HL-5127, Ei Hatch Nuclear Plant Annual Environ Surveillance Rept for 1995

From kanterella
Revision as of 00:37, 24 September 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ei Hatch Nuclear Plant Annual Environ Surveillance Rept for 1995
ML20101J499
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/31/1995
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ENV-96-053, ENV-96-53, HL-5127, NUDOCS 9604020014
Download: ML20101J499 (89)


Text

h )

Georgia Power Company 40 inverness Center Parkway Post Office Bor 1295 -

Birmingham, Alabama 35201 Telophone 205 877 7279 J. T. Beckham, Jr.

m Vice President - Nuclear GeorniaPower V

Ha1ch Project te soutran chx*c systwn l

March 26, 1996 Docket Nos. 50-321 HL-5127 50-366 l l

1 U. S. Nuclear Regulatory Commission ATTN: Document ControlDesk Washington, D.C. 20555 j l

Edwin I. Hatch Nuclear Plant Annual Environmental Surveillance Report l l

Gentlemen:

In accordance with the Plant Hatch Units 1 and 2 Environmental Technical Specifications i (Appendix B to Facility Operating Licenses DPR-57 and NPF-5), Section 5.6.1, Georgia l Power Company is submitting the enclosed Environmental Surveillance Report for 1995. j l

If you have any questions in this regard, please contact this office at any time.

l Sincerely, l J. T. Beckham, Jr. I l

KWB/ahl ENV-96-053 i

Enclosure:

Annual Environmental Surveillance Report for 1995 cc: Georgia Power Comoany Mr. H. L. Sumner, Nuclear Plant General Manager .

Mr. C. M. Hobson, Manager - Environmental Affairs l NORMS U. S. Nuclear Regulatory Commission. Washington. D.C.

Mr. K. N. Jabbour, Licensing Project Manager - Hatch U. S. Nuclear Regulatorv ' Commission. Region 11

}

l Mr. S. D. Ebneter, Regional Administrator Mr. B. L. Holbrook, Senior Resident Inspector - Hatch l r c.w r n 9604020014 951231 I l

PDR ADOCK 05000321 R PDR .

Enclosure Edwin I. Hatch Nuclear Plant - Units 1 and 2 Annual Environmental Surveillance Report Specification This report is submitted in accordance with Section 5.6.1 of the Edwin I. Hatch Nuclear Plant Environmental Technical Specifications, Appendix B to Facility Operating Licenses DPR-57 and NPF-5. The report summarizes the environmental activities for Units 1 and 2 for the period January 1,1995, through December 31,1995.

By letter dated, December 19,1995, the NRC approved Georgia Power Company's request i to replace the Environmental Technical Specifications with an Environmental Protection Plan (nonradiological) and to revise Operating Licenses DPR-57 and NPF-5 to reflect these i changes. Amendment No.199 to Facility Operating License DPR-57 and Amendment No.

140 to Facility Operating License NPF-5 replaced the existing Appendix B, " Environmental Technical Specifications (ETS)," with a new Appendix B, " Environmental Protection Plan."

Implementation of the amendments was completed by February 16,1996, as required. The changes associated with the amendments are administrative in nature, altering only the i format and location of programmatic controls and procedural details relative to nonradiological environmental monitoring. Reporting for environmental matters occurring ,

subsequent to February 16,1996, will be performed in accordance with the requirements of I the new Environmental Protection Plan.

R. sporting Requirements A. Summaries, Analyses, and Interpretations of the Results of the Environmental  ;

4 Monitoring Activities for the Report Period There were no nonradiological environmental monitoring activities performed at Plant Hatch during the report period, beyond those performed in accordance with NPDES Permit No. GA0004120 and referenced in Section H below.

B. Comparisons with Preoperational Studies, Operational Controls, and Previous Monitoring Reports These comparisons were not necessary because no nonradiological monitoring programs were conducted during the report period, beyond those performed in accordance with NPDES Permit No. GA0004120 and referenced in Section H below.

C. An Assessment of the Observed Impacts of Plant Operation on the Environment No significant environmental impacts were associated with plant operation during the ,

report period.  !

E-1 IIL-5127 ENV-96-053

i l

Enclosure I Annual Environmental Surveillance Report D. Environmental Technical Specifications Noncompliance and Corrective Actions l Taken l No instances of ETS noncompliance occurred during the report period.

1 E. Changes to Federal and State Permits and Certificates l

In 1995, no changes were made in Federal and State permits or certificates relative to j the requirements of the Plant Hatch ETS Section 5.6.3.2.  !

F. Changes in Station Design or Operation that Could Involve an Environmental Impact or Change in the Findings of the Final Environmental Statement l

By letter dated July 21,1995, the NRC issued an environmental assessment and finding of no significant impact based on review of the environmental assessment provided by Georgia Power Company in support of a request for license amendments to increase the licensed core thermal power. The amendments, which proposed an increase in licensed core thermal power from 2436 MWt to 2558 MWt, were approved on August 30,1995.

No changes in the findings of the final Environmental Statement resulted from the ,

amendments. j l

G. Changes in ETS On December 19,1995, the NRC issued Amendment No.199 to Facility Operating License DPR-59 and Amendment No.140 to Facility Operating License No. NPF-5, which replaced the existing Appendix B, " Environmental Technical Specifications,"

with an " Environmental Protection Plan." The amendments were implemented by February 16,1996, as requested.

l H. Copies of All Reports Regarding Station Discharges Made in Accordance with NPDES Permit No. GA0004120 Copies of the Plant Hatch 1995 quarterly NPDES Operational Monitoring Reports and the 1995 Flow Monitoring and Characterization Study are included as Attachments 1 and 2, respectively.

E-2 IIL-5127 ENV-96-053

i l

ATTACHMENT 1 Edwin I. Hatch Nuclear Plant - Units 1 and 2 Annual Environmental Surveillance Report

  • 1995 Quarterly NPDES Operational Monitoring Reports i

1 l

l 3

G l

HL-5127 ENV-96-053 l

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company ' From: 01-01-95 Plant E.1. Hatch - To: 03-31-95 t P.O. Box 4545 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 l

l Discharge Location: O1G - Low Volume Waste (Neutralization Tank) l Type of Sample: Grab Grab i Frequency of Analysis: 2/ Month 2/ Month .

PCS Code: (530) (556) [

l-Parameter: Suspended Solids mg/l (TSS) Oil & Grease mg/l (O&G)  :

L Limits: Avg. 30 t

Avg. 15  ;

Max. 100 Max. 20 Dater MG/L MG/L  !

l l 01-03-95 3.0 1.0-  ;

01-16-95 7.6 1.9 02-13-95 1.8 1.4 02-22-95 37.0 13.8 i

[ i 03-06-95 1.0 1.0 03-22-95 22.0 1.9 l i

! Month of January:

. No. of Samples: 2 2 I l-Average Value: 5.3 1.5 l Max. Value: 7.6 1.9 Limits Exceeded: 0 0

! Month of February:

No. of Samples: 2 2 Average Value: 19.4 7.6 Max. Value: 37.0 13.8 i Limits Exceeded: 0 0

?

Month of March:

No. of Samples: 2 2 )

Average Value: 11.5 1.5

Max. Value: 22.0 1.9  ;

i >

Limits Exceeded
0 0 4

i RLS1555283

QUARTERLY OPERATIONAL MONITORING REPORT l i

-_ Georgia Power Company From: 01-01-95 Plant E.1. Hatch '

To: 03 31-95  :

P.O. Box 4545 '

Atlanta, Georgia .30302 l NPDES Permit Number: GAOOO4120 '

Discharge Location:

O1H - Low Volume Waste (Pressure Filters Backwash)

Type of Sample: Grab Grab Frequency of Analysis: 1/ Quarter. 1/ Quarter '+

PCS Code: (530)' (556) I t

Parameter: Suspended Solids (TSS)

Oil & Grease. (O&G)  !

Limits: Avg. '30 . Avg. 15  ;

t Max. 100 Max. 20  :

Date: MG/L MG/L i 02-21-95 1.3 0 l

i

?

f Month of January:

No, of Samples: 0 0 Average Value: --- ...

l Max, Value: ---

--- l Limits Exceeded: --- ---

Month of Februarv_:

No. of Samples: 1 1 Average Value: 1.3 0 Max, Value: 1.3 0 .

Limits Exceeded: 0 0 Month of March:

No. of Samples: 0 0 Average Value: ---

Max. Value
--- ---

Limits Exceeded: --- --- -t d

2 RLS1555284

i OUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 01-01-95 l Plant E.I. Hatch - To: 03 31-95  :

P.O. Box 4545  ;

p Atlanta, Georgia 30302 NPDES Permit Number: GA0004120  !

L Dischdrge Location: 01A --Unit One Cooling Tower Blowdown Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl/ Grab Mltpl/ Grab Mltpl/ Grab Grab- Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium l l rel & avg. max. max.

(mg/1) (mg/1) (min) (mg/1) (mg/1) (mg/1) l Limits: 0.2 0.5 120 N/A 1.0 0.2 I PCS Code: 50064 50064 81400 50060 1092 1034  !

Date:

01-04-95 0 0 0 0 01-05-95 -- -- -- --

0.03 0.0 )

01-11-95 01-18-95 0

0 0

0 0

0 0 0 --

j 01-27-95 0 0 0 0 -- --

l 02-01-95 0 0 0- 0 -- --

02-08-95 0 0 0 0 -- --

l 02-15-95 0 0 0 0 -- --

02-22-95 0 0 0 0 -- --

03-01-95 0 0 0 0 -- --

03-08-95 0 0 0 0 -- --

l 03-15-95 0 0 0 0 -- --

03-29-95 0 0 0 0 -- --

Month of January:

No. of Samples: 4- 4 4 4 1 1 Avg. Value: 0 0 0 0 0.03 0.0 Max. Value: 0 0 0 0 0.03 0.0 Limits Exceeded: 0 0 0 0 0 0 l Month of February:

No. of Samples: 4 4 4 4 0 0 j Avg. Value: 0 0 0 0 --- ---

l Max. Value: 0 0 0 0 ---

[ Limits Exceeded: 0 0 0 0 --- ---

I i

3 RLS1555285 l

-=

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 01-01 95 Plant E.I. Hatch To: 03-31-95 P.O. Box 4545 Atlanta, Georgia 30302 NPDES Permit Number: GAOOO4120 Month of March:

No. of Samples: 4 4 4 4 0 0 Avg. Value: 0 0 0 0 --- ---

Max. Value: 0 0 0 0 --- ---

Limits Exceeded: 0 0 'O O --- ---

1 i

l I

4 RLS1555286 i

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 01-01-95 Plant E.I. Hatch To: 03-31-95 P.O. Box 4545 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Discharge Location: 02A - Unit Two Cooling Tower Blowdown Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl/ Grab Mitpl/ Grab Mltpl/ Grab -Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/l) (mg/l) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 Date.

