ML20266G551
Letter Sequence Response to RAI | |
---|---|
EPID:L-2020-LLL-0009, Enclosure 1 - Columbia Fuel Fabrication Facility Evaluation in Support of 10 CFR 20.2003 Request for Alternate Waste Disposal (Approved, Closed) | |
Initiation Administration | |
MONTHYEARML20129J9362020-05-0808 May 2020
[Table View]Enclosure 1 - Columbia Fuel Fabrication Facility Evaluation in Support of 10 CFR 20.2003 Request for Alternate Waste Disposal Project stage: Request ML20129J9352020-05-0808 May 2020 Request for Alternate Disposal Approval and Exemptions for Specific Columbia Fuel Fabrication Facility Waste Project stage: Request ML20170A5492020-06-25025 June 2020 Letter to E/Malek: Acceptance for Review of Request for Alternate Disposal Approval of Specified Low-Activity Radioactive Materials Project stage: Acceptance Review ML20230A0202020-09-0404 September 2020 Letter to E. Malek: RAI - WEC Request for Alternate Disposal Approval of Specified Low-Activity Radioactive Materials Project stage: RAI ML20254A1622020-09-11011 September 2020 Summary of the September 1, 2020 Closed Meeting with Westinghouse to Discuss Staff'S Draft RAIs on Alternate Disposal Approval of Specified Low Activity Radioactive Materials Project stage: Draft RAI ML20266G5512020-09-22022 September 2020 Westinghouse Electric Company, LLC - Response to Request for Additional Information - Alternate Disposal Approval and Exemptions for Specific Columbia Fuel Fabrication Facility Waste Project stage: Response to RAI ML20287A5452020-10-13013 October 2020 Westinghouse - Submittal of Response to Request for Additional Information - Alternate Disposal Approval and Exemptions for Specific Columbia Fuel Fabrication Facility Project stage: Response to RAI ML20329A3532020-11-30030 November 2020 Safety Evaluation Report Related to a Request for 10 CFR 20.2002 Alternate Disposal Approval and Exemptions from 10 CFR Part 30 and 10 CFR Part 70 for Disposal of Columbia Fuel Fabrication Facility Waste at the Us Ecology Idaho Facility Project stage: Approval ML20329A3522020-11-30030 November 2020 Safety Evaluation Report Related to a Request for 10 CFR 20.2002 Alternate Disposal Approval and Exemptions from 10 CFR Part 30 and 10 CFR Part 70 for Disposal of Columbia Fuel Fabrication Facility Waste at the Us Ecology Idaho Facility Project stage: Request ML20302A0852020-11-30030 November 2020 Enclosure-Safety Evaluation Report Related to a Request for 10 CFR 20.2002 Alternate Disposal Approval and Exemptions from 10 CFR Part 30 and 10 CFR Part 70 for Disposal of Columbia Fuel Fabrication Facility Waste at the Us Ecology Idaho Fa Project stage: Approval ML20302A0842020-12-0909 December 2020 Westinhouse Electric Company, LLC - Amendment 25 to Material License SNM-1107, Exemption for Alternate Disposal of Specific Waste (Enterprise Project Identifier L-2020-LLL-0009) Project stage: Other 2020-05-08 |
ML20266G551 | |
Person / Time | |
---|---|
Site: | Westinghouse |
Issue date: | 09/22/2020 |
From: | Malek E Westinghouse |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
Shared Package | |
ML20266G550 | List: |
References | |
LTR-RAC-20-74 | |
Download: ML20266G551 (2) | |
Similar Documents at Westinghouse | |
---|---|
Category:Letter
MONTHYEARML24289A0062024-10-21021 October 2024
