ML20353A327
From kanterella
Jump to navigation
Jump to search
ML20353A327 | |
Person / Time | |
---|---|
Site: | Westinghouse |
Issue date: | 12/18/2020 |
From: | Westinghouse |
To: | Office of Nuclear Material Safety and Safeguards |
Shared Package | |
ML20353A275 | List:
|
References | |
LTR-RAC-20-94, EPID L-201-RNW-0016 | |
Download: ML20353A327 (1) | |
Similar Documents at Westinghouse | |
---|---|
Category:Drawing
MONTHYEARML21336A1362021-12-0707 December 2021
[Table view]Ltr. to Mr. Russell Townsend, Thps; Eastern Band of Cherokee Indians; Re., Section 106 Consultation of the National Historic Preservation Act Regarding the Proposed License Renewal ML20353A3272020-12-18018 December 2020 Enclosure 24 - Site CSM Cross Sections, 2.5X Vertical Exaggeration and 15X Vertical Exaggeration, Conceptual Site Model Rev. 1a ML20294A0562020-07-30030 July 2020 Westinghouse Columbia Fuel Fabrication Facility Hf Spiking Station 1 Assessment Report 2021-12-07 Category:Response to Request for Additional Information (RAI) MONTHYEARML22080A2822022-03-21021 March 2022
[Table view]Westinghouse, Response to NRC Request for Additional Information Associated with the SNM-1107 License Renewal Environmental Impact Statement ML22074A1292022-03-15015 March 2022 Westinghouse - Response to NRC Request for Additional Information Associated with the SNM-1107 License Renewal Environmental Impact Statement ML22052A0122022-02-21021 February 2022 Response to NRC Request for Additional Information Associated with the SNM-1107 License Renewal Environmental Impact Statement ML21102A0692021-04-0606 April 2021 Westinghouse Columbia Fuel Fabrication Facility License Renewal Environmental Commitments ML21141A1522021-03-24024 March 2021 RAI-31 - Actual CO2e Emissions Calculations ML21141A1512021-03-24024 March 2021 Clarification Needs-Westinghouse Lr EIS-WEC Response ML20353A2782020-12-18018 December 2020 Enclosure 2 - Response to Request for Additional Information - March 2019 Environmental Report Updates ML20353A2792020-12-18018 December 2020 Enclosure 3 - Response to Request for Additional Information - Cww Well Permit and Approval ML20353A2832020-12-18018 December 2020 Enclosure 7 - Response to Request for Additional Information - Facility Wide Criteria and Tap Model ML20353A2842020-12-18018 December 2020 Enclosure 8 - Response to Request for Additional Information - Table 2 - Emission Calculations for Industrial Incinerator ML20353A2862020-12-18018 December 2020 Enclosure 9 - Response to Request for Additional Information - Table 6 - Industrial Incinerator; Emission Calculations for Metals, Acid Gases, and Dioxin/Furans ML20353A2872020-12-18018 December 2020 Enclosure 10 - Response to Request for Additional Information - Sum of Fractions of Isotopic Uranium in Soil Beneath Sea-Land Containers Figures ML20353A2892020-12-18018 December 2020 Enclosure 12 - Response to Request for Additional Information - DHEC Response to Hf Spiking Station 2 Assessment Report ML20353A2902020-12-18018 December 2020 Enclosure 13 - Response to Request for Additional Information - LTR-RAC-19-64, Manifests for Hfss 2 Soil Remediation ML20353A2912020-12-18018 December 2020 Enclosure 14 - Response to Request for Additional Information - Monthly Discharge Monitoring Reports ML20353A2922020-12-18018 December 2020 Enclosure 15 - Response to Request for Additional Information LTR-RAC-18-81 Hf Spiking Station 2 Summary Westinghouse Nuclear Fuel Facility Hopkins, Sc ML20353A2932020-12-18018 December 2020 Enclosure 16 - Response to Request for Additional Information - Soil & Materials Engineers, Inc., 1982, Ground-Water Hydrology of the Westinghouse Electric Corporation Plant, Richland County, South Carolina: Report No. H-8119, March 1, 1982 ML20353A2972020-12-18018 December 2020 Enclosre 20 - Response to Request for Additional Information - May 2019 Air Permit Renewal Application Table 4 - Emission Calculations