01-04-95 0 0 0 0 --- ---

01-05-95 -- -- -- --

0.2 0.0 01-11-95 0 0 0 0 --- ---

01-18-95 0 0 0 0 --- ---

01-27-95 0 0 0 0 --- ---

02-01-95 0 0 0 0 --- ---

02-08-95 0 0 0 0 --- ---

02-15-95 0 0 0 0 --- ---

02-22-95 0 0 0 0 --- ---

03-01-95 0 0 0 0 --- ---

03-08-95 0 0 0 0 --- ---

03-15-95 0 0 0 0 --- ---

03-29-95 0 0 0 0 --- ---

Month of Januarv_-

No. of Samples: 4 4 4 4 1 1 Avg. Value: 0 0 0 0 0.2 0.0 Max. Value: 0 0 0 0 0.2 0.0 Limits Exceeded: 0 0 0 0 0 0 Month of Februarv_- i No. of Samples: 4 4 4 4 0 0 Avg. Value: 0 0 0 0 --- ---

Max, Value: .0 0 0 0 ---

Limits Exceeded: 0 0 0 0 --- --- i 1

5 RLS1555287 l

l

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.I. Hatch From: 01-01-95 P.O. Box 4545 To: 03-31 95 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Month of March-No. of Samples: 4 4 4 4 0 0 Avg. Value: 0 0 0 0 --- ---

Max, Value: 0 0 0 0 --- ---

Limits Exceeded: 0 0 0 0 --- ---

l i

l 6 RLS1555288

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 01-01-95 Plant E.1. Hatch To: 03-31 95 ,

P.O. Box 4545 '

Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 l ,

l Discharge Location: 01B - Unit One Cooling Water Overflow Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl/ Grab {

Mltpl/ Grab Mltpl/ Grab Grab Grab '

Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/l) (mg/l) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 Date:

01-09-95 -- -- -- --

.02 0.0 J

Overflow did not occur during period of chlorination.

l Month of January:

No. of Samples: 0 0 0 0 1 1 Avg. Value: -- -- -- --

.02 0.0 Max. Value: -- -- -- --

.02 0.0 Limits Exceeded:-- -- -- --

0 0 Month of February:

I No. of Samples: 0 0 0 0 0 0 l

I Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- -- --  !

Limits Exceeded:-- -- -- -- -- --

Month of March-l No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- -- --

Limits Exceeded:-- -- -- -- -- --

7 RLS1555289 l

l QUARTERLY OPERATIONAL MONITORING REPORT l Georgia Power Company From: 01-01-95 Plant E.l. Hatch To: 03-31-95 P.O. Box 4545 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Discharge Location: O1I - Unit One Cooling Tower Basin Drains Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Typer Mltpl Mltpl Mltpl Grab Grab Grab Grab Grab  !

Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/l) (mg/l) (min) (mg/1) (mg/1) (mg/1)  !

Limits: 0.2 0.5 120 N/A 1.0 0.2 )'

PCS Code: 50064 50064 81400 50060 1092 1034 Date:

I l

i This outfall was not utilized during the reporting period.

Month of January:

1 No. of Samples: 0 0 0 0 0 0 1 Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- -- --

Limits Exceeded:-- -- -- -- -- --

Month of Februarv:

No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- -- --

Limits Exceeded:-- -- -- -- -- --

l l

Month of March-No. of Samples: ,0 0 0 0 0 , O Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- -- --

Limits Exceeded:-- -- -- -- -- --

8 RLS1555290

. . _ . . . . _ _ _ _ . . _ . _ . _ . _ _ _ . _ . _ _ _ _ . . ~ _ - - _ . . .. _ _.___ _

l

\

QUARTERLY OPERATIONAL MONITORING REPORT I

.1 Georgia Power Company From: 01'-01 95 l

Plant E.1. Hatch To: 03-31 95 l P.O. Box 4545

' Atlanta, Georgia ' 30302 NPDES Permit Number: GAOOO4120 Discharge Location: 01J - Unit One Cooling Tower Basin Overflows to Storm Drains Location: Blowdown. Blowdown Blowdown Tower Basin Tower Basin '

Type: Mltpl/ Grab Mitpl/ Grab Mitpl/ Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter i Parameter: Fac Fac max. Total Time TRC Zinc Chromium j rel & avg. max. max.

(mg/1) (mg/l) (min) (mg/1) (mg/1) (mg/1) L Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 Dater I

l This outfall was not utilized during the reporting period. )

l 1

^

l I i l

l Month of January l No. of-Samples: 0 0 0 0 0' O Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- -- --

Limits Exceeded: -- -- -- -- -- --

Month of Februarv:

No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- -- --

Max, Value: -- -- -- -- -- --

Limits Exceeded: -- -- -- -- -- --

l Month of Marche i No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- -- --

Max Value: -- -- -- -- -- --

Limits Exceeded: -- -- -- -- -- --

i ,

9 RLS1555291

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company-Plant E.1. Hatch From: 01-01 95 P.O. Box 4545 To: 03-31 95 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Discharge Location: 02B - Unit Two Cooling Water Overflow To Storm Drains Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl/ Grab Mltpl/ Grab Mltpl/ Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/l) (mg/l) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 Date: j 01-05-95 - - - -

0.2 0.02 Discharge did not occur during period of chlorination. l j

Month of Januarv_:

No. of Samples: 0 0 0 0 1 1 Avg. Value: --- --- --- ---

0.2 .02 Max. Value: --- --- --- ---

0.2 .02 Limits Exceeded:--- --- --- ---

0 0 l

Month of Februarvt No. of Samples: 0 0 0 0 0 0 l Avg. Value: --- --- --- --- -- --

Max. Value: --- --- --- --- -- --

Limits Exceeded:--- --- --- --- -- --

Month of March i

No. of Samples: 0 0 0 0 0 0 Avg. Value: --- --- --- --- --- --

Max. Value: --- --- --- --- --- --

Limits Exceeded:--- --- --- --- --- --

l 10 RLS1555292 l

f QUARTERLY OPERATIONAL MONITORING REPORT i

Georgia Power Company From: 01-01 95 Plant E.I. Hatch ' ,

To: 03 31 95 P.O. Box 4545 Atlanta, Georgia 30302 NPDES Permit Number: GAOOO4120 Discharge Location: 02C - Unit Two cooling water overflow Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin -

Type: Mltpl/ Grab Mltpl/ Grab Mltpl/ Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter  ;

Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/l) (mg/l) (min) (mg/1) (mg/1) (mg/1) I Limits: 0.2 '0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034  !

Date i This outfall was not utilized during the reporting period.

i i

Month of January:

No. of Samples: 0 0 0 0 0 0 Avg. Value: --- --- --- --- --- ---

Max. Value: --- --- --- --- --- ---

Limits Exceeded:--- --- --- --- --- ---

Month of Februarv_ :

No. of Samples: 0 0 0 0 0 0 Avg. Value: --- --- --- --- --- ---

Max. Value: --- --- --- --- --- ---

Limits Exceeded:--- --- --- --- --- ---

Month of March No. of Samples: 0 0 0 0 0 O Avg. Value: --- --- --- --- -- --

Max. Value: --- --- --- --- -- --

Limits Exceeded:--- --- --- --- -- --

11 .RLS1555293

l l

QUARTERLY OPERATIONAL MONITORING REPORT l Georgia Power Company From: 01-01-95 I Plant E.1. Hatch To: 03-31 95

! P.O. Box 4545 l Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 l

Discharge Location: 01E - Low Volume Waste (Liquid Radwaste System Unit One)

Type of Sample: Grab Frequency of Analysis: 2/ Month PCS Code: (530) (556)

Parameter: TSS O&G Nitrite (Chill Water) Releases mg/l mg/l to discharge point OSN 01 Limits: Avg. 30 Avg. 15 Initial Amount Dilution Final Max.100 Max. 20 Conc. Drained Flow rate Conc.

(ppm) (gallons) (gpm) (ppb)

Date:

01-04-95 1.0 1.0 -- -- -- --

01-16-95 23.0 12.2 -- -- -- --

02-06-95 13.0 0.5 -- -- -- --

02-20-95 6.0 7.8 -- -- -- -- I 03-07-95 13.5 0.0 -- -- -- -- I 03-20-95 16.0 6.6 -- --- --- --

I i

l l

Month of January:

No. of Samples 2 2 0 0 0 0 Average Value: 12 6.6 -- -- -- --

Max. Value 23 12.2 -- -- -- --

Limits Exceeded: 0 0 -- -- -- --

Month of February:

No. of Samples 2 2 0 0 0 0 Average Value: 9.5 4.2 -- -- -- --

Max. Value 13.0 7.8 -- -- -- --

Limits Exceeded: 0 0 -- -- -- --

l Month _pf March:

l No. of Samples 2 2 0 0 0 0 Average Value: i4.8 3.3 -- -- --

Max. Value 16.0 6.6 -- -- -- --

Limits Exceeded: 0 0 -- -- -- --

l 12 RLS1555294 i

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 01-01 95 -

Plant E.1. Hatch To: 03-31-95 P.O. Box 4545 Atlanta, Georgia' 30302 NPDES Permit Number: GAOOO4120 Discharge Location: 02E - Low Volume Waste (Liquid Radwaste System Unit Two)

  • Type of Sample: Grab '

quency of Analysis: 2/ Month  !

as Code
(530) (556) l Parameter: TSS O&G Nitrite,(Chill Water) Releases

, mg/l mg/l to discharge point OSN 02 Limits: Avg. 30 Avg. 15 Initial Amount Dilution Final 3 Max.100 Max. 20 Conc. Drained Flow rate Conc.