[Table view]Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2024003 ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24228A2952024-08-15015 August 2024 Westinghouse Electric Company, LLC - NRC Semi-Annual Discharge Report (Jan - June 2024) ML24176A2762024-06-24024 June 2024 Westinghouse Electric Company LLC, Submittal of Slides for the June 27, 2024, Partially Closed Meeting with NRC Staff on the Designation of Buildings as Items Relied on for Safety ML24173A2992024-06-24024 June 2024 Westinghouse Columbia Fuel Fabrication Facility – Inspection Schedule for Calendar Year 2025 ML24138A1152024-05-21021 May 2024 Cover Letter - the U.S. Nuclear Regulatory Commission Approval Letter for Westinghouse Emergency Plan Change Request for Columbia Fuel Fabrication Facility ML24134A2742024-05-13013 May 2024 Submittal of Slide Packages for the May 16, 2024 Pre-Application Meeting with NRC on the Proposed License Amendment Request Re Low Enriched Uranium Plus Expansion at Columbia Fuel Fabrication Facility ML24128A2662024-05-13013 May 2024 Notification of New Licensing Project Manager for Westinghouses SNM-1151 for the Columbia Fuel Fabrication Facility ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24110A0502024-04-22022 April 2024 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2024001 ML24109A0002024-04-19019 April 2024 Public Meeting Summary - Licensee Performance Review for Westinghouse Columbia Fuel Fabrication Facility, Docket Number 70-1151 ML24110A1442024-04-19019 April 2024 Response to Request for Additional Information - Westinghouse Request for Prior Approval of Revision 24 of the Columbia Fuel Fabrication Facility (CFFF) Site Emergency Plan ML24080A5072024-03-20020 March 2024 Westinghouse, Request for Prior Approval of Revision 24 of the Columbia Fuel Fabrication Facility (CFFF) Site Emergency Plan ML24074A2962024-03-19019 March 2024 Cover Letter for WEC Correction to Amendment 3 ML24064A2542024-03-0707 March 2024 Westinghouse Electric Company, Licensee Performance Review of Licensed Activities - Nuclear Regulatory Commission Inspection Report No 70-1151/2024-005 ML24025A1292024-02-23023 February 2024 Westinghouse Electric Company, LLC, - Amendment 2, Request for Exemption from 24-Hour Reporting Requirement of Title 10 of the Code of Federal Regulations Paragraph 70.50(B)(1) ML24023A6952024-01-26026 January 2024 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 07001151/2023004 ML24026A1512024-01-25025 January 2024 Westinghouse Electric Company, LLC, Notice of Intent to Fabricate Low Enriched Uranium (Leu+) ML24017A2252024-01-22022 January 2024 Westinghouse Electric Company, LLC, Conveyance of Revised Standby Trust Agreement to Support the Decommissioning Funding Plan (Enterprise Project Identifier L-2023-DFA-0009) ML23349A2722023-12-14014 December 2023 Westinghouse, Submittal of Monthly Progress Reports Under Consent Agreement 19-02-HW with the South Carolina Department of Health and Environmental Control ML23338A3372023-12-0404 December 2023 Submittal of Amendment 4 to Standby Trust Agreement (STA) for License Nu. SNM-1107, Replacement of Trust Fund with Additional Surety Bonds, and Certification of Financial Assurance for SNM-1107 ML23311A0032023-11-0606 November 2023 Westinghouse Columbia Fuel Fabrication Facility, U.S. Nuclear Regulatory Commission Inspection Report Number 70-1151/2023-402 (Cover Letter) ML23296A0362023-10-24024 October 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023003 ML23240A5082023-08-28028 August 2023 Westinghouse Electric Company LLC - NRC Semi-Annual Discharge Report (January- June 2023) ML23230B2022023-08-18018 August 2023 Westinghouse, Supplemental Information for Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23216A0712023-08-0404 August 2023 Westinghouse Columbia Fuel Fabrication Facility Physical Security Core Inspection Report 07001151/202340 ML23202A1472023-07-24024 July 2023 Westinghouse Columbia Fuel Fabrication Facility Integrated Inspection Report 07001151/2023002 ML23150A2362023-07-0303 July 2023 Letter to Westinghouse Regarding Effluent Testing Issue ML23184A1512023-06-29029 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report Revision ML23171B1502023-06-20020 June 2023 Westinghouse Columbia Fuel 2023 Special