Letter Sequence RAI |
---|
|
Results
Other: ML23038A034, ML23038A035, ML23058A279, ML23058A281, ML23058A283, ML23058A284, ML23058A286, ML23058A287, ML23059A252, ML23061A185, ML23067A441, ML23090A002, ML23152A205, ML23160A081, ML23160A082, ML23160A084, ML23160A086, ML23160A087
|
MONTHYEARML23058A2862022-07-29029 July 2022 Part 1-Response, Acceptance Review, 2/23/23, Document No. 1 Japanese Certificate of the Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K (English Version) Issued on May 23, 2022 Project stage: Other ML23006A1042023-01-0505 January 2023 Cover Letter from Richard Boyle (DOT) Requesting the Review and Revalidation of the Model No. JRF-90Y-950K Project stage: Request ML23160A0842023-01-0505 January 2023 Email Dated 1/5/23 from Rwboyle (DOT) to Arony (Edlow)-Incomplete Application, Information Request, Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Other ML23160A0852023-01-27027 January 2023 Email Dated 1/27/23 from Rwboyle (DOT) to Arony (Edlow)-Incomplete Application, Teleconference Questions for Discussion, Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Meeting ML23038A0352023-02-0101 February 2023 NRC-699, Telephone Call Summary, 11:00AM - Conference Call to Discuss Questions Regarding the Application for Revalidation of the Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. Jrf 90Y-950K (Docket No. 71-3036) Project stage: Other ML23046A0402023-02-0202 February 2023 Revised Affidavit Dated 2/3/23, Revalidation Request for the Japanese Certificate of the Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Request ML23038A0342023-02-0606 February 2023 Email Dated February 6, 2023, from R. Boyle (DOT) to N. Garcia Santos (Nrc), Comment or Edits on the JRF-90Y-950K Telephone Call Summary on February 1, 2023 Project stage: Other ML23160A0862023-02-14014 February 2023 Email Dated 2/14/23 from Rneely (Edlow) to Rboyle (DOT)-Initial Need Dates (Clarification), Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Other ML23058A2842023-02-20020 February 2023 Part 1-Response Acceptance Review, 2-23-23, Document No. 5, Affidavit on the Proprietary Documents of the Application of the Model No. JRF-90Y-950K Project stage: Other ML23058A2812023-02-23023 February 2023 Part 1-Response Acceptance Review, 2-23-23, Document No. No. 3-1 (Non-proprietary), Summary of Change of SAR for JRF-90Y-950K Project stage: Other ML23058A2832023-02-23023 February 2023 Part 1 - Response Acceptance Review, 02/23/2023, Document No. 4-1 (Non-Proprietary) Comparison Table of SAR for Type JRF-90Y-950K Project stage: Other ML23090A0022023-02-23023 February 2023 Part 2 - Request Response, Corrected Page 47 in Correction Table of Document No. 4-1 Project stage: Other ML23058A2852023-02-23023 February 2023 Part 1 - Transmittal Letter Dated 2/23/23 from Russell Neely (Edlow International) to Rick Boyle (Dot), Responses of Request for Supplemental Information from NRC on Completeness of the Application for the Model No. JRF-90Y-950K (J/2043/B(U Project stage: Supplement ML23058A2792023-02-23023 February 2023 Part 1-Response, Acceptance Review, 2/23/23, Document No. 2-1 (Non-Proprietary) Safety Analysis Report, Application of Design Approval for the Model No. JRF-90Y-950K (J/2043/B(U)F) Project stage: Other ML23058A2872023-02-23023 February 2023 Part 1-Response, Acceptance Review, 2/23/23, Document No. No. 1-1 (Non-Proprietary), Japanese Certificate of the Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K (English Version) Issued on May 23, 2022 Project stage: Other ML23059A2522023-02-27027 February 2023 Part 2-Response Acceptance Review, 2-27-23, Updated Document No. 4-1 (Non-proprietary) Comparison Table of SAR for Type JRF-90Y-950K Project stage: Other ML23059A2542023-02-27027 February 2023 Part 2 - Transmittal Letter Dated 2/27/23 from Russell Neely (Edlow International) to Rick Boyle (Dot), Responses of Request for Supplemental Information, Completeness of the Application for the Model No. JRF-90Y-950K (J/2043/B(U)F) Project stage: Supplement ML23061A1862023-03-0202 March 2023 Part 3 - Transmittal Letter Dated 3/2/23 from Rick Boyle (DOT) to Norma Garcia Santos (Nrc), Responses to Request for Supplemental Information, Application for the Model No. JRF-90Y-950K (J/2043/B(U)F) Project stage: Supplement ML23061A1852023-03-0202 March 2023 Part 3 - 03/02/2023, Comparison Table for the Applications for 2020 (J/170/B(U)F-96; Kyoto), 2021 (J/2039/B(U)F; Kyoto), and 2022 (J/2043/B(U)F; Jaea), Model No. JRF-90Y-950K (J/2043/B(U)F) Project stage: Other ML23067A4412023-03-16016 March 2023 Application for the Japanese Certificate of Competent Authority No. J/2043/B(U), Revision 2, Model No. JRF-90Y-950K - Accepted for Review - CAC No. 001794 and EPID No. L-2023-DOT-0000 Project stage: Other ML23160A0872023-04-11011 April 2023 Email Dated 4/11/23 from Rneely (Edlow) to Rboyle (DOT)-Confirmation of Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K, as Public Records Project stage: Other ML23104A4452023-05-0101 May 2023 Letter to R. Boyle Request for Revalidation of Japanese Certificate of Approval J/2043/B(U)F for the JRF-90Y-950K Package- Request for Additional Information, Docket 71-3036 Project stage: RAI ML23136B1682023-05-10010 May 2023 Letter from Michihiro Kaka (Japan Atomic Energy Agency or Jaea) to Norma Garcia Santos (NRC) Response to the Request for Additional Information for the Revalidation of Japanese Certificate of Approval J/2043/B(U)F for the Model No. JRF-90Y- Project stage: Request ML23136B1662023-05-10010 May 2023 Email from R. Boyle (DOT) to N. Garcia (NRC) Response to the Request for Additional Information for the Revalidation of Japanese Certificate of Approval J/2043/B(U)F for the Model No. JRF-90Y-950K Package, Docket 71-3036 Project stage: Request ML23136B1672023-05-11011 May 2023 Letter from Richard W. Boyle (DOT) to Norma Garcia Santos, Response to the Request for Additional Information for the Revalidation of Japanese Certificate of Approval J/2043/B(U)F for the Model No. JRF-90Y-950K Package, Docket 71-3036 Project stage: Request ML23160A0812023-06-0505 June 2023 Email 2 (Corrected Dated Comments) 6/5/23 from Rneely (Edlow) to Ngarcia Santos (Nrc), R Boyle (Dot), and Msumrall (DOT)-Courtesy Proprietary Review SER, Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Other ML23160A0822023-06-0505 June 2023 Email 1 (Transmittal of Comments) 6/5/23 from Rneely (Edlow) to Ngarcia Santos (Nrc), R Boyle (Dot), and Msumrall (DOT)-Courtesy Proprietary Review SER, Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Other ML23152A2042023-06-13013 June 2023 Safety Evaluation Report for the Revalidation of the Japanese Certificate of Competent Authority No. J/2043/B(U)-96 for the Model No. JRF-90Y-950K Project stage: Approval ML23159A2672023-06-13013 June 2023 Approval of the Request for Withholding Information from Public Disclosure of the Application for Japanese Certificate of Competent Authority No. J/2043/B(U), Model No. JRF-90Y-950K Package (Docket No. 71-3036) Project stage: Withholding Request Acceptance ML23152A2052023-06-13013 June 2023 Transmittal Letter for the Revalidation of the Japanese Certificate of Competent Authority No. J/2043/B(U)-96 for the Model No. JRF-90Y-950K Project stage: Other 2023-02-27
[Table View] |
|
---|
Category:Letter
MONTHYEARML23159A2672023-06-13013 June 2023 Approval of the Request for Withholding Information from Public Disclosure of the Application for Japanese Certificate of Competent Authority No. J/2043/B(U), Model No. JRF-90Y-950K Package (Docket No. 71-3036) ML23152A2052023-06-13013 June 2023 Transmittal Letter for the Revalidation of the Japanese Certificate of Competent Authority No. J/2043/B(U)-96 for the Model No. JRF-90Y-950K ML23136B1672023-05-11011 May 2023 Letter from Richard W. Boyle (DOT) to Norma Garcia Santos, Response to the Request for Additional Information for the Revalidation of Japanese Certificate of Approval J/2043/B(U)F for the Model No. JRF-90Y-950K Package, Docket 71-3036 ML23136B1682023-05-10010 May 2023 Letter from Michihiro Kaka (Japan Atomic Energy Agency or Jaea) to Norma Garcia Santos (NRC) Response to the Request for Additional Information for the Revalidation of Japanese Certificate of Approval J/2043/B(U)F for the Model No. JRF-90Y- ML23104A4452023-05-0101 May 2023 Letter to R. Boyle Request for Revalidation of Japanese Certificate of Approval J/2043/B(U)F for the JRF-90Y-950K Package- Request for Additional Information, Docket 71-3036 ML23067A4412023-03-16016 March 2023 Application for the Japanese Certificate of Competent Authority No. J/2043/B(U), Revision 2, Model No. JRF-90Y-950K - Accepted for Review - CAC No. 001794 and EPID No. L-2023-DOT-0000 ML23061A1852023-03-0202 March 2023 Part 3 - 03/02/2023, Comparison Table