(ppm) (gallons) (gpm) (ppb) 01-04-95 1.2 0.4 -- -- -- --

01-17-95 0.3 0.4 -- -- -- --

02-06-95 1.0 0.0 -- -- -- --

02-21 0.4 0.0 -- -- -- --

]

03-06-95 1.4 1.0 -- -- -- --

03-20-95 1.2 1.7 -- -- -- --

Month of January:

No. of Samples 2 2 0 0 0 0 Average Value: 0.8 0.4 -- -- --- --

Max. Value 1.2 0.4 -- -- --- --

Limits Exceeded: 0 0 -- -- --- --

Month of Februarv_t No. of Samples 2 2 0 0 0 0 Average Value: 0.7 0.0 -- -- -- --

Max. Value 1.0 0.0 -- -- -- --

Limits Exceeded: 0 0 -- -- -- --

Month of March:

No. of Samples 2 2 0 0 p 0 Average Value: 1.3 1.4 -- -- -- --

Max. Value 1.4 1.7 -- -- -- --

Limits Exceeded: 0 0 -- -- -- --

13 RLS1555295

1 I

1 l

QUARTERLY OPERATIONAL MONITORING REPORT l

Georgia Power Company From: 01-01-95 Plant E.1. Hatch To: 03-31-95 P.O. Box 4545 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Sewage Treatment Plant Sludge Disposal (lbs/ day / month)

January February March Date Ibs Date lbs Date 1bs No sludge removed No sludge removed No sludge removed i during the month during the month' during the month of January of February of March i

i i

l 1

l I

y RLS1555296

l QUARTERLY OPERATIONAL MONITORING REPORT i Georgia Power Company From: 01 01-95 Plant E.1.' Hatch P.CL Box 4545 .

To: 03 31-95 !'

Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 )

Discharge Location:

01 - Combined. Plant Waste Streams Unit One Frequency of Analysis: 1/ Week Type of Samples: {

In Situ Grab Grab Grab Parameter: Temperature T.R.C. F.A.C. pH Limits: Degree F N/A N/A Min. 6.0/ Max. 9.0  ;

PCS Code: (11) (50060) (50064) (400)

Date:

01-02-95 73 0.0 0.0 7.4

.01-09-95 73 0.0 0.0 7.6  !

01-16-95 69 0.0 0.0 7.7 '

'01-23-95 73 0.0 0.0 7.7 j 01-30-95 66 0.0 0.0 7.7 l l

02-06-95 64 0.0 0.0 7.7 ,

02-13-95 71 0.0 0.0 7.8  !

02-20-95 72 0.0 0.0 7.6 02-27-95 l 71 0.0 0.0 7.7 03-06-95 176 0.0 00 7.1 03.-13-95 76 0.0 0.0 7.8 03-20-95 75 0.0 0.0 7.5 03-27-95 80 0.0 0. 0- 7.7 Month of Januarv:

No. of Samples 5 5 5 5 Average Value: 71 0.0 0.0 7.6 Max._Value 73 0.0 0.0 7.7 Limits Exceeded: 0 0 0 0 Month of Februarv-No. of Samples 4 4 4 4 Average Value: 70 0.0 0.0 7.7 Max. Value 72 0.0 0.0 7.8 Limits Exceeded: 0 0 0 0 Month of March:

No. of Samples 4 4 4 4 Average Value: 77 0.0 0.0 7.5 Max. Value 80 0.0 0.0 7.8 Limits Exceeded: 0 0 0 0 15 RLS1555297

. . . _m_ . _ . ._ _ _ . . __ __. _ _ _ _ _ . _

l QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 01-01 95  :

Plant E.I. Hatch To: 03 31-95 P.O. Box 4545 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Discharge Location: 02 - combined. Plant Waste Streams ~ Unit Two -

l Frequency of Analysis: 1/ Week Type of samples: In Situ Grab Grab Grab ,

Parameter: Temperature T.R.C. F.A.C. pH Limits: Degree F N/A 'N/A Min. 6.0/ Max. 9.0 j Code: (11) (50060) (50064) (400)

Date:

01-02-95 76 0.0 0.0 8.0 01-09-95 69 0.0 0.0 8.1 01-16-95 69 0.0 0.0 7.7 '

'01-23-95 73 0.0 0.0 7.7 01-30-95 66 0.0 0.0 7.7 F 02-06-95 66- 0.0 0.0 7.7 02-13-95 71 0.0 0.0 7.8 ,

02-20-95 72 0.0 0.0 7.6  !

02-27-95 71 0.0 0.0 7.7 03-06-95 76 0.0 0.0 7.1 03-13-95. 76 0.0 0.0 .7.8  ;

1 03-20-95 73 0.0 0.0 7.6 03-27 80 0.0 0.0 7.7 l Month of Januarve l No. of Samples l 4 4 4 4  !

' Average Value: 89 0.0 0.0 7.4 l Max. Value 91 0.0 0.0 7.9 i Limits Exceeded: 0 0 0 0 I l

Month of February l No. of Samples 5 5 5 5 Average Value: 87 0.0 0.0 7.4 l Max. Value 89 0.0 0.0 7.8 l

Limits Exceeded: 0 0 0 0 i

Month of March:

No. of Samples 4 4 4 4

! Average Value: 76 0.0 0.0 7.6 Max. Value 80 0.0 0.0 7.8 Limits Exceeded: 0 0 0 0 16 RLS1555298 l

. . . - . .. _ .-. . - _ . - . - . - -. . - - _ . ~ . - - ~ ~ . . ~. ._ - ._.

I l QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 01-01-95 Plant E.I. Hatch To: 03 31-95 P.O. Box 4545 Atlanta, Georgia 30302 NPDES Permit Number: GAOOO4120

I. certify under the penalty of law that this document and all' attachments were prepared under my direction or supervision in accordance with a system de. signed to assure that qualified-personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those. persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that

-there are significant penalties for submitting false. information,.

including the possibility of fine and impris6nment for known violations.

I

, W4V.i . ' AA.A A l

H. L. Sumner,.Jr.

l l General Manager

  • l Wuclear Plant l

RLS1555299 17

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.1. Hatch From: 04 01-95 P.O. Box 4545 To: 06-30 95 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Discharge Location: 01G - Low Volume Waste (Neutralization Tank)

Type of Sample: Grab Grab Frequency of Analysis: 2/ Month 2/ Month PCS Code: (530) (556)

Parameter: Suspended Solids mg/l (TSS)

Limits:

Oil & Grease mg/l (O&G)

Avg. 30 Avg. 15 Max. 100 Max. 20.

Date- MG/L MG/L.

04-08-95 0.8 0.0 04-19-95 10.1 0.0 05-15-95 3.5 0.0 05-25-95 6.5 0.0 06-09-95 6.7 1.0 1 06-28-95 27.5 I 0.0 Month of Acril:

No. of Samples: 2 2 Average Value: 5.5 0.0 Max. Value: 10.1 0.0 Limits Exceeded: 0 0 Month of Mav-No. of Samples: 2 2 Average Value: 5.0 0.0 l Max. Value: 6.5 0.0 Limits Exceeded: 0 0 l

Month of June-No. of Samples: 2 2 Average Value: 17.1 0.5 Max. Value: 27.5 0.0 Limits Exceeded: 0 0 1

RLS1556205 1

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.I. Hatch From: 04-01 95 l P.O. Box 4545 To: 06-30-95 Atlanta, Georgia 30302 NPDES Permit Number: GAOOO4120 Discharge Location:

O1H - Low Volume Waste (Pressure Filters Backwash)

Type of Sample: Grab Grab Frequency of Analysis: 1/ Quarter 1/ Quarter PCS Code: (530) (556) i Parameter: Suspended Solids (TSS) l Limits:

Oil & Grease (O&G) l Avg. 30 Avg. 15 l Max. 100 Max. 20  !

Datet MG/L MG/L 05-16-95 0.2 0 Month of Acril-No. of Samples: 0 0 Average Value: ---

Max. Value: ---

Limits Exceeded: ---

Month of Mav- -

No. of Samples: 1 1 Average Value: 0.2 0 Max. Value: 0.2 0 Limits Exceeded: 0 0 Month of June-No. of Samples: 0 0 Average Value: ---

Max. Value: ---

Limits Exceeded: ---

2 RLS1556206

l QUARTERLY OPERATIONAL MONITORING REPORT i i Georgia Power Company Plant E.1. Hatch From: 04-01 95 ;

P.O. Box 4545 To: 06-30-95 Atlanta, Georgia 30302 NPDES Permit Number: GAOOO4120 !

Discharge Location:  !

01A - Unit One Cooling Tower Blowdown  !

Location: Blowdown Blowdown Blowdown Tower Basin Type: Tower Basin Mltpl/ Grab Mltpl/ Grab Mitpl/ Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC i

Zine Chromium rel & avg. max. max. l (mg/1) (mg/1) (min) (mg/1) (mg/1)

Limits:

(mg/1) 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 DRYo=

04-05-95 0 0 0 0 .03 I

.01 04-12-95 0 0 0 0 -- --

)

04-19-95 0 0 0 0 --

04-26 95 0 0 0 0 --

l 05-03-95 0 0 0 0 --

05-10-95 0 0 0 0 -- --

i 05-17-95 0 0 0 0 --

05-24-95 0 0 0 0 --

05-31-95 0 0 0 0 -- --

l 06-07-95 0 0 0 0 --

06-14-95 0 0 0 0 --

06-21-95 0 0 0 0 --

06-29-95 0 0 0 0 --

1 Month of Anril: i No. of Samples: 4 4 4 4 1 1 Avg. Value: 0 0 0 0 0.03 0.01  ;

Max. Value: 0 0 0 0 0.03 0.01  !

Limits Exceeded: 0 0 0 0 0 0 i

I Month of Mav:

No. of Samples: 5 5 5 5 0 0 i

Avg. Value: 0 0 0 0 --- ---

Max. Value: 0 0 0 0 --- ---

! Limits Exceeded: 0 0 0 0 --- ---

3 RLS1556207

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.1. Hatch From: 04 01-95 P.O. Box 4545 To: 06-30-95 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Month of June:

No. of Samples: 4 4 4 4 0 0 Avg. Value: 0 0 0 0 --- ---

Max. Value: 0 0 0 0 --- ---

Limits Exceeded: 0 0 0 0 ,

4 RLS1556208

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.I. Hatch From: 04-01-95 P.O. Box 4545 To: 06-30 95 ;

Atlanta, Geor9i a 30302 NPDES Permit Number: GAOOO4120 Discharge Location: 02A - Unit Two Cooling Tower Blowdown Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl/ Grab Mltpl/ Grab Mitpl/ Grab Grab Grab {

Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter i Parameter: Fac Fac max. Total Time T,RC Zinc Chromium rel & avg. max. max.

