ML22354A258

From kanterella
Revision as of 00:05, 21 January 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
10_RBS-2022-12 Post-Exam Comments
ML22354A258
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/15/2022
From: Heather Gepford
NRC/RGN-IV/DORS/OB
To:
Entergy Operations
References
Download: ML22354A258 (1)


Text

RB-2022, Written Exam Analysis The class consisted of 12 students (8 ROs, 2 Upgrade SROs and 2 Instant SROs).

Question 67 6/12 missed RBS has reviewed the question and believes it to be valid and has only one correct answer. This K/A was presented during the training program.

High missed question due to students attention to detail and level of knowledge.

Students were weak on maximum amount of time before the Change Notice (CN) should be incorporated in accordance with RBNP-001. Most students confused the 180 day requirement with 14 days which is the time required to receive all reviews for approval on the Change Notice (CN). The requirement for incorporating is 180 days from the final approval.