Letter Sequence Other |
|---|
|
Results
Other: ML23038A034, ML23038A035, ML23058A279, ML23058A281, ML23058A283, ML23058A284, ML23058A286, ML23058A287, ML23059A252, ML23061A185, ML23067A441, ML23090A002, ML23152A205, ML23160A081, ML23160A082, ML23160A084, ML23160A086, ML23160A087
|
MONTHYEARML23058A2862022-07-29029 July 2022 Part 1-Response, Acceptance Review, 2/23/23, Document No. 1 Japanese Certificate of the Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K (English Version) Issued on May 23, 2022 Project stage: Other ML23160A0842023-01-0505 January 2023 Email Dated 1/5/23 from Rwboyle (DOT) to Arony (Edlow)-Incomplete Application, Information Request, Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Other ML23006A0982023-01-0505 January 2023 Document No. 5 - Summary of Changes of the Safety Evaluation Report for the Model No. JRF-90Y-950K Nuclear Fuel Transport Package Project stage: Request ML23006A1042023-01-0505 January 2023 Cover Letter from Richard Boyle (DOT) Requesting the Review and Revalidation of the Model No. JRF-90Y-950K Project stage: Request ML23160A0852023-01-27027 January 2023 Email Dated 1/27/23 from Rwboyle (DOT) to Arony (Edlow)-Incomplete Application, Teleconference Questions for Discussion, Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Meeting ML23038A0352023-02-0101 February 2023 NRC-699, Telephone Call Summary, 11:00AM - Conference Call to Discuss Questions Regarding the Application for Revalidation of the Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. Jrf 90Y-950K (Docket No. 71-3036) Project stage: Other ML23046A0402023-02-0202 February 2023 Revised Affidavit Dated 2/3/23, Revalidation Request for the Japanese Certificate of the Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Request ML23038A0342023-02-0606 February 2023 Email Dated February 6, 2023, from R. Boyle (DOT) to N. Garcia Santos (Nrc), Comment or Edits on the JRF-90Y-950K Telephone Call Summary on February 1, 2023 Project stage: Other ML23160A0862023-02-14014 February 2023 Email Dated 2/14/23 from Rneely (Edlow) to Rboyle (DOT)-Initial Need Dates (Clarification), Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Other ML23058A2842023-02-20020 February 2023 Part 1-Response Acceptance Review, 2-23-23, Document No. 5, Affidavit on the Proprietary Documents of the Application of the Model No. JRF-90Y-950K Project stage: Other ML23058A2552023-02-20020 February 2023, 23 February 2023, 27 February 2023, 2 March 2023 Response to Request for Supplemental Information - Revalidation of the Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. Jrf 90Y-950K (Docket No. 71-3036) Project stage: Request ML23090A0022023-02-23023 February 2023 Part 2 - Request Response, Corrected Page 47 in Correction Table of Document No. 4-1 Project stage: Other ML23058A2852023-02-23023 February 2023 Part 1 - Transmittal Letter Dated 2/23/23 from Russell Neely (Edlow International) to Rick Boyle (Dot), Responses of Request for Supplemental Information from NRC on Completeness of the Application for the Model No. JRF-90Y-950K (J/2043/B(U Project stage: Supplement ML23058A2872023-02-23023 February 2023 Part 1-Response, Acceptance Review, 2/23/23, Document No. No. 1-1 (Non-Proprietary), Japanese Certificate of the Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K (English Version) Issued on May 23, 2022 Project stage: Other ML23058A2792023-02-23023 February 2023 Part 1-Response, Acceptance Review, 2/23/23, Document No. 2-1 (Non-Proprietary) Safety Analysis Report, Application of Design Approval for the Model No. JRF-90Y-950K (J/2043/B(U)F) Project stage: Other ML23058A2832023-02-23023 February 2023 Part 1 - Response Acceptance Review, 02/23/2023, Document No. 4-1 (Non-Proprietary) Comparison Table