(mg/l) (mg/1) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 Date:

04-05-95 0 0 0 0 .05 0.0 04-12-95 0 0 0 0 --- ---

04-19-95 Unit in outage no sample available 04-27-95 0 0 0 0 --- ---

05-03-95 0 0 0 0 --- ---

05-10-95 0 0 0 0 --- ---

05-17-95 0 0 0 0 --- ---

05-24-95 0 0 0 0 --- ---

05-31-95 0 0 0 0 --- ---

06-07-95 0 0 0 0 --- ---

06-14-95 0 0 0 0 --- ---

06-21-95 0 0 0 0 --- ---

06-29-95 0 0 0 0 --- ---

Month of Acril-No. of Samples: 4 4 4 4 1 1 Avg. Value: 0 0 0 0 .05 0.0 Max. Value: 0 0 0 0 .05 0.0 Limits Exceeded: 0 0 0 0 0 0 M.onth of Mav-No. of Samples: 5 5 5 5 0 0 Avg. Value: 0 0 0 0 --- ---

l Max. Value: 0 0 0 0 --- ---

Limits Exceeded: 0 0 0 0 --- ---

l 5 RLS1556209

T QUARTERLY OPERATIONAL MONITORING REPORT l Georgia Power Company l Plant E.I. Hatch From: 04-01-95 l P.O. Box 4545 To: 06-30-95 Atlanta, Georgia 30302 NPDES Permit Number: GAOOO4120 Month of June?

No. of Samples: 4 4 4 4 0 0  ;

Avg. Value: 0 0 0 0 --- ---

Max. Value: 0 0 0 0 ---

)

Limits Exceeded: 0 0 0 0 --- ---

4 I

i l

l I

RLS1556210 6

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.I. Hatch From: 04-01-95 P.O. Box 4545 To: 06 30-95 ,

Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Discharge Location: 01B - Unit One Cooling Water Overflow Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl/ Grab Mltpl/ Grab Mltpl/ Grab Grab Grab I Frequency: 1/ Week 1/ Week 1/ Week Parameter:

1/ Quarter 1/ Quarter i Fac Fac max. Total Time TRC Zine Chromium rel & avg. max, max.

(mg/l) (mg/l) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 {

N/A 1.0 0.2 i PCS Code: 50064 50064 81400 50060 1092 1034 Date:

i 1

No sample available for this reporting period.  !

l l

l Month of Acril No. of Samples: 0 0 0 0 0 0 Avg. Value: -- --

Max. Value: -- --

Limits Exceeded:-- --

-- -- -- -- 1 Month af May-i No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- --

Max. Value: -- -- -- -- --

Limits Exceeded:-- -- -- -- -- --

Month of June-No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- --

Limits Exceeded:-- -- -- -- -- --

7 RLS1556211

?

I QUARTERLY OPERATIONAL MONITORING REPORT i

Georgia Power Company .i Plant E.1. Hatch From: 04-01 95 i P.O. Box 4545 To: 06-30-95 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Discharge Location: O1I - Unit One Cooling Tower Basin Drains Location: Blowdown - Blowdown Blowdown Type:

Tower Basin Tower Basin Mltpl Mltpl Mitpl- Grab Grab Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week ,, 1/ Quarter 1/ Quarter Parameter: -Fac Fac max. Total Time TRC Zinc Chromium

' rel & avg. max. max.

L(mg/l) (mg/l) (min) (mg/1) (mg/1)

Limits:

(mg/1) 0.2 0. 5 ' 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 nata-l t

This outfall was not utilized during the reporting period.

i ttonth of noril:

No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- --- -- -- --

Max. Value: -- -- -- -- -- --

Limits Exceeded:-- -- -- -- -- --

Month of Mavt No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- -- --

Limits Exceeded:-- -- -- -- -- --

Ponth of June- 1 No. of Samples: 0 0 0 0 0 0

, Avg. Value: -- -- -- -- -- --

t Max. Value: -- -- -- -- -- --

Limits Exceeded:-- -- -- -- -- --

1 g RLS1556212

- - . - . - - . = .

?

QUARTERLY OPERATIONAL MONITORING REPORT ,

I ,

Georgia Power Company  :

Plant E.I. Hatch From: 04 01-95 '

P.O. Box 4545 To: 06-30-95 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 1 Discharge' Location: 01J - Unit one cooling Tower Basin Overflows to Storm Drains -

Location: Blowdown Blowdown Blowdown Type:

Tower Basin Tower Basin Mitpl/ Grab Mltpl/ Grab Mltpl/ Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week- - 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium ,

rel & avg. max. max.

(mg/1) (mg/1) (min) (mg/1) (mg/1)

Limits:

(mg/1) 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064. 81400 50060 1092 1034 -

Date: 1 This outfall was not utilized during the reporting period. I l

i Month of Acril- '

No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- --

. Limits Exceeded: -- -- -- -- -- --

Month of Mav-No. of Samples: 0 0 0 0 0 0 Avg..Value: -- -- -- -- --

. Max. Value: -- -- -- -- --

Limits Exceeded: -- -- -- -- --

a Month of Junee No. of Samples: 0 0 0 0 0 0  ;

Avg. Value: -- -- -- -- --

Max. Value: -- -- -- -- -- --

Limits Exceeded: -- -- -- -- -- -- I 9 RLS1556213

. . ~ . . . - . . . .- - - ~ ~ - ~ ~

\

QUARTERLY OPERATIONAL MONITORING REPORT t

  • l Georgia Power Company Plant E.I. Hatch From: 04 01 95 l

~ P.O. Box 4545 To: 06 30-95 '

Atlanta, Georgia 30302 '

NPDES Permit Number: GAOOO4120 Discharge Location: 02B - Unit Two Cooling Water Overflow To Storm Drains Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mitpl/ Grab Mltpl/ Grab Mltpl/ Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter

- 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium

' rel & avg. max. max.

(mg/l) (mg/l) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 .N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034  ;

Dater 04-13-95 - - - -

0.0 0.0 l Discharge did not occur during period of chlorination.

Month of Acril-No. of Samples: 0 0 0 0 1 1- I 1

Avg. Value: --- --- --- ---

0.0 0.0 Max. Value: --- --- --- ---

0.0 0.0 j Limits Exceeded:--- --- --- ---

0 0 Month of Mave No. of Samples: 0 0 0 0 0 0 I

Avg. Value: --- --- --- --- -- --

Max Value: --- --- --- --- -- --

Limits Exceeded:--- --- --- --- -- --

Month of June?

No. of Samples: 0 0 0 0 0 0  ;

Avg. Value: --- --- --- --- --- --

I l

Max. Value: --- --- --- --- --- --

l Limits Exceeded:--- --- --- ---

l 1

10 RLS1556214

1 i I l QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 04-01-95 Plant E.I. Hatch P.O. Box 4545 To: 06-30 95 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Discharge Location: 02c - Unit Two cooling water overflow Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mitpl/ Grab Mltpl/ Grab Mltpl/ Grab Grab Grab l l Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Zinc Fac max. Total Time T3C Chromium rel & avg. max. max.

(mg/l) (mg/1) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2

! PCS Code: 50064 50064 81400 50060 1092 1034 Date l .

1 04-13-95 -- -- -- --

.01 0.0 l

Discharge did not occur during period of chlorination.

l 1

l 1

l Month of Acril No. of Samples: 0 0 0 0 1 1 Avg. Value: --- --- --- ---

.01 0.0 Max. Value: --- --- --- ---

.01 0.0 Limits Exceeded:--- --- --- ---

0 0 Month of Mav:

No. of Samples: 0 0 0 0 0 0 Avg. Value: --- --- --- --- --- ---

Max. Value: --- --- --- --- --- ---

Limits Exceeded:--- --- --- --- --- ---

Month of June-No. of Samples: 0 0 0 0 0 0 Avg. Value: --- --- --- --- -- --

Max. Value: --- --- --- --- -- --

Limits Exceeded:--- --- --- --- -- --

l l

,; RLS1556215

. ... - ~ - . . . . - . . _ . . _ . . _ - . - ~ . _ . . . . . . - . . . . - - . . . - .. -. .

QUARTERLY OPERATIONAL MONITORING REPORT  ;,

Georgia Power Company From: 04 01 95 .

Plant E.I. Hatch P.O. Box 4545 To: 06 30-95 ,

- Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 l

l l

Discharge Location: 01E - Low Volume Waste (Liquid Radwaste System  ;

Unit One) i Type of Sample: Grab  ;

Frequency of Analysis: 2/ Month  ;

PCS. Code
(530) (556)

Parameter: TSS O&G Nitrite 4 Chill Water) Releases mg/l mg/l to discharge point OSN 01 l',. Limits: Avg. 30 Avg. 15 Initial Amount Dilution Final Max.100 Max. 20 Conc. Drained Flow rate Conc.

(ppm) (gallons) (gpm) (ppb) '

Date:

04-03-95 '26.3 4.9 -- -- -- --

04-17-95 23.9 1.0 -- -- -- --

i i 05-01-95 20.0 3.9 -- -- -- --

05-15-95 14.5 4.0 -- -- -- --

06-05-95 20.8 5.4 -- -- -- --

06-19-95 5.9 0.0 -- --- --- --

)

i Month of April-No. of Samples 2 2 0 0 0 0 Average Value: 25.1 3.0 -- -- -- --

Max. Value 26.3 4.9 -- -- -- --

Limits Exceeded: 0 0 -- -- -- --

Month of Mav:

No. of Samples 2 2 0 0 0 0 Average Value: 17.3 4.0 -- -- -- --

Max. Value 20.0 4.0 -- -- -- --

Limits Exceeded: 0 0 -- -- -- --

Month of June:

No. of Samples 2 2 0 0 0 0 Average Value: 13.4 2.7 -- -- -- --  !

Max. Value 20.8 5.4 -- -- -- --

Limits Exceeded: 0 0 -- -- -- --

i 12 RLS1556216

. . ~ _ _ . . _ . _ . _ . . _ . _ _

QUARTERLY OPERATIONAL MONITORING REPORT

{ Georgia Power Company .