for the Applications for 2020 (J/170/B(U)F-96; Kyoto), 2021 (J/2039/B(U)F; Kyoto), and 2022 (J/2043/B(U)F; Jaea), Model No. JRF-90Y-950K (J/2043/B(U)F) ML23061A1862023-03-0202 March 2023 Part 3 - Transmittal Letter Dated 3/2/23 from Rick Boyle (DOT) to Norma Garcia Santos (Nrc), Responses to Request for Supplemental Information, Application for the Model No. JRF-90Y-950K (J/2043/B(U)F) ML23059A2542023-02-27027 February 2023 Part 2 - Transmittal Letter Dated 2/27/23 from Russell Neely (Edlow International) to Rick Boyle (Dot), Responses of Request for Supplemental Information, Completeness of the Application for the Model No. JRF-90Y-950K (J/2043/B(U)F) ML23058A2812023-02-23023 February 2023 Part 1-Response Acceptance Review, 2-23-23, Document No. No. 3-1 (Non-proprietary), Summary of Change of SAR for JRF-90Y-950K ML23058A2852023-02-23023 February 2023 Part 1 - Transmittal Letter Dated 2/23/23 from Russell Neely (Edlow International) to Rick Boyle (Dot), Responses of Request for Supplemental Information from NRC on Completeness of the Application for the Model No. JRF-90Y-950K (J/2043/B(U ML23058A2872023-02-23023 February 2023 Part 1-Response, Acceptance Review, 2/23/23, Document No. No. 1-1 (Non-Proprietary), Japanese Certificate of the Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K (English Version) Issued on May 23, 2022 ML23058A2792023-02-23023 February 2023 Part 1-Response, Acceptance Review, 2/23/23, Document No. 2-1 (Non-Proprietary) Safety Analysis Report, Application of Design Approval for the Model No. JRF-90Y-950K (J/2043/B(U)F) ML23006A1042023-01-0505 January 2023 Cover Letter from Richard Boyle (DOT) Requesting the Review and Revalidation of the Model No. JRF-90Y-950K ML23058A2862022-07-29029 July 2022 Part 1-Response, Acceptance Review, 2/23/23, Document No. 1 Japanese Certificate of the Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K (English Version) Issued on May 23, 2022 ML22096A0812022-04-24024 April 2022 Letter -71-3036 Revalidation for JRF-90Y-950K Kuca ML22083A0792022-04-0101 April 2022 Letter to DOT Recommending Revalidation for the Model No. JRF-90Y-950K Package Containing a Spectrum Converter ML22063B1132022-01-12012 January 2022 Letter from DOT Requesting NRC Review ML22063B1122022-01-12012 January 2022 Edlow International Letter to DOT Revalidation of Japanese Certificate J/2039/B(U)F ML21336A4062021-09-29029 September 2021 RAI Response: JRF-90Y-950K, Docket No. 71-3036, 8/27/2021 Response Letter from Dot,Rai Responses ML21029A1082021-02-0808 February 2021 Letter to R. Boyle Request for Revalidation of Japanese Certificate of Approval J/170/B(U)F-96 for the JRF-90Y-950K Package Request for Additional Information, Docket 71-3036 ML21033A6362020-10-0101 October 2020 Letter, Dated 10/01/2020, R. Boyle, Request for Review of Japanese Certificate of Approval No. J/170/B(U)F-96, Docket No. 71-3036 ML21033A6372020-06-23023 June 2020 Competent Authority of Japan, Certificate of Approval of Package Design for Transport of Radioactive Materials, Rev 3 (Associated with Letter, Dated 10/01/2020, R. Boyle ML21033A6382019-12-31031 December 2019 Safety Analysis Report of the JRF-90Y-950K (Letter, Dated 10/01/2020, R. Boyle, Request for Review of Japanese Certificate of Approval No. J/170/B(U)F-96, Docket No. 71-3036) 2023-06-13
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23136B1662023-05-10010 May 2023 Email from R. Boyle (DOT) to N. Garcia (NRC) Response to the Request for Additional Information for the Revalidation of Japanese Certificate of Approval J/2043/B(U)F for the Model No. JRF-90Y-950K Package, Docket 71-3036 ML23104A4452023-05-0101 May 2023 Letter to R. Boyle Request for Revalidation of Japanese Certificate of Approval J/2043/B(U)F for the JRF-90Y-950K Package- Request for Additional Information, Docket 71-3036 ML22063B1592022-02-0404 February 2022 NRC E-mail Request for Additional Information on Application for Approval of JRF-90Y-950K ML21029A1082021-02-0808 February 2021 Letter to R. Boyle Request for Revalidation of Japanese Certificate of Approval J/170/B(U)F-96 for the JRF-90Y-950K Package Request for Additional Information, Docket 71-3036 2023-05-10
[Table view] |
Text
May 1, 2023 Richard W. Boyle, Chief Sciences Branch Division of Engineering and Research Office of Hazardous Materials Safety U.S. Department of Transportation 1200 New Jersey Ave., S.E.