of SAR for Type JRF-90Y-950K Project stage: Other ML23058A2812023-02-23023 February 2023 Part 1-Response Acceptance Review, 2-23-23, Document No. No. 3-1 (Non-proprietary), Summary of Change of SAR for JRF-90Y-950K Project stage: Other ML23059A2522023-02-27027 February 2023 Part 2-Response Acceptance Review, 2-27-23, Updated Document No. 4-1 (Non-proprietary) Comparison Table of SAR for Type JRF-90Y-950K Project stage: Other ML23059A2542023-02-27027 February 2023 Part 2 - Transmittal Letter Dated 2/27/23 from Russell Neely (Edlow International) to Rick Boyle (Dot), Responses of Request for Supplemental Information, Completeness of the Application for the Model No. JRF-90Y-950K (J/2043/B(U)F) Project stage: Supplement ML23061A1862023-03-0202 March 2023 Part 3 - Transmittal Letter Dated 3/2/23 from Rick Boyle (DOT) to Norma Garcia Santos (Nrc), Responses to Request for Supplemental Information, Application for the Model No. JRF-90Y-950K (J/2043/B(U)F) Project stage: Supplement ML23061A1852023-03-0202 March 2023 Part 3 - 03/02/2023, Comparison Table for the Applications for 2020 (J/170/B(U)F-96; Kyoto), 2021 (J/2039/B(U)F; Kyoto), and 2022 (J/2043/B(U)F; Jaea), Model No. JRF-90Y-950K (J/2043/B(U)F) Project stage: Other ML23067A4412023-03-16016 March 2023 Application for the Japanese Certificate of Competent Authority No. J/2043/B(U), Revision 2, Model No. JRF-90Y-950K - Accepted for Review - CAC No. 001794 and EPID No. L-2023-DOT-0000 Project stage: Other ML23160A0872023-04-11011 April 2023 Email Dated 4/11/23 from Rneely (Edlow) to Rboyle (DOT)-Confirmation of Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K, as Public Records Project stage: Other ML23104A4452023-05-0101 May 2023 Letter to R. Boyle Request for Revalidation of Japanese Certificate of Approval J/2043/B(U)F for the JRF-90Y-950K Package- Request for Additional Information, Docket 71-3036 Project stage: RAI ML23136B1682023-05-10010 May 2023 Letter from Michihiro Kaka (Japan Atomic Energy Agency or Jaea) to Norma Garcia Santos (NRC) Response to the Request for Additional Information for the Revalidation of Japanese Certificate of Approval J/2043/B(U)F for the Model No. JRF-90Y- Project stage: Request ML23136B1662023-05-10010 May 2023 Email from R. Boyle (DOT) to N. Garcia (NRC) Response to the Request for Additional Information for the Revalidation of Japanese Certificate of Approval J/2043/B(U)F for the Model No. JRF-90Y-950K Package, Docket 71-3036 Project stage: Request ML23136B1672023-05-11011 May 2023 Letter from Richard W. Boyle (DOT) to Norma Garcia Santos, Response to the Request for Additional Information for the Revalidation of Japanese Certificate of Approval J/2043/B(U)F for the Model No. JRF-90Y-950K Package, Docket 71-3036 Project stage: Request ML23160A0822023-06-0505 June 2023 Email 1 (Transmittal of Comments) 6/5/23 from Rneely (Edlow) to Ngarcia Santos (Nrc), R Boyle (Dot), and Msumrall (DOT)-Courtesy Proprietary Review SER, Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Other ML23160A0812023-06-0505 June 2023 Email 2 (Corrected Dated Comments) 6/5/23 from Rneely (Edlow) to Ngarcia Santos (Nrc), R Boyle (Dot), and Msumrall (DOT)-Courtesy Proprietary Review SER, Japanese Certificate of Competent Authority No. J/2043/B(U)F, Model No. JRF-90Y-950K Project stage: Other ML23152A2042023-06-13013 June 2023 Safety Evaluation Report for the Revalidation of the Japanese Certificate of Competent Authority No. J/2043/B(U)-96 for the Model No. JRF-90Y-950K Project stage: Approval ML23152A2052023-06-13013 June 2023 Transmittal Letter for the Revalidation of the Japanese Certificate of Competent Authority No. J/2043/B(U)-96 for the Model No. JRF-90Y-950K Project stage: Other ML23159A2672023-06-13013 June 2023 Approval of the Request for Withholding Information from Public Disclosure of the Application for Japanese Certificate of Competent Authority No. J/2043/B(U), Model No. JRF-90Y-950K Package (Docket No. 71-3036) Project stage: Withholding Request Acceptance 2023-02-27