Plant E.I. Hatch From: 04-0195 P.O. Box 4545 To: 06 30-95 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Discharge Location:

02E - Low Volume Waste (Liquid Radwaste System-Unit Two)

Type of~ Sample: Grab Frequency of Analysis: 2/ Month PCS Code: (530) (556) ,,

l ' Parameter: TSS O&G t

mg/l Nitrite (Chill Water) Releases

, mg/l to discharge point OSN 02 Limits: Avg. 30 Avg. 15 Initial Amount Dilution Final Max.100 Max. 20 Conc. Drained Flow' rate Conc.

(ppm) (gallons) (gpm) (ppb)

Datee 1 f 04-03-95 0.4 1.4 -- -- -- --

04-18-95 3.3 2.5 -- -- -- --

l l

i 05-01-95 0.8 0.0 -- -- -- i

! 05-15-95 1.4 7.0 -- -- --

06-05-95 0.4 0.0 -- -- -- -- -

06-19-95 0.7 0.6 -- -- -- --

Month of Acril-No. of Samples 2 2 0 0 0 0 Average Value: 1.9 2.0 -- -- --- --

Max. Value 3.3 2.5 -- -- --- --

Limits Exceeded: 0 0 -- -- --- --

Month of Mav:

No. of Samples 2 2 0 0 0 0 Average Value: 1.1 3.5 -- -- -- --

Max. Value 1.4 7.0 -- -- -- --

Limits Exceeded: 0 0 -- -- -- --

Month of June; i No. of Samples- 2 2 ~0 0 0 0

! Average Value: 0.6 0.3 -- -- -- --

Max Value 0.7 0.6 -- -- -- --

i

Limits Exceeded
0 0 -- -- -- --

I i l

13 RLS1556217 j

i

. _ . . . . - . . . . . - _ . - . ... ~ - . _.-. . . _ _._ .. - . . -

t i

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.I. Hatch From: 04-01 95 P.O. Box 4545 To: 30-95 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Sewage Treatment Plant Sludge Disposal (lbs/ day / month)

[

t April i MaY ,, June  !

Date 1bs Date lbs Date- lbs 04/18/95 791.8 No sludge removed 04/20/95 910.4 06/28/95. 720.5 during.the month

  • of May I

l 4

l I

i 1

14 RLS1556218

_ _ . . _ _ _ _ . _ . _ _ _ _ _ . _ _ _ _ - . _ . ~ . _ - . - . _ - . - _ . _ ___ _ __ _

QUARTERLY OPERATIONAL MONITORING REPORT

  • Georgia Power Company i Plant E.I. Hatch From: 04-01-95 P.O. Box 4545 To: 06-30 95 Atlanta, Georgia 30302 NPOES Permit Number: GAOOO4120 Discharge Location:

01 - Combined Plant Waste Streams Unit One Frequency of Analysis: 1/ Week Type of Samples: In Situ Grab Grab Parameter: Grab Temperature T.R.C. F.A.C. pH Limits: Degree F N/A ,, N/A Min. 6.0/ Max. 9.0 PCS Code: (11) (50060) (50064) (400)

Datei 04-03-95 78 0.0 0.0 =7.8 04-10-95 84 0.0 t

0.0 7.7 04-17-95 82 0.0 0.0 7.8 ,

L 04-24-95 80 l

0.0 0.0 7.6 05-01-95 87 0.0 0.0 7.9 05-08-95 S4 0.0 0.0 7.6 5 05-15-95 93 0.0 0.0 7.6 05-22-95 84 0.0 0.0 7.6 l .05-28-95 91 0.0 i' 0.0 8.0  !

06-05-95 87 0.0 0.0 7.9 l 06-12-95 93 0.0 0.0 7.5

! 06-19-95 86 0.0 0.0 8.0 {

l 06-26-95 91 0.0

! Month of Anri1?

0.0 7.9 .i I

No. of Samples 4 4 4 l 4 -

Average Value: 81 0.0 0.0 7.7 Max. Value 84 0.0 0.0 7.8 Limits Exceeded: 0 0 0 0 Month of Mav_e No. of Samples 5 5 5 5 Average Value: 88 0.0 0.0 7.7 j

Max. Value 93 0.0 0.0 8.0.

Limits Exceeded: 0 0 0 0 I

Month of June-No. of Samples 4 4 4 4 l Average Value: 89 0.0 0.0 7.8 Max. Value 93 0.0 0.0 8.0 f Limits Exceeded: 0 0 0 0 15 RLS1556219

4 i

OUARTERLY OPERATIONAL MONITORING REPORT 4

Georgia Power Company Plant E.I. Hatch From: 04 01 95 -

P.O. Box 4545 To: 06-30-95  !

Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Discharge Location:

02 - Combined Plant Waste Streams Unit Two '

Frequency of Analysis: 1/ Week ,

Type of Samples: In Situ Grab Grab Grab Parameter: Temperature T.R.C. F.A.C. pH  !

Limits: Degree F N/A 7

4 Code:

,, N/A Min. 6.0/ Max. 9.0 I (11) (50060) (50064) (400)

Dater i 04-03-95 78 0.0 0.0 7.9

04-10-95 84 0.0 0.0 8 '. 3  ;

i 04-17-95 77 0.15 0.0 7.9-

, 04-24-95 80 0.0 0.0 8.1 i 05-01-95 87 0.0 0.0 '

8.2 05-08-95 73 0.0 0.0 8.0 l 05-15-95 95 0.0 0.0 8.4  !

05-22-95 86 0.0 0.0 7.4 ,

05-28-95 91 0.0 0.0 8.5 06-05-95 89 0.0 0.0 8.2 ,

06-12-95 93 0.0 0.0 7.6 06-19-95 87. 0.0 0.0 7.6 06-26-95 90 0.0 0.0 i 8.4 Month of Anril-No. of Samples 4 4 4 4 Average Value: 79 0.15 0.0 8.0 Max. Value 84 0.15 0.0 8.3 Limits Exceeded: 0 0 0 0 Month of Mavt No. of Samples 5 5 5 5 Average Value: 86 0.0 0.0 8.1 Max. Value 95 0.0 0.0 8.5 Limits Exceeded: 0 0 0 0 Month of June:

No. of Samples 4 4 4 4 I

j Average Value: 90 0.0 0.0 7.9  !

Max. Value 93 0.0 0.0 8.4 Limits Exceeded: 0 0 0 0 16 RLS1556220

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.I. Hatch From: 04 01 95 P.O. Box 4545 To: 06-30-95 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 I certify under the penalty of . law t' hat this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. . Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for known violations.

l l

l i

l l

1 l

H. L. Sumner, Jr.

General Manager Nuclear Plant 17 RLS1556221 l .

o 7-0 3 -of- 0

  • t QUARTERLY OPERATIONA' 'AONITORING REPORT l i L

Georgia Power Company Plant E.I. Hatch From: 07-01-95 P.O. Box 4545 To: 09-30-95 ,

Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Discharge Location: O1G Low Volume Waste (Neutralization Tank) l )

Type of Sample: Grab Grab 1

Frequency of Analysis: {

2/ Month 2/ Month PCS Code: (530) (556) '

Parameter: Suspended Solids mg/l (TSS) Oil & Grease mg/l (O&G)

Limits: Avg. 30 Avg. 15 Max. 100 Max. 20 Date:. MG/L MG/L l l

07-03-95 11.0 '

l 0.0 07-17-95 9.3  !

9.5 l

08-07-95 17.7 l 2.7 i 08-21-95 21.7 0.0 09-05-95 81.6 0.0 09-11-95 4.7 --

09-21-95 11.2 0.0 09-26-95 4.6 --

Month of Julv:

No. of Samples: 2 2 Average Value: 10.2 4.8 Max. Value: 11.0 9.5 Limits Exceeded: 0 0 Month of Auaust:

No. of Samples: 2 2 Average Value: 19.7 1.4 Max. Value: 21.7 2.7 Limits Exceeded: 0 0 Month of Sen_tember:

No. of Samples: 4 2 Average Value: 25.5 0.0 Max. Value: 81.6 0.0 Limits Exceeded: 0 0 RLS1564635 1

I I l i

QUARTERLY OPERATIONAL MONITORING REPORT '

l Georgia Power Company From: 07-01-95 i Plant E.I. Hatch ,

l To: 09-30-95  ;

l P.O. Box 4545 l Atlanta, Georgia 30302 NPDES Permit Number: GAOOO4120  !

Discharge Location: 01H - Low Volume Waste (Pressure Filters Backwash)

I .

I l l Type of Sample: Grab Grab j- Frequency of Analysis: 1/ Quarter 1/ Quarter )

l- PCS Code: (530) (556) '

Parameter: Suspended Solids (TSS) l Oil & Grease (O&G) I Limits: Avg. 30 Avg. 15 l t

Max. 100 Max. 20 i l Date: MG/L l MG/L )

l l

E 08-06 0.3 1. 5 - 1 i

1

! I I

l l

Month of July: 1 j No. of' Samples:  !

0 0 l Average Value: ---

Max Value: ---

Limits Exceeded: ---

i i

Month of Auaust:

l No. of Samples: 1 1 Average Value: 0.3 1.5 1.