Washington, DC 20590
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR REVIEW OF THE CERTIFICATE OF COMPLIANCE NO. 3036 (EPID L-2023-DOT-0000)
Dear Richard W. Boyle:
By letter dated January 5, 2023 (Agencywide Documents Access and Management System
[ADAMS] Accession Number ML23006A104), and supplemented on March 2, 2023 (ML23061A186), you submitted an application to the U.S. Nuclear Regulatory Commission (NRC) for the review of the Certificate of Competent Authority No. J/2043/B(U), Model No. JRF-90Y-950K. In your application you requested that the NRC provides a recommendation to revalidate the Model No. JRF-90Y-950K package.
In connection with our review, we need the information identified in the enclosure to this letter.
To assist us in scheduling the staff review of your response, we request that you provide this information by 20 days from the date of this letter. Inform us at your earliest convenience, but no later than 10 days from the date of this letter, if you are not able to provide the information by that date. If you are unable to provide a response in the requested time, our review may be delayed.
Please reference Docket No. 71-3036 and EPID L-2023-DOT-0000 in future correspondence related to this request. The staff is available to meet to discuss your proposed responses. If you have any questions regarding this matter, I may be contacted at Norma.GarciaSantos@nrc.gov.
Sincerely, Signed by Garcia Santos, Norma on 05/01/23 Norma Garcia SAntos, Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 71-3036 EPID L-2023-DOT-0000
Enclosure:
Request for Additional Information
Request for Additional Information U.S. Department of Transportation Japanese Approval Certificate No. J/2043/B(U)F, Revision 2 Docket No. 71-3036 Certificate of Compliance No. 3036 Model No. JRF-90Y-950K By letter dated January 5, 2023 (Agencywide Documents Access and Management System
[ADAMS] Accession Number ML23006A104), and supplemented on March 2, 2023 (ML23061A186), you submitted an application to the U.S. Nuclear Regulatory Commission (NRC) for the review of the Certificate of Competent Authority No. J/2043/B(U), Model No. JRF-90Y-950K. In your application you requested that the NRC provides a recommendation to revalidate the Model No. JRF-90Y-950K package.
This request for additional information (RAI) identifies information needed by the NRC staff (the staff) in connection with its review of the application. The staff used International Atomic Energy Agency (IAEA) Specific Safety Requirements No. 6 (SSR-6), Regulations for the Safe Transport of Radioactive Material, 2018 Edition, in its review of the application.
The RAI describes information needed by the staff to complete its review of the application and to determine whether the applicant has demonstrated compliance with the regulatory requirements of the IAEA SSR-6, 2018 Edition.
Materials Evaluation RAI 7-1. Provide details on how the heat insulator (hard polyurethane foam) and shock absorber (balsa wood) are considered to be in a sealed state (e.g., encased in welded stainless steel), such that the materials are adequately protected from damage due to moisture or water intrusion. If the polyurethane foam and wood are not permanently sealed, please address how these materials are inspected for water damage and repaired/replaced, as needed, since both are susceptible to degradation over time when exposed to moisture or water intrusion. Also, Revise the SAR with additional details to remove the ambiguity.
The staff is unclear if the polyurethane foam and wood materials are sealed in the main body and the outer lid only when the package is sealed closed for transportation, or if both the main body and the outer lid provide independent sealed compartments even when the outer lid is not installed on the main body.
If both these materials are only considered to be in a sealed state when the outer lid is installed on the main body, how are the polyurethane foam and wood materials visually inspected and repaired/replaced if damage is found? Visual inspection requirements in Section III-Table A.1 for pre-shipment inspection, and Section (III) B for maintenance requirements only mention visual inspection of inner and outer surfaces of the main body, fuel basket, inner lid and outer lid.
Enclosure
The staff noted that in SAR Section (III)-A package handling methods, on Page (III)-A-1 and Page (III)-A-2, the pre-shipment content inspection is referenced to be in section (IV)-A.2 and (IV)-Table A.1. However, the pre-shipment inspection of the package is found on Page (III)-A-3 under (III) Table A.1.
This information is needed to determine compliance with IAEA SSR-6, 2018 Edition, paragraphs 613A and 809(f).