[Table View] |
Text
1 Comparison of 2020 Version of Kyoto SAR and 2021 Version of Kyoto SAR vs NEW 2022 version of JAEA SAR Comparison Table Chapter J/170/B(U)F-96 (2020 version of Kyoto)
(USA/0835/B (U) F-96, Rev. 0 Expires 4/26/25)
Chapter J/2039/B(U)F (2021 version of Kyoto)
(USA/0841/B (U) F, Rev. 0 Expires 12/8/26)
NEW J/2043/B (U) F (2022 version of JAEA)
Entirety of SAR Contents of Fuel Information Kyoto University Fuel JAEA Fuel:
JMTR, JRR-3, JRR-4 and JMTRC Entirety of SAR Contents of Fuel Information Kyoto University Fuel Spectrum Converter (Kyoto)
Contents of Fuel Information FUEL CONTENTS PREVIOIUSLY AUTHORIZED - NO CHANGE:
Fuel of JAEA Previously Authorized in J/170/B (U) F-96:
JRR-3, JMTR, and JMTRC FUEL CONTENTS DELETED:
Kyoto University Fuel Spectrum Converter (Kyoto)
JMTR MEU Fuel JMTRC HEU Follower Fuel JRR-4 Fuel N/A N/A
()-A (14)
The information added to this report is as follows:
Planned years of use (60 Years)
PLANNED YEARS OF USE PREVIOUSLY AUTHORIZED - NO CHANGE:
Planned Years of Use Previously Authorized in J/2039/B (U) F (Planned years of use (60 Years))
2
()-A.4.4
()-F Hoisting accessory:
Consideration of fatigue of hoisting accessory A chapter (II)-F: Consideration of Aging of Nuclear Fuel Package was added.
HOISTING ACCESSORY PREVIOUSLY AUTHORIZED - NO CHANGE:
Hoisting accessory:
Consideration of fatigue of hoisting accessory was Previously Authorized in J/2039/B (U) F AGING CHAPTER PREVIOUSLY AUTHORIZED - NO CHANGE:
A chapter (II)-F: Consideration of Aging of Nuclear Fuel Package was previously authorized in J/2039/B (U) F.
()-A Structural Analysis A.5.3 Drop test of fuel plate Kyoto University N/A STRUCTURAL ANALYSIS PREVIOUSLY AUTHORIZED - NO CHANGE:
Structural Analysis Previously Authorized in J/170/B (U) F-96.
Deleted: Drop test of fuel plate (Kyoto University) was deleted.
()-A Structural Analysis A.10.10 Mechanical characteristic of JRR-4B Fuel Plate Deleted Deleted STRUCTURAL ANALYSIS PREVIOUSLY AUTHORIZED - NO CHANGE:
Structural Analysis Previously Authorized in J/170/B (U) F-96.
Deleted: Mechanical characteristic of JRR-4B Fuel Plate
3
()-B Thermal Analysis
()-B THERMAL ANALYSIS PREVIOUSLY AUTHORIZED - NO CHANGE:
Thermal Analysis previously authorized in J/170/B (U) F-96.
(II)-C Containment Analysis CONTAINMENT ANALYSIS - CHANGE IN LEAK RATE Change in Leak Rate Table. C.12, Table C.15:
Because certain JMTRC fuel used for the leak rate calculation was deleted, another previously authorized JMTRC fuel element was used for the leak rate calculation, and consequently the leak rate changes from both the J/170/B (U) F-96 and J/2039/B(U)F SARs. However, the leak rate under the accident conditions remains less than the reference value, consistent with the previous authorizations.
()-D Shielding Analysis
()-B SHIELDING ANALYSIS PREVIOUSLY AUTHORIZED - NO CHANGE:
Shielding Analysis previously authorized in J/170/B (U) F-96.
4
()-E Criticality Analysis Target of criticality evaluation (Fig.E.8 Fuel of Kyoto university Fuel of JAEA:
JMTR, JRR-3, JRR-4 and JMTRC
()-E Target of criticality evaluation Fuel of Kyoto university Spectrum converter CRITICALITY ANALYSIS PREVIOUSLY AUTHORIZED - NO CHANGE:
Target of criticality evaluation (Fig.E.8 Fuel of JAEA was target of criticality evaluation and Previously Authorized in J/170/B (U) F-96:
JRR-3, JMTR and JMTRC Regulations for the Safe Transport of Radioactive Material 2012 Entirety of SAR 2018 2018 PREVIOUSLY AUTHORIZED IN J/2039/B (U) F - NO CHANGE.