Nuclear Material Inventory Summary Report ML23160A2612023-06-0909 June 2023 Westinghouse, Request for Modification to Temporary License Conditions for Sampling, Analysis and Disposition of Hematite Ash Material ML23139A1942023-06-0505 June 2023 Westinghouse Electric Company LLC - Approval of Environmental Sampling and Monitoring Program ML23138A3762023-05-18018 May 2023 Westinghouse Submittal of Columbia Fuel Fabrication Facility Site Emergency Plan, Revision 23 ML23096A2812023-05-15015 May 2023 Letter - Transfer of Control Approval 2023 ML23094A1582023-05-0505 May 2023 Westinghouse Electric Company, LLC - Revision to Temporarily Store Hematite Ash Above License Limits and Removal of Uranium Flywheel ML23115A2382023-04-26026 April 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151/2023001 ML23114A3592023-04-24024 April 2023 Westinghouse Submittal of Environmental Sampling and Monitoring Program for NRC Review and Approval ML23114A3612023-03-23023 March 2023 Enclosures 2 & 3 - SCDHEC Approval Letter of Westinghouse Ri Report, Dated March 23, 2023 and Environmental Sampling and Monitoring Program Section of SNM-1107 License Application ML23055A3022023-03-0808 March 2023 Letter - Westinghouse License Transfer Interim Threshold Determination ML23058A4482023-02-27027 February 2023 Request for Threshold Determination for Interim Transaction Included in December 20, 2022 Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals ML23058A2722023-02-27027 February 2023 Westinghouse, NRC Semiannual Discharge Report July - December 2022 ML23053A0712023-02-17017 February 2023 Westinghouse Electric Company LLC, Supplement to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23053A0752023-02-17017 February 2023 Westinghouse Electric Co. - Supplement 2 to Application for Consent to Indirect Change of Control with Respect to a Materials License, Export Licenses, and Notification Regarding Other Approvals and Request for Threshold Determination ML23047A4562023-02-16016 February 2023 Westinghouse, Response to Request for Additional Information - Request for Temporary License Amendment for Storage of Hematite Ash ML23024A2312023-01-30030 January 2023 Westinghouse Columbia Fuel Fabrication Facility - Integrated Inspection Report 07001151//2022004 ML23030B8552023-01-30030 January 2023 Westinghouse 10CFR70.72 Facility Change Report ML23013A2122023-01-27027 January 2023 Acceptance Letter for Westinghouse License Transfer - Cac/Epid L-2022-LLM-0004 ML23026A3642023-01-26026 January 2023 Westinghouse, January 2023 Updated Integrated Safety Analysis Summary ML22354A0732023-01-19019 January 2023 Response to Westinghouse Revised Funding Instrument in Support of the Decommissioning Funding Plan 2024-09-18 Category:Response to Request for Additional Information (RAI) MONTHYEARML22080A2822022-03-21021 March 2022
[Table view]Westinghouse, Response to NRC Request for Additional Information Associated with the SNM-1107 License Renewal Environmental Impact Statement ML22074A1292022-03-15015 March 2022 Westinghouse - Response to NRC Request for Additional Information Associated with the SNM-1107 License Renewal Environmental Impact Statement ML22052A0122022-02-21021 February 2022 Response to NRC Request for Additional Information Associated with the SNM-1107 License Renewal Environmental Impact Statement ML21102A0692021-04-0606 April 2021 Westinghouse Columbia Fuel Fabrication Facility License Renewal Environmental Commitments ML21141A1522021-03-24024 March 2021 RAI-31 - Actual CO2e Emissions Calculations ML21141A1512021-03-24024 March 2021 Clarification Needs-Westinghouse Lr EIS-WEC Response ML20353A2782020-12-18018 December 2020 Enclosure 2 - Response to Request for Additional Information - March 2019 Environmental Report Updates