the manifest once the soil is properly disposed of. Please feel free to contact me with any questlons or comments at (803) 898-0722 or at kuhnkm@dhec.sc.gov.
Sincerely,
~ ~- - -
Kimberly M. Kuhn, Project Manager State Voluntary State Cleanup Program Site Assessment, Remediation & Revitalization Division Bureau of Land and Waste Management Cc: Lucas Berresford, BLWM Ken Taylor, BLWM Veronica Barringer, Midlands EA Office Chuck Suddeth, P.G., AECOM, 101 Research Drive, Columbia , SC 29203 Jeremy Grant, AECOM, 101 Research Drive , Columbia, SC 29203 File #51377 S.C. Department of Health and Environmental Control 2600 Bull Street Columbia. SC 29201 (803) 898-3432 www.scdhec.gov