Max. Value: 0.3 1.5 i

Limits Exceeded: 0 0 Month of September '

i No. of Samples: 0 0 g Average Value: ---

j Max. Value: ---

Limits Exceeded: ---

i 2 RLS1564636

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company i Plant E.I. Hatch From: 07-01-95 To: 09-30-95 {

P.O. Box 4545 1 Atlanta, Georgia 30302 NPDES Permit Number: GAOOO4120 Discharge Location: 01A - Unit One Cooling Tower Blowdown Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mitpl/ Grab Mltpl/ Grab Mltpl/ Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: -Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/1) (mg/l) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 Date:

07-05-95 0 0 0 0 07-10-95 -- -- -- --

0.0 0.0 07-12-95 0 0 0 0 --

07-19-95 0 0 0 0 -- --

07-26-95 0 0 0 0 -- --

08-02-95 0 0 0 0 -- --

08-09-95 0 0 0 0 -- --

08-16-95 0 0 0 0 --

08-22-95 0 0 0 0 --

08-30-95 0 0 0 0 --

1 09-06-95 0 0 0 0 --

09-13-95 0 0 0 0 --

09-20-95 0 0 0 0 -- --

09-27-95 0 0 0 0 -- --

Month of Julv-No. of Samples: 4 4 4 4 1 1 Avg. Value: 0 0 0 0 0.0 0.0 Max. Value: 0 0 0 0 0.0 0.0 Limits Exceeded: 0 0 0 0 0 0 Month of Aucust:

No. of Samples: 5 5 5 5 0 0 Avg. Value: 0 0 0 0 --- ---

Max. Value: 0 0 0 0 --- ---

Limits Exceeded: 0 0 0 0 --- ---

1 3 RLS1564637

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 07-01-95 Plant E.l. Hatch To: 09-30-95 P.O. Box 4545 Atlanta, Georgia 30302 '

NPDES Permit Number: GA0004120 Month of September-l No. of Samples: 4 4 4 4 0 0 Avg. Value: 0 0 0 0 --- ---

l Max. Value: 0 0 0 0 --- ---

Limits Exceeded: 0 0 0 0 --- ---

l l

1 I

i l

I l

l l

l l

l l

l i l

i l

i l

l l

l l

4 RLS1564638 i

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.1. Hatch From: 07-01-95 P.O. Box 4545 To: 09 30-95

~ Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Discharge Location:. 02A - Unit Two cooling Tower Blowdown Location: Blowdown Blowdown Blowdown Type:

Tower Basin Tower Basin Mltpl/ Grab Mltpl/ Grab Mltpl/ Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter Parameter: 1/ Quarter i Fac Fac max. Total Time TRC Zinc Chromium l rel & avg. max. max. j (mg/1). (mg/1) (min) (mg/1) (mg/1) (mg/1) i Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 Date:

07-05-95 0 0 0 0 --- ---

07-10-95 -- -- -- --

0.0 0.0 07-12-95 0 0 0 0 ---

t

. 07-19-95 0 0 0 0 --- ---

l 07-26-95 0 0 0 0 --- ---

08-02-95 0 0 0 0 --- ---

l 08-09-95 0 0 0 0 ---

t 08-16-95 0 0 0 0 --- ---

08-22-95 0 0 0 0 --- ---

08-30-95 0 0 0 0 --- ---

009-01-95 0 0 30 0 ---

09-06-95 0 0 0 0 --- ---

09-13-95 0 0 0 0 ---

09-20-95 0 0 0 0 --- --- '

09-27-95 Unit Two in outage. No Sample available Month of Julv:

No.. of Samples: 4 4 4 4 1 1 Avg. Value: 0 0 0 0 0.1 0.0 l Max. Value: 0 0 0 0 0.1 '

0.0 Limits Exceeded: 0 0 0 0 0 0 5

-i Month of Aucust:

No. of Samples: 5 5 5 5 0 0 Avg. Value: 0 0 0 0 --- ---

Max. Value: 0 0 0 0 ---

l Limits Exceeded: 0 0 0 0 --- ---

5 RLS1564639

+ - -,

,-9 ,, -a-, m -- - - , - . . ,_ m -- . ., -- -- , - w

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.I. Hatch From: 07-01-95 P.O. Box 4545 To: 09-30-95 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Month of Seotember-No. of Samples: 4 4 4 4 0 o Avg. Value: 0 0 30 0 --- ---

Max. Value: 0 0 30 0 ---

Limits Exceeded: 0 0 0 0 --- ---

i 1

l l

l 6 RLS1564640

l l

l QUARTERLY OPERATIONAL MONITORING REPORT i Georgia Power Company From: 07-01-95 '

Plant E.1. Hatch To: 09-30-95 P.O. Box 4545 Atlanta, Georgia 30302 NPDES Permit b ber: GAOOO4120 Discharge Location: 01B - Unit One Cooling Water Overflow Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl/ Grab Mltpl/ Grab Mltpl/ Grab Grab Grab <

Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter l

Parameter: Fac Fac max. Total Time TRC- Zinc Chromium rel & avg. max. max.

(mg/1) (mg/1) (min) (mg/1) (mg/1) (mg/1).

Limits: l 0.2 0.5 120 N/A 1.0 0.2 1 PCS Code: 50064 50064 81400 50060 1092 1034 Date: '

No sample available this quarter.

i i

l l

Nonth of July:

-No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- -- --

I Limits Exceeded:-- -- -- -- -- --

Month of Auaust-No. of Samples: 0 0 0 0 0 0 Avg-- Value: -- -- -- -- -- --

l Max. Value: -- -- 1 Limits Exceeded:-- -- -- -- -- --

Month of Sectember-No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- -- --

g Limits Exceeded:-- -- -- -- -- --

i 7 RLS1564641

I l

. i i

i QUARTERLY OPERATIONAL MONITORING REPORT l

i Georgia Power Company Plant E.I. Hatch From: 07-01 95 l P.O. Box 4545 To: 09-30-95 l Atlanta, Georgia 30302 l NPDES Permit Number: GA0004120 l 1

Discharge Location: 01I - Unit one cooling Tower Basin Drains l 1

Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl Mltpl Mltpl Grab Grab Grab Grab Grab l Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter

{ Parameter: Fac Fac max. Total Time TRC Zinc Chromium l

rel & avg. max. max.

l (mg/l) (mg/1) (min) (mg/1) (mg/1) (mg/1) I Limits: 0.2 0.5 120 N/A 1.0 0.2 j PCS Code: 50064 50064 81400 50060 1092 1034 nnro-l No sample available this quarter.

l Month of July:

No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- -- --

I Max. Value: -- -- -- -- --

Limits Exceeded:-- -- -- -- --

Month of Aucust:

No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- --

Max. Value: -- -- -- -- -- --

Limits Exceeded:-- -- -- -- -- --

Month of Se_tember:

n l No. of Samples: 0 0 0 0 0 0 l Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- -- --

i Limits Exceeded:-- -- -- -- --

8 RLS1564642

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 07-01-95 Plant E.1. Hatch To: 09 30-95 P.O. Box 4545.

Atlanta, Georgia 30302 -

NPDES Permit Number: GA0004120 i

Discharge Location: = 01J - Unit one Cooling Tower Basin overflows to Storm Drains ,

Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl/ Grab Mltpl/ Grab Mitpl/ Grab Grab Grab l Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/1) (mg/l) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 Date:

No sample available this quarter.

P Month of Julv-No. of Samples: 0 0' O O O O Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- -- --

Limits Exceeded: -- -- -- -- -- --

Month of Aucust?

No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- -- --

Limits Exceeded: -- -- -- -- -- --

1 Month of Seotember:

No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- -- --

Limits Exceeded: -- -- -- -- --

9 RLS1564643 1

_ _ . - . - - - . . . . . .~ . - _ - - . _ . - - - . . - - - - .

. ~ ~ . . - . . . - . ~ . . _ . . . - - - - _-

l QUARTERLY OPERATIONAL MONITORING REPORT i

l Georgia Power Company From: 07-01 95 l Plant E.I. Hatch -

P.O. Box 4545 To: 09-30-95

' Atlanta, Georgia 30302 i NPDES Permit Number: GA0004120 Discharge Location: 02B - Unit Two Cooling Water Overflow To Storm l . Drains .

Location: Blowdown Blowdown Blowdown Tower Basin Tower. Basin Type: Mltpl/ Grab Mltpl/ Grab Mltpl/ Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

! (mg/1) (mg/l) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 Date!

09-02-95 - - - -

0.9 0.08 l

L Discharge did not occur during period of chlorination. >

l Month of Julvt -

l No..of Samples: 0 0 0 0 0 0

' Avg. Value: --- --- --- --- --- ---

Max. Value.: --- --- --- --- --- ---

Limits Exceeded:--- --- --- --- --- ---

l Month of Auc_ust-l: No. of Samples: 0 0 0 0 0 0

[ Avg. Value: --- --- --- --- -- --

. Max. Value: --- --- --- --- -- --

Limits Exceeded:--- --- -- . --- -- --

t Month of September; i No. of Samples: 0 0 0 0 1 1 7

i

[ Avg. Value: --- --- --- ---

0.9 0.08 l

l Max. Value: --- --- --- ---

0.9 0.08 l

Limits Exceeded:--- --- --- ---

0 0 10 RLS1564644

i .

E j QUARTERLY OPERATIONAL MONITORING REPORT [

2 Georgia Power Company ,

Plant E.I. Hatch From: 07 01-95

!. P.O. Box 454.5 To: 09 30-95' j Atlanta, Georgia 30302 I NPDES Permit Number: GA0004120 .

g Discharge Location: '!

02c - Unit Two cooling water overflow .;

Location: Blowdown Blowdown Blowdown Tower Basin Tower Bacip i

Type: Mltpl/ Grab Mltpl/ Grab Mltpl/ Grab Grab Crab  !

l Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter Parameter:

1/ Quarter Fac Fac max. Total Time TRC Zinc Chromium -

! rel & avg. max. max.  ;

(mg/l) (mg/1) (min) (mg/1) (mg/1) (mg/1) '

Limits: 0.2 0.5 120 N/A 1.0 '

0.2 PCS Code: 50064 50064 81400 50060 1092 1034 Date:

  • 09-22-95 -- -- --

I 0.01 0,0  ;

Discharge.did not occur during chlorination period.

{

i Month of Julv_-

No. of Samples: 0 0 0 0 0 0 Avg. Value: --- --- --- --- --- ---

Max. Value: --- --- --- --- --- ---

Limits Exceeded:--- --- --- --- --- ---

Month of Aucusti No. of Samples: 0 0 0 0. 0 0 Avg Value: --- --- --- --- --- ---

Max. Value: --- --- --- --- --- ---

Limits Exceeded:--- --- --- --- --- ---

Month of sentember .

No. of Samples: 0 0- 0 0 1 1 Avg. Value: --- --- --- ---

0.01 0.0 Max. Value: --- --- --- ---

0.01 0.0 Limits Exceeded:--- --- --- ---

0 0 I

il RLS1564645

I 1

[ QUARTERLY OPERATIONAL MONITORING REPORT -

l^ \

' Georgia Power Company From: 07-01-95' Plant E.1. Hatch To: 09-30-95 1 P.O. Box 4545 Atlanta, Georgia ' 30302 NPDES Permit Number: GA0004120 i Discharge Location: 01E - Low Volume Waste (Liquid Radwaste System (

Unit One) J Type of Sample: Grab 4 Frequency of Analysis: 2/ Month i

PCS Code: (530) (556)

. Parameter: )

TSS O&G Nitrite (Chill Water) Releases i mg/l mg/l to discharge point OSN 01 Limits: Avg. 30 Avg. 15 Initial Amount Dilution Final l Max.100 Max. 20 Conc. Drained Flow rate Conc.

