MONTHYEARML23058A2862022-07-29029 July 2022 Part 1-Response, Acceptance Review, 2/23/23, Document No. 1 Japanese Certificate of the Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K (English Version) Issued on May 23, 2022 Project stage: Other ML23160A0842023-01-0505 January 2023 Email Dated 1/5/23 from Rwboyle (DOT) to Arony (Edlow)-Incomplete Application, Information Request, Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Other ML23006A0982023-01-0505 January 2023 Document No. 5 - Summary of Changes of the Safety Evaluation Report for the Model No. JRF-90Y-950K Nuclear Fuel Transport Package Project stage: Request ML23006A1042023-01-0505 January 2023 Cover Letter from Richard Boyle (DOT) Requesting the Review and Revalidation of the Model No. JRF-90Y-950K Project stage: Request ML23160A0852023-01-27027 January 2023 Email Dated 1/27/23 from Rwboyle (DOT) to Arony (Edlow)-Incomplete Application, Teleconference Questions for Discussion, Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Meeting ML23038A0352023-02-0101 February 2023 NRC-699, Telephone Call Summary, 11:00AM - Conference Call to Discuss Questions Regarding the Application for Revalidation of the Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. Jrf 90Y-950K (Docket No. 71-3036) Project stage: Other ML23046A0402023-02-0202 February 2023 Revised Affidavit Dated 2/3/23, Revalidation Request for the Japanese Certificate of the Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Request ML23038A0342023-02-0606 February 2023 Email Dated February 6, 2023, from R. Boyle (DOT) to N. Garcia Santos (Nrc), Comment or Edits on the JRF-90Y-950K Telephone Call Summary on February 1, 2023 Project stage: Other ML23160A0862023-02-14014 February 2023 Email Dated 2/14/23 from Rneely (Edlow) to Rboyle (DOT)-Initial Need Dates (Clarification), Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Other ML23058A2842023-02-20020 February 2023 Part 1-Response Acceptance Review, 2-23-23, Document No. 5, Affidavit on the Proprietary Documents of the Application of the Model No. JRF-90Y-950K Project stage: Other ML23058A2552023-02-20020 February 2023, 23 February 2023, 27 February 2023, 2 March 2023 Response to Request for Supplemental Information - Revalidation of the Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. Jrf 90Y-950K (Docket No. 71-3036) Project stage: Request ML23090A0022023-02-23023 February 2023 Part 2 - Request Response, Corrected Page 47 in Correction Table of Document No. 4-1 Project stage: Other ML23058A2852023-02-23023 February 2023 Part 1 - Transmittal Letter Dated 2/23/23 from Russell Neely (Edlow International) to Rick Boyle (Dot), Responses of Request for Supplemental Information from NRC on Completeness of the Application for the Model No. JRF-90Y-950K (J/2043/B(U Project stage: Supplement ML23058A2872023-02-23023 February 2023 Part 1-Response, Acceptance Review, 2/23/23, Document No. No. 1-1 (Non-Proprietary), Japanese Certificate of the Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K (English Version) Issued on May 23, 2022 Project stage: Other ML23058A2792023-02-23023 February 2023 Part 1-Response, Acceptance Review, 2/23/23, Document No. 2-1 (Non-Proprietary) Safety Analysis Report, Application of Design Approval for the Model No. JRF-90Y-950K (J/2043/B(U)F) Project stage: Other ML23058A2832023-02-23023 February 2023 Part 1 - Response Acceptance Review, 02/23/2023, Document No. 4-1 (Non-Proprietary) Comparison Table of SAR for Type JRF-90Y-950K Project stage: Other ML23058A2812023-02-23023 February 2023 Part 1-Response Acceptance Review, 2-23-23, Document No. No. 3-1 (Non-proprietary), Summary of Change of SAR for JRF-90Y-950K Project stage: Other ML23059A2522023-02-27027 February 2023 Part 2-Response Acceptance Review, 2-27-23, Updated Document No. 4-1 (Non-proprietary) Comparison Table of SAR for Type JRF-90Y-950K Project stage: Other ML23059A2542023-02-27027 February 2023 Part 2 - Transmittal Letter Dated 2/27/23 from Russell Neely (Edlow International) to Rick Boyle (Dot), Responses of Request for Supplemental Information, Completeness of the Application for the Model No. JRF-90Y-950K (J/2043/B(U)F) Project stage: Supplement ML23061A1862023-03-0202 March 2023 Part 3 - Transmittal Letter Dated 3/2/23 from Rick Boyle (DOT) to Norma Garcia Santos (Nrc), Responses to Request for Supplemental