ML20353A2792020-12-18018 December 2020 Enclosure 3 - Response to Request for Additional Information - Cww Well Permit and Approval ML20353A2832020-12-18018 December 2020 Enclosure 7 - Response to Request for Additional Information - Facility Wide Criteria and Tap Model ML20353A2842020-12-18018 December 2020 Enclosure 8 - Response to Request for Additional Information - Table 2 - Emission Calculations for Industrial Incinerator ML20353A2862020-12-18018 December 2020 Enclosure 9 - Response to Request for Additional Information - Table 6 - Industrial Incinerator; Emission Calculations for Metals, Acid Gases, and Dioxin/Furans ML20353A2872020-12-18018 December 2020 Enclosure 10 - Response to Request for Additional Information - Sum of Fractions of Isotopic Uranium in Soil Beneath Sea-Land Containers Figures ML20353A2892020-12-18018 December 2020 Enclosure 12 - Response to Request for Additional Information - DHEC Response to Hf Spiking Station 2 Assessment Report ML20353A2902020-12-18018 December 2020 Enclosure 13 - Response to Request for Additional Information - LTR-RAC-19-64, Manifests for Hfss 2 Soil Remediation ML20353A2912020-12-18018 December 2020 Enclosure 14 - Response to Request for Additional Information - Monthly Discharge Monitoring Reports ML20353A2922020-12-18018 December 2020 Enclosure 15 - Response to Request for Additional Information LTR-RAC-18-81 Hf Spiking Station 2 Summary Westinghouse Nuclear Fuel Facility Hopkins, Sc ML20353A2932020-12-18018 December 2020 Enclosure 16 - Response to Request for Additional Information - Soil & Materials Engineers, Inc., 1982, Ground-Water Hydrology of the Westinghouse Electric Corporation Plant, Richland County, South Carolina: Report No. H-8119, March 1, 1982 ML20353A2972020-12-18018 December 2020 Enclosre 20 - Response to Request for Additional Information - May 2019 Air Permit Renewal Application Table 4 - Emission Calculations for Scrubber ML20353A3242020-12-18018 December 2020 Enclosure 21 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Appendix 2.E ML20353A3272020-12-18018 December 2020 Enclosure 24 - Site CSM Cross Sections, 2.5X Vertical Exaggeration and 15X Vertical Exaggeration, Conceptual Site Model Rev. 1a ML20353A3282020-12-18018 December 2020 Enclosure 25 - Response to Request for Additional Information, Boring Logs ML20353A3352020-12-18018 December 2020 Enclosure 28 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Section 6 ML20353A2962020-12-18018 December 2020 Enclosure 19 - Response to Request for Additional Information - Preliminary Human Health Risk Assessment Westinghouse Columbia Fuel Fabrication Facility 5801 Bluff Road Hopkins South Carolina ML20353A2802020-12-18018 December 2020 Enclosure 4 - Response to Request for Additional Information - Phase II Remedial Investigation Work Plan ML20353A2772020-12-18018 December 2020 Enclosure 1 - Response to Request for Additional Information Re Environmental Review for the Proposed Renewal of the Westinghouse Columbia Fuel Fabrication Facility License ML20353A2942020-12-18018 December 2020 Enclosure 17 - Response to Request for Additional Information - 2018/2019 Annual Groundwater Report ML20353A2882020-12-18018 December 2020 Enclosure 11 - Response to Request for Additional Information - RA-433, Environmental Remediation ML20353A2812020-12-18018 December 2020 Enclosure 5 - Response to Request for Additional Information - RAF-104-5, Environmental Protection Guidelines and Checklist ML20353A2822020-12-18018 December 2020 Enclosure 6 - Response to Request for Additional Information - TAF-500-11, 10 CFR 70.72 Engineering Pre-screening Checklist ML20353A3292020-12-18018 December 2020 Enclosure 26 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Section 5 ML20353A3342020-12-18018 December 