('pm) p (gallons) (gpm) (ppb)

Date:

07-03-95 18 14.7 -- -- -- --

07-17-95 2.3 1.4 -- -- -- --

08-07-95 2.6 2.8 -- -- -- --

l 08-16-95 -- --

1.0 6640 20500 3.2 l 08-16-95 -- --

0.2 2650 22500 10 . 6 08-17-95 -- --

0.2 6650 21000 0.6 08-17-95 -- --

0.3 6460 21000 0.9 08-21-95 4.5 0.0 -- -- -- --

09-05-95 4.5 3.9 -- -- -- --

j 09-19-95 4.3 1.3 -- --- --- -- 1 Month of Julv_:

No of Samples 2 2 0 0 0 0 l Average Value: 10.2 8.1 -- -- -- -- I i

Max. Value 18 14.7 -- -- -- --

Limits Exceeded: 0 0 -- -- -- --

Month of Aucust-No. of Samples 2 -2 4 4 4 4  !

Average Value: 3.6 1.4 0.4 5600 21250 1.3 Max. Value 4.5 2.8 1.0 6650 22500 3.2 l

Limits' Exceeded: 0 0 0 0 0 0 i

12 RLS1564646

1 i

QUARTERLY OPERATIONAL MONITORING REPORT 1

Georgia Power Company From: 07-01-95 i Plant E.l. Hatch P.O. Box 4545 To: 09-30-95 1 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 i

Month of September '

No. of Samples 2 2 0 0 0 0 l Average Value: 4.4 2.6 -- -- -- --

l t

Max. Value 4.5 3.9 -- -- I Limits Exceeded: 0 0 -- -- -- --

l 1

l l

l 1

l l

l l

13 RLS1564647

i l

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.I. Hatch From: 07-01-95 l P.O. Box 4545 To: 09-30-95 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Discharge Location:

02E - Low Volume Waste (Liquid Radwaste System Unit Two)

Type of Sample: Grab l Frequency of Analysis: 2/ Month PCS Code: (530) (556)

Parameter: TSS O&G mg/l Nitrite (Chill Water) Releases mg/l to discharge point OSN 02 Limits: Avg. 30 Avg. 15 Initial Amount Dilution Final Max.100 Max. 20 Conc. Drained Flow rate Conc.

(ppm) (gallons) (gpm) (ppb)

Date-07-03-95 1.7 2.4 -- -- -- --

07-17-95 0.4 2.3 -- -- -- --

08-07-95 0.4 0.3 -- -- -- --

08-21-95 0.5 1.6 -- -- -- --

09-04-95 6.0 0.0 -- -- -- --

09-12-95 -- --

80 8668 12000 498 09-18-95 0.3 2.0 -- -- -- --

Month of Julv:

No. of Samples 2 2 0 0 0 0 Average Value: 1.1 2.4 -- -- --- --

Max. Value 1.7 2.4 -- -- --- --

Limits Exceeded: 0 0 -- -- --- --

Month of Auaust:

No. of Samples 2 2 0 0 0 0 l Average Value: 0.5 1.0 -- -- -- --

Max. Value 0.5 1.6 -- -- -- --

Limits Exceeded: 0 0 -- -- -- --

Month of Seo_tember:

No. of Samples 2 2 1 1 1 1 Average Value: 3.2 1.0 80 8668 12000 498 Max. Value 6.0 2.0 80 8668 12000 498 Limits Exceeded: 0 0 0 0 0 0

?

g4 RLS1564648 1

. . . - . - . . . . . . . . . . - . . . . . - , . . - . . _ . . . - ~ . . . . . . . ... _ - .

6 QUARTERLY OPERATIONAL MONITORING REPORT i Georgia Power Company '

From: 07-01-95 Plant E.1. Hatch To: 09-30-95 ,

P.O. Box 4545 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 l

l' l' Sewage Treatment Plant Sludge Disposal  ;

(lbs/ day / month)

[

l July. August September  ;

Date 1bs Date lbs Date 'lbs  !

l 1 07/14/95 385 No sludge removed No sludge removed ,

07/18/95 473 during the month during the month ,

of August of September  !

l l

l l

i 15 RLS1564649

l I

OUARTERLY OPERATIONAL MONITORING REPORT

, Georgia Power Company Plant E.1. Hatch From: 07 01-95 l

P.O. Box 4545 To: 09-30-95 l

j Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Discharge Location:

01 - Combined Plant Waste Streams Unit One Frequency of Analysis: 1/ Week Type of Samples: In Situ Grab Grab Grab Parameter: Temperature T.R.C. F.A.C. pH

Limits
Degree F N/A l

N/A Min. 6.0/ Max. 9.0 PCS Code: (11) (50060) (50064) l

' (400)

Date:

07-03-95 91 0.0 0.0 8.1 j 07-10-95 91 0.0 0.0 7.9 07-17 95 89 0.0 0.0 8.4 07-24-95 95 0.0 0.0 8.5 07-31-95 93 0.0 0.0 8.2 08-07-95 95 0.0 0.0 8.3 08-17-95 91 0.0 0.0 8.3 08-21-95 91 0.0 0.0 8.5 08-28-95 89 0.0 0.0 7.9 09-04-95 86 0.0 0.0 6.3 09-11-95 86 0.0 0.0 8.1 09-18-95 87 0.0 0.0 7.7 09-25-95 86 0.0 0.0 l

7.4 Month of Ju1v_:

No. of Samples 5 5 5 5 Average Value: 92 0.0 0.0 8.2 Max. Value 95 0.0 0.0 8.5 Limits Exceeded: 0 0 0 0 Month of Aucuste

No. of Samples 4 4 4 4

! Average Value: 92 0.0 0.0 8.3 Max. Value 95 0.0 0.0 8.5 Limits Exceeded: 0 0 0 0 l

Month of Sectember-No. of Samples 4 4 4 4 Average Value: 86 0.0 0.0 7.4 Max. Value 87 0.0 0.0 8.1 Limits Exceeded: 0 0 0 0 1

16 RLS1564650 l

.._.___m.__. _ ~ - . . . . . _ _ _ _ . _ . , _ _ . . - _ . . _ _ _ _ . - - - _ _ _ _ . _ _ _ _ . _ _ .

QUARTERLY OPERATIONAL MONITORING REPORT- l

)

Georgia Power Company From: 07-01-95 Plant E.1. Hatch To: 09 30-95 l P.O. Box 4545 Atlanta, Georgia 30302  :

NPDES Permit Number: GA0004120_  ;

Discharge Location: 02 - Combined Plant Waste Streams Unit Two Frequency of Analysis: 1/ Week I Type of Samples: In Situ Grab Grab Grab '

Parameter: Temperature T.R.C. F.A.C. pH Limits: Degree F N/A N/A Min. 6.0/ Max. 9.0 Code: (11) (50060) (50064) (400)

Dater i 07-03-95 91 0.0 0.0 8.3 07-10-95 93 0.0 0.0 8.4  ;

07-17-95 87 0.0 0.0 8.2 07-24-95 H95 0.0 0.0 8.5-  ;

07-31-95 93 0.0 0.0 8.5 r 08-07-55 95 0.0 0.0 8.5 08-14-95 93 0.0 0.0 8.5 08-21-95 89 0.0 0.0 8.3-  !

08-28-95 89 0.0 0.0 8.1

'09-04-95 80 0.0 0.0 7.0  !

09-11-95 86 0.0 0.0 8.1 09-18-95 87 0.0 0.0 7.6 09-25-95 86 0.0 0.0 7.6 Month of Julvt No. of Samples 5 5 5 5 Average Value: 92 0.0 0.0 8.4 Max, Value 95 0.0 0.0 8.5 Limits Exceeded: 0 0 0 0 Month of Aucust:

No. of Samples 4 4 4 4 Average Value: 92 0.0 0.0 8.4 Max. Value 95 0.0 0.0 8.5 Limits Exceeded: 0 0 0 0 Month of Sectember:

No. of Samples 4 4 4 4 Average Value: 85 0.0 0.0 7.6 Max. Value 87 0.0 0.0 8.1 Limits ~ Exceeded: 0 0 0 0 17 RLS1564651

l l ,

l- QUARTERLY OPERATIONAL MONITORING REPORT

-Georgia Power Company From: 07-01-95 '

Plant E.I. Hatch To: 09-30-95 ,

P.O. Box-4545 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 l

l l

l -

i l l

l l

l I certify under the penalty of law 'that this document and all j attachments were prepared under my direction or supervision in accordance j

with a system designed to assure that qualified personnel properly gather-and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the-information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there. are significant penalties for submitting false information, including the possibility of fine and imprisonment for known violations.

j

!. )

! l l

l I i C

i t .v -

W W H. L. Sumner, Jr.

General Manager Nuclear Plant l

g RLS1564652

QUARTERLY OPERATIONAL MONITORING REPORT -

' Georgia Power Company -

From: 10-01 95 Plant E.I. Hatch To: 12-31-95 P.O. Box 4545 Atlanta, Georgia 30302 <

NPDES Permit Number: GA0004120 i

Discharge Location:

O1G - Low volume Waste- (Neutralization Tank)

, Type of sample: Grab Grab Frequency of-Analysis: 2/ Month 2/ Month PCS Code: l (530) (556) -;

Parameter: Suspended Solids mg/l_(TSS)

F Oil & Grease mg/l (O&G)' e Limits: Avg. 30 Avg. 15  ;

Max. 100 Max. 20 Date. MG/L MG/L 10-02-95 10.0 0,0 10-18-95 5.4 5.5 I i

11-08-95 13.3 0.0 11-21-95 18.2 0.0 '

k 12-05 27.8 0.0

~12-18-95 47.6 0.0 12-25-95 7.5 --

Me n t '- of October-

  • o..of Samples: 2 2

. Average Value: 7.7 2.8  ;

Max, Value: 10.0 5.5  ;

Limits Exceeded: 0 0 '

i

! &n t 'r of November-No. of Samples: 2 2 Aterage Value: 15.8 '

0.0 Max. Value: 18.2 0.0 Limits Exceeded: 0 0 Month of December-No. of Samples: 3 2

Average _ Val .
e : 27.6 ,,

0.0 j Max. Value: 47.6 0.0 l Limits Exceeded: 0 0 4

la l

l l

. -- . . . . . - .- - . .. -. . ~ . . - .. - ..- . __

1 QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.I. Hatch From: 01 95 P.O. Box 4545 - ' To: 12 31-95 -

Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Discharge Location:

O1H - Low Volume Waste (Pressure Filters Backwash)

Type of Sample: Grab Grab Frequency of Analysis: 1/ Quarter 1/ Quarter PCS Code: (530) (556)

Parameter: Suspended Solids (TSS) Oil & Grease (O&G)

Limits: Avg. 30 Avg. 15 Max. 100 Max. 20  !