Information, Application for the Model No. JRF-90Y-950K (J/2043/B(U)F) Project stage: Supplement ML23061A1852023-03-0202 March 2023 Part 3 - 03/02/2023, Comparison Table for the Applications for 2020 (J/170/B(U)F-96; Kyoto), 2021 (J/2039/B(U)F; Kyoto), and 2022 (J/2043/B(U)F; Jaea), Model No. JRF-90Y-950K (J/2043/B(U)F) Project stage: Other ML23067A4412023-03-16016 March 2023 Application for the Japanese Certificate of Competent Authority No. J/2043/B(U), Revision 2, Model No. JRF-90Y-950K - Accepted for Review - CAC No. 001794 and EPID No. L-2023-DOT-0000 Project stage: Other ML23160A0872023-04-11011 April 2023 Email Dated 4/11/23 from Rneely (Edlow) to Rboyle (DOT)-Confirmation of Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K, as Public Records Project stage: Other ML23104A4452023-05-0101 May 2023 Letter to R. Boyle Request for Revalidation of Japanese Certificate of Approval J/2043/B(U)F for the JRF-90Y-950K Package- Request for Additional Information, Docket 71-3036 Project stage: RAI ML23136B1682023-05-10010 May 2023 Letter from Michihiro Kaka (Japan Atomic Energy Agency or Jaea) to Norma Garcia Santos (NRC) Response to the Request for Additional Information for the Revalidation of Japanese Certificate of Approval J/2043/B(U)F for the Model No. JRF-90Y- Project stage: Request ML23136B1662023-05-10010 May 2023 Email from R. Boyle (DOT) to N. Garcia (NRC) Response to the Request for Additional Information for the Revalidation of Japanese Certificate of Approval J/2043/B(U)F for the Model No. JRF-90Y-950K Package, Docket 71-3036 Project stage: Request ML23136B1672023-05-11011 May 2023 Letter from Richard W. Boyle (DOT) to Norma Garcia Santos, Response to the Request for Additional Information for the Revalidation of Japanese Certificate of Approval J/2043/B(U)F for the Model No. JRF-90Y-950K Package, Docket 71-3036 Project stage: Request ML23160A0822023-06-0505 June 2023 Email 1 (Transmittal of Comments) 6/5/23 from Rneely (Edlow) to Ngarcia Santos (Nrc), R Boyle (Dot), and Msumrall (DOT)-Courtesy Proprietary Review SER, Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Other ML23160A0812023-06-0505 June 2023 Email 2 (Corrected Dated Comments) 6/5/23 from Rneely (Edlow) to Ngarcia Santos (Nrc), R Boyle (Dot), and Msumrall (DOT)-Courtesy Proprietary Review SER, Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Other ML23152A2042023-06-13013 June 2023 Safety Evaluation Report for the Revalidation of the Japanese Certificate of Competent Authority No. J/2043/B(U)-96 for the Model No. JRF-90Y-950K Project stage: Approval ML23152A2052023-06-13013 June 2023 Transmittal Letter for the Revalidation of the Japanese Certificate of Competent Authority No. J/2043/B(U)-96 for the Model No. JRF-90Y-950K Project stage: Other ML23159A2672023-06-13013 June 2023 Approval of the Request for Withholding Information from Public Disclosure of the Application for Japanese Certificate of Competent Authority No. J/2043/B(U), Model No. JRF-90Y-950K Package (Docket No. 71-3036) Project stage: Withholding Request Acceptance 2023-02-27
[Table View] |
Text
Request for Additional Information U.S. Department of Transportation Japanese Approval Certificate No. J/2043/B(U)F, Revision 2 Docket No. 71-3036 Certificate of Compliance No. 3036 Model No. JRF-90Y-950K By letter dated January 5, 2023 (Agencywide Documents Access and Management System
[ADAMS] Accession Number ML23006A104) and supplemented on March 2, 2023 (ML23061A186),
you submitted an application to the U.S. Nuclear Regulatory Commission (NRC) for the review of the Certificate of Competent Authority No. J/2043/B(U), Model No. JRF-90Y-950K. In your application you requested that the NRC provides a recommendation to revalidate the Model No.
JRF-90Y-950K package.
This request for additional information (RAI) identifies information needed by the NRC staff (the staff) in connection with its review of the application. The staff used International Atomic Energy Agency (IAEA) Specific Safety Requirements No. 6 (SSR-6), Regulations for the Safe Transport of Radioactive Material, 2018 Edition, in its review of the application.
The RAI describes information needed by the staff to complete its review of the application and to determine whether the applicant has demonstrated compliance with the regulatory requirements of the IAEA SSR-6, 2018 Edition.