2020 Enclosure 27 - Response to Request for Additional Information, Westinghouse Nuclear Fuel Columbia Site Evaluation Report, March 1975 Section 2 ML20317A1912020-11-12012 November 2020 Westinghouse Response to Request for Additional Information Schedule- Environmental Review for the Proposed Renewal of the Westinghouse Columbia Fuel Fabrication Facility License (Enterprise Project Identifier L-201-RNW-0016) ML20287A5462020-10-12012 October 2020 Westinghouse - Response to Request for Additional Information Request for Alternate Disposal Approval and Exemption for Specific Columbia Fuel Fabrication Facility Waste ML20266G5522020-09-22022 September 2020 Attachment 1 - Response to Request for Additional Information Request for Alternate Disposal Approval and Exemption for Specific Columbia Fuel Fabrication Facility Waste ML20266G5512020-09-22022 September 2020 Westinghouse Electric Company, LLC - Response to Request for Additional Information - Alternate Disposal Approval and Exemptions for Specific Columbia Fuel Fabrication Facility Waste ML20063P3272020-02-29029 February 2020 Interim Remedial Investigation Data Summary Report Westinghouse Columbia Fuel Fabrication Facility ML18257A0622018-09-13013 September 2018 Response to Request for Additional Information Westinghouse Electric Company WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement. ML18144A9942018-05-24024 May 2018 Westinghouse Electric Company, LLC - Response to Request for Additional Information Regarding Application for NRC Consent to License Transfer (EPID L-2018-LLM-0001) ML18005A5362018-01-0505 January 2018 Westinghouse - Response to Request for Additional Information (TAC # L33317)re License Renewal Application for Columbia Fuel Fabrication Facility 2022-03-21 |
Text
WESTINGHOUSE NON-PROPRIETARY CLASS 3
@Westinghouse Westinghouse Electric Company LLC Columbia Fuel Site 5801 Bluff Road Hopkins, South Carolina 29061-9121 USA Director, Office of Nuclear Material Safety and Direct tel: 803-647-2046 Safeguards U. S. Nuclear Regulatory Commission e-mail: malekem@westinghouse.com Document Control Desk 11555 Rockville Pike Your ref:
Rockville, Maryland 20852-2738 Our ref: LTR-RAC-20-74 September 22, 2020
SUBJECT:
Response to Request for Additional Information - Alternate Disposal Approval and Exemptions for Specific Columbia Fuel Fabrication Facility Waste (License No . SNM-1107, Docket No. 70-1151)
REFERENCE:
- 1) Nuclear Regulatory Commission letter to Westinghouse dated September 4, 2020, "Request for Additional Information: Westinghouse Electric Company, LLC, Request for Alternate Disposal Approval of Specified Low Activity Radioactive Materials (Enterprise Project Identifier L-2020-LLL-0009)"
- 2) Westinghouse letter to NRC dated May 8, 2020, "Request for Alternate Disposal Approval and Exemption for Specific Columbia Fuel Fabrication Waste" (ML20129J934)
This letter responds to NRC ' s request for additional information, Reference 1, as it relates to the Westinghouse request for alternate disposal approval in accordance with 10 CFR 20.2002 and exemption from the requirements in 10 CFR 30.3 and 10 CFR 70.3 , Reference 2.
Attachment 1 to this letter provides Westinghouse's responses.
Please contact me at (803) 647-2046 should you have questions or need any additional information.
Regulatory Affairs Manager Westinghouse Columbia Fuel Fabrication Facility Docket 70-1151 License SNM-1107 Attachment 1: Response to Request for Additional Information - Request for Alternate Disposal Approval and Exemption for Specific Columbia Fuel Fabrication Waste (12 pages)
© 2020 Westinghouse Electric Company LLC All Rights Reserved
WESTINGHOUSE NON-PROPRIETARY CLASS 3 Page 2 of2 Our ref: LTR-RAC-20-74 September 22, 2020 cc:
Mr. Thomas Vukovinsky Ms. Irene Wu