ML22202A009

From kanterella
Revision as of 19:37, 11 November 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
R. E. Ginna Nuclear Power Plant - Submittal of Integrated Initial License Training Examination Materials
ML22202A009
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/21/2022
From: Blankenship J
Constellation Energy Generation
To: David Lew
NRC Region 1, Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML22202A009 (1)


Text

The Attachments to this letter contain NRC Examination Material which should be withheld from public disclosure for 2 years following the Examination per 10 CFR 2.390, 55.49, NUREG-1021, and OLMC-520. Upon separation, this cover letter is decontrolled.

James D. Blankenship Site Vice President R.E. G1nna Nuclear Power Plant 1503 Lake Rd 315 791 5205 Office Constellation ~ James.blankensh1pconstellat1on.com www.constellation.com July 21 , 2022 David Lew Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road Suite 102 King of Prussia, PA 19406-1415 RE. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244

Subject:

Submittal of Integrated Initial License Training Examination Materials

Reference:

(1) Letter from Donald E. Jackson (NRC) to David Rhoades (Exelon Nuclear), RE.

Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations, dated January 21, 2022

Dear Mr. Lew:

Below is a list of the examination materials, which RE. Ginna is submitting in support of the initial license examination scheduled for October 17, 2022, through October 25, 2022, at R E. Ginna Station wh ich have been sent to the Chief Examiner, Joseph DeMarshall.

This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.

These examination materials have been developed in accordance with NUREG-1021 , "Operator Licensing Examination Standards for Power Reactors" , Revision 12. Please note that reference materials are attached to each individual examination question or item.

Some minor modifications have been made to the Integrated Examination Outline with regards to the operational scenarios in order to improve balance and content. These changes improve examination quality and are in compliance with NUREG-1021 , "Operator Licensing Examination Standards for Power Reactors", Revision 12.

Some modifications or adjustments to the examination material may be required due to procedural changes.

In accordance with NUREG-1021 , Revision 12, Section ES-1.3, "Examination Security", as amplified by OLMC-520, Section C.5, "Delayed Release of Examination Material", please ensure that these materials are withheld from public disclosure for two (2) years after the examinations are complete.

SRRS: 30 .100; Retain th is document until all regulatory actions associated with the exam are complete, at wh ich time it may be discarded.

The Attachments to this letter contain NRC Examination Material which should be withheld from public disclosure for 2 years following the Examination per 10 CFR 2.390, 55.49, NUREG-1021, and OLMC-520. Upon separation, this cover letter is decontrolled.

Should you have any questions concerning this letter, please contact the Manager, Site Regulatory Assurance, Christopher Bradshaw, at 315-791-3246. For questions concerning examination materials, please contact the Regulatory Exam Author, Donald Dean, at 315-791-5315.

Respectfully, James D. Blankenship Site Vice President SRRS : 30.100; Retain this document until all regulatory actions associated with the exam are complete, at which time it may be discarded.

The Attachments to this letter contain NRC Examination Material which should be withheld from public disclosure for 2 years following the Examination per 10 CFR 2.390, 55.49, NUREG-1021, and OLMC-520. Upon separation, this cover letter is decontrolled.

Enclosures:

Hard copy Enclosures via FedEx to J. DeMarshall, Chief Examiner, NRC Region I Form 3.2-1, Administrative Topics Outline for RO Form 3.2-1, Administrative Topics Outline for SRO Form 3.2-2, Control Room/In-Plant Systems Outline Form 4.1-PWR, Pressurized-Water Reactor Examination Outline (RO and SRO)

(Provided by NRC)

Form 4.1-COMMON, Generic Knowledge and Abilities Outline (Tier 3) and Theory (Tier

4) (Provided by NRC)

Form 4.2-1, RO/SRO Composite Examination, with references attached Form 3.2-3, Control Room / In-Plant Job Performance Measures, with references attached Form 3.2-3, Administrative Topic Job Performance Measures, with references attached Form 3.3-1, Scenario Outline, Scenario #1 Form 3.3-2, Integrated Plant Operation Scenario Guide, Scenario #1 Form 3.3-1, Scenario Outline, Scenario #2 Form 3.3-2, Integrated Plant Operation Scenario Guide, Scenario #2 Form 3.3-1, Scenario Outline, Scenario #3 Form 3.3-2, Integrated Plant Operation Scenario Guide, Scenario #3 Form 3.3-1, Scenario Outline, Scenario #4 Form 3.3-2, Integrated Plant Operation Scenario Guide, Scenario #4 Completed Checklists:

Form 1.3-1, Examination Security Agreements Form 2.3-2, Operating Test Quality Checklist Form 2.3-4, Written Examination Quality Checklist Form 3.4-1, Events and Evolutions Checklist Form 4.1-1, Record of Rejected Knowledge and Abilities (Provided by NRC) cc: Mr. D. Jackson, Chief, NRC Operator Licensing Branch (w/o enclosures)

Mr. J. DeMarshall, Chief Examiner, NRC Region I (w/ Hard copy Enclosures via FedEx)

Mr. V. Sreenivas, Ginna Station Project Manager, NRR (w/o enclosures)

Mr. J. Schussler, NRC Ginna Sr Resident Inspector (E-mail, w/o enclosures)

SRRS: 3D.100; Retain this document until all regulatory actions associated with the exam are complete, at which time it may be discarded.