for Scrubber ML20353A3242020-12-18018 December 2020 Enclosure 21 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Appendix 2.E ML20353A3272020-12-18018 December 2020 Enclosure 24 - Site CSM Cross Sections, 2.5X Vertical Exaggeration and 15X Vertical Exaggeration, Conceptual Site Model Rev. 1a ML20353A3282020-12-18018 December 2020 Enclosure 25 - Response to Request for Additional Information, Boring Logs ML20353A3352020-12-18018 December 2020 Enclosure 28 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Section 6 ML20353A2962020-12-18018 December 2020 Enclosure 19 - Response to Request for Additional Information - Preliminary Human Health Risk Assessment Westinghouse Columbia Fuel Fabrication Facility 5801 Bluff Road Hopkins South Carolina ML20353A2802020-12-18018 December 2020 Enclosure 4 - Response to Request for Additional Information - Phase II Remedial Investigation Work Plan ML20353A2772020-12-18018 December 2020 Enclosure 1 - Response to Request for Additional Information Re Environmental Review for the Proposed Renewal of the Westinghouse Columbia Fuel Fabrication Facility License ML20353A2942020-12-18018 December 2020 Enclosure 17 - Response to Request for Additional Information - 2018/2019 Annual Groundwater Report ML20353A2882020-12-18018 December 2020 Enclosure 11 - Response to Request for Additional Information - RA-433, Environmental Remediation ML20353A2812020-12-18018 December 2020 Enclosure 5 - Response to Request for Additional Information - RAF-104-5, Environmental Protection Guidelines and Checklist ML20353A2822020-12-18018 December 2020 Enclosure 6 - Response to Request for Additional Information - TAF-500-11, 10 CFR 70.72 Engineering Pre-screening Checklist ML20353A3292020-12-18018 December 2020 Enclosure 26 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Section 5 ML20353A3342020-12-18018 December 2020 Enclosure 27 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Section 2 ML20317A1912020-11-12012 November 2020 Westinghouse Response to Request for Additional Information Schedule- Environmental Review for the Proposed Renewal of the Westinghouse Columbia Fuel Fabrication Facility License (Enterprise Project Identifier L-201-RNW-0016) ML20287A5462020-10-12012 October 2020 Westinghouse - Response to Request for Additional Information Request for Alternate Disposal Approval and Exemption for Specific Columbia Fuel Fabrication Facility Waste ML20266G5522020-09-22022 September 2020 Attachment 1 - Response to Request for Additional Information Request for Alternate Disposal Approval and Exemption for Specific Columbia Fuel Fabrication Facility Waste ML20266G5512020-09-22022 September 2020 Westinghouse Electric Company, LLC - Response to Request for Additional Information - Alternate Disposal Approval and Exemptions for Specific Columbia Fuel Fabrication Facility Waste ML20063P3272020-02-29029 February 2020 Interim Remedial Investigation Data Summary Report Westinghouse Columbia Fuel Fabrication Facility ML18257A0622018-09-13013 September 2018 Response to Request for Additional Information Westinghouse Electric Company WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement. ML18144A9942018-05-24024 May 2018 Westinghouse Electric Company, LLC - Response to Request for Additional Information Regarding Application for NRC Consent to License Transfer (EPID L-2018-LLM-0001) ML18005A5362018-01-0505 January 2018 Westinghouse - Response to Request for Additional Information (TAC # L33317)re License Renewal Application for Columbia Fuel Fabrication Facility 2022-03-21 |
Text
Site CSM Cross Sections 2.5X Vertical Exaggeration 15X Vertical Exaggeration Wells up to 75' away from the transect are projected onto the cross sections.
Wells that are >20 ft and less than 75 ft are indicated with an asterisk (*).
Conceptual Site Model Rev. 1a
Retrieved from "https://kanterella.com/w/index.php?title=ML20353A327&oldid=3598491"