Materials Evaluation RAI 7-1. Provide details on how the heat insulator (hard polyurethane foam) and shock absorber (balsa wood) are considered to be in a sealed state (e.g., encased in welded stainless steel), such that the materials are adequately protected from damage due to moisture or water intrusion. If the polyurethane foam and wood are not permanently sealed, please address how these materials are inspected for water damage and repaired/replaced, as needed, since both are susceptible to degradation over time when exposed to moisture or water intrusion. Also, Revise the SAR with additional details to remove the ambiguity.
JAEA Official Response The heat insulator (hard polyurethane foam) and shock absorber (balsa wood) are encased in the outer shell body and lid (welded stainless steel plate) as shown below. In addition, fusible(melting) plugs (solder, stainless steel) are attached to the outer shell body and lid. The fusible(melting) plugs are for venting gas in case of fire and are not to be removed during normal operation, so that moisture and water cannot enter the container.
The main body, outer shell lid, and fusible(melting) plugs are inspected prior to shipping (prior to transportation) as described in (III)-A-1 to 4 to check for any abnormalities. The scope of the visual inspection includes the main body, inner shell lid, and outer lid, and the appearance of the balsa wood and the component (stainless steel) that contains the polyurethane foam inside is inspected.
<()-C-6>
2.1 Main body (Refer to ()-Fig. C.6)
The main body is cylindrical in shape with 1,559mm in height and 840mm in outer diameter and consists of the outer shell and inner shell.
The outer shell consists of 3mm thick stainless steel and 6mm thick stainless steel at the bottom.
The inner shell consists of 10mm thick stainless steel and 35mm thick stainless steel at the bottom.
The shell and bottom plate are welded completely. The space between the outer and inner shells, heat insulators and shock absorbers are applied to reduce the heat gain caused by fire and to absorb impact energy caused by drop. At the upper side of the main body, the eye-plates are welded at 4 places to lift the packaging.
Eight fusible(melting) plugs are provided on the outer shell. These plugs are provided to avoid the pressure raise by steam or gas generated from the heat insulator and shock absorber due to heat during fire.
<()-C.8>
2.4 Outer lid (Refer to ()-Fig. C.9)
The outer lid is cylindrical in shape with 398mm in height and 840mm in outer diameter.
The outer cover plate consists of 3mm thick stainless steel shell and 6mm thick stainless steel upper plate. The inner cover plate consists of 3mm thick stainless steels.
The space between the outer and inner cover plates, the heat insulators and shock absorbers are applied to reduce the heat gain caused by fire and to absorb impact energy caused by drop.
4 eye-bolt bosses for lifting are welded to the outer lid. 4 fusible(melting) plugs are provided on the outer cover plate. These plugs are used to avoid the pressure raise by steam or gas generated from the heat insulator and shock absorber due to heat during fire.
The staff is unclear if the polyurethane foam and wood materials are sealed in the main body and the outer lid only when the package is sealed closed for transportation, or if both the main body and the outer lid provide independent sealed compartments even when the outer lid is not installed on the main body.
JAEA Official Response Both the body and the outer lid provide independent sealed compartments even when the outer lid is not attached to the body. In the drawings below, all outside lines indicate stainless steel; polyurethane foam and wood materials are inside this.
()-C-10: Main Body (Refer to ()-Fig. C. 6.)
()-C-13: Outer shell lid (Refer to ()-Fig. C. 9.)
If both these materials are only considered to be in a sealed state when the outer lid is installed on the main body, how are the polyurethane foam and wood materials visually inspected and repaired/replaced if damage is found? Visual inspection requirements in Section III-Table A.1 for pre-shipment inspection, and Section (III) B for maintenance requirements only mention visual inspection of inner and outer surfaces of the main body, fuel basket, inner lid and outer lid.
JAEA Official Response From the above response, both the body and the outer lid provide independent hermetic compartments even when the outer lid is not attached to the body. Therefore, the visual inspection requirement in (III)-
B-1 inspects the inner stainless steel (and some solder).
Revise the SAR with additional details to remove the ambiguity. This information is needed to determine compliance with SSR-6 2018 Edition, paragraphs 613A and 809(f).
Enclosure Observations Observation 7-1 In SAR Section (III)-A package handling methods, on Page (III)-A-1 and Page (III)-A-2, the pre-shipment content inspection is referenced to be in section (IV)-A.2 and (IV)-Table A.1.
However, the pre-shipment inspection of the package is found on Page (III)-A-3 under (III) Table A.1.
JAEA Official Response This appropriate advice is correct, and the sentences on the SAR was incorrect.
Therefore, we amended them as below; Page 596 :
Incorrect : (IV)-A.2 Correct : ()-A. 2.
Page 597 :
Incorrect : (IV)-Table A. 1 Correct : ()-Table A. 1