Dare- MG/L MG/L l

10-30-95 1 0 i

l l

l Month of Octobert No. of Samples: 1 1  !

Average Value: 1 0.0 Ma:. Value: 1 0.0 Limits Exceeded: 0 0 1 Month of November No. of Samples: 0 0 Average Value: --

Max. Value: --

Limits Exceeded: --

1 Month of December 5 1

No. of Samples: 0 0 i j Average Value: ---

j Max. Value: --- '

Limits Exceeded: ---

1 i

j l

Ib t

(

. - - . .. - .. ... . . . . - ~ - - . - . . . - . .. ..- ..-.~..-.~ -- - .- -

f QUARTERLY OPERATIONAL MONITORING REPORT.

Georgia Power Company Plant E.I. . Hatch From: 10-01-95 L P.O. Box 4545 To: 12 31 95

' Atlanta, Georgia 30302 NPDES Permit Number: GA0004120  ;

Discharge Location: 01A - Unit one cooling Tower Blowdown j Location: Blowdown. Blowdown Blowdown

' Tower Basin Tower Basin

. Type: Mltpl/ Grab Mltpl/ Grab 'Mitpl/ Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter j Parameter: Fac. Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/1) (mg/1) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120' N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 Dara-10-04-95 0 0 0 0 - - - --

10-11-95 0 0 0 0 0.02 0.0 10-18-95 0 0 0 0 --

10-25-95 0 0 0 0 -- --

1_*-01-95 0 0 0 0 --

11-08-95' O O O O -- -- i l

11-15-95 0 0 0 0 -- --

I:

11-21-95 0 0 0 0 -- --

1 11-23-95 0 0 0 0 --~ --

2-04-95 0 0 0 0 -- --

12-13-95 0 0 0 0 -- --

12-20-95 0 0 0 0 -- --

  • 2-27-95

. 0 0 0 0 -- --

1 l

~-& o f occaber . j

'o, of Samples: 4 4 i

4 4 1 1 i Avg. Value: 0 0 0 0 0.02 0.0  !

Max. Value: 0 0 0 0 0.02 i

0.0 i Limits Exceeded: 0 0 0 0 0 0 'l vmh of November-No. of Samples: 5 5 5 5 0

^

0 A /g . Value: 0 0 0 0 -- --

tax . Value: 0 0 0 0 -- --

Limits Exceeded: 0 0 0 0 -- --

. .. .. ... . - . - - . . . - . . ._. .- .. -. . - . ~ . . . . . . ..

(.

i

' t i  :

. QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 10-01-95 Plant E.1. Hatch To: 12-31-95 P.O. Box 4545 Atlanta, Georgia 30302.

NPDES Permit Number: GAOOO4120 Month of December-No. of Samples: 4' 4 4 4 o- o Avg. Value: 0 0 0 0 --

-- l Max. Value: 'O O O O -- -- t Limits Exceeded: 0 0 0 0 -- --

i l

1 1

1 I

l 1

-% I I

i 3

l

. - - - . . . - . - . - ~ . _ - - _ _ , -. .-. .- .

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company From: 10-01-95 Plant E.1. Hatch P.O. Box 4545 To: 12 31 95 ,

Atlanta, Georgia 30302 l NPDES Permit Number: GAOOO4120 .

I Discharge Location: 02A - Unit Two cooling Tower Blowdown Location: Blowdown Blowdown Bltwdown Tower Basin Tower Basin 1

l Type: Mltpl/ Grab Mltpl/ Grab Mltpl/ Grab Grab Grab l Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter  !

Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

(mg/1) (mg/l) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 Date:

10-04-95 Unit down for outage. No sample available. ---

10-11-95 Unit down for outage. No sample available. ---

10-18-95 Unit down for outage. No sample available. ---

10-26-95 Unit down for outage. No sample available. ---

11-01-95 Unit down for outage. No sample available. ---

11-08-95 Unit'down for outage. No sample available. ---

11-15-95 Unit down for outage. No sample available. ---

11-22-95 0 0 0 0 --- ---

11-23-95 0 0 0 0 --- ---

l

'2-05-35

- 0 0 0 0 ---

12-13-95 0 0 0 0 0.77 0.02 12-20-95 0 0 0 0 --- ---

12-27-95 0 0 0 0 --- --- l v.rnrF of October:

No. of Samples: 0 0 0 0 0 0 A /g. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- -- --

Limits Exceeded:-- -- -- -- -- --

  • 5nt h of 'avember :

No. of Samples: 2 2 2 2 0 0 Avg. Value: 0 0 0 0 --- ---

Ma:. . Value: 0 0 0 0 - --- ---

Limits Exceeded: 0 0 0 0 --- ---

4

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.I. Hatch From: 10-01 95 P.O. Box 4545 To: 12 31 95 Atlanta, Georgia 30302 NPDES Permit Number: GAOOO4120 Month of December:

No. of Samples: 4 4 4 4 1 1 Avg. Value: 0 0 0 0 0.77 0.02

! Max. Value: 0 0 0 0 0.77 0.02

. Limits Exceeded: 0 0 0 0 0 0 I

I l

t 5

. _ - - . . - . - . . . ,- - . . _ - . . . ~ .-.

1 j

GUARTERLY OPERATIONAL MONITORING REPORT- I i

Georgia Power Company

. Plant E.I. Hatch From: 10-01-95 I P.O. Box 4545 To: 12 31-95 i

' Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 '

r Discharge Location: 01B - Unit One Cooling Water Overflow Location: Blowdown Blowdown Blowdown Tower' Basin Tower Basin Type: Mltpl/ Grab Mltpl/ Grab Mltpl/ Grab Grab Grab Frequency:

1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

( (mg/l) (mg/l) (min) (mg/1) (mg/1)

Limits:

(mg/1) 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 i Date:

I This outfall was not utilized during the reporting period.

l r I 1

e-- ' of Octobar:

  • . of Samples: 0 0 0 0 0 0 Avg. */alue: -- -- -- -- --

)

1:ax. Value: -- -- -- -- -- --

  • imits Exceeded:-- -- -- -- --

'br-b of Novamber-

o . of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- -- --
.ax, Value: -- -- -- -- -- --

Limits Exceeded:-- -- -- -- -- --

Month of Decembert

.:3. of Samples: 0 0 0 0 0 0

.;; y , jalue
-- -- -- -- -- --

. Max Valu .

l Limits Exceeded:-- -- -- -- -- --

6

l QUARTERLY OPERATIONAL MONITORING REPORT-Georgia Power Company b Plant E.I. Hatch From: 10-01-95 '

P.O. Box 4545 To: 12-31-95 ,

t

- Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Discharge Location: 01I - Unit one cooling. Tower Basin Drains Location: Blowdown Blowdown Blowdown Tower Basin 4

)

Type: Mitpl Tower Basin Mltpl Mitpl Grab Grab '

Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium ,

rel & avg. max, max.

(mg/1) (mg/l) (min) (mg/1) {

(mg/1) (mg/1)  !

Limits: 0.2 0.5 120 N/A 1.0 0.2 I PCS Code: 50064 50064 81400 50060 1092 Date:

1034 This outfall was not utilized during the reporting period. I l

vor-h of October-

-No. of Samples: 0 0 0 0 0 r

0  :

Avg. Value: -- -- -- -- -- --

Max. Value: -- -- -- -- -- --

Limits Exceeded:-- -- -- --

l i

i ver-S oE November-No. of Samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- --

Max. Value: -- -- -- -- -- --

Limits Exceeded:-- -- -- -- -- --

vorzh of December-No. of Samples: 0 0 0 0 0 0 AvgL. Value: -- -- -- --

Max. Value: -- -- -- -- ---

Limits Exceeded:-- -- -- -- ---

l 1

1 7 I 1

l

QUARTERLY OPERATIONAL MONITORING REPORT '

Georgia Power Company

. Plant E.I. Hatch From: 10-01 95 P.O. Box 4545 To: 12-31-95 ;

Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 - !

Discharge Location: 01J'- Unit One. Cooling Tower Basin Overflows I to Storm Drains +

! Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl/ Grab Mltpl/ Grab Mitpl/ Grab Grab Grab  !

Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter Parameter: 1/ Quarter i Fac Fac max. Total Time TRC Zinc Chromium rel & avg. max. max.

i (mg/1) , (mg/1) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 {

N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034-Date:

I This outfall was not utilized during the reporting period, 4 l

l l

    • e--h

^f Octcher

._of Samples: 0 0 0 0 0 0

' Avg. Value: -- -- -- -- --- ---

Max. Value: -- -- -- -- ---

Limits Exceeded: -- -- -- -- --- ---

I Morrh of November-i So. Of samples: 0 0 0 0 0 0 Avg. Value: -- -- -- -- -- --

. Max. Value: -- -- -- -- -- --

Limits Exceeded
-- -- -- -- -- --

MontS of December-No. of Samples: 0 0 0 0 0 0 A..g, value:

i Max, Valu..

Limits Exceeded: -- -- -- -- -- --

8

, _, .. . _ . _ _ _ . _ . _._ . . . - . _ . _ _ _ . _ _ . _ _ _ . _ ~ _ _ . _ - __ . _ _ _ _ .

l 1 l 1 QUARTERLY OPERATIONAL MONITORING REPORT l

Georgia Power Company Plant E.I. Hatch From: 10-01-95 P.O. Box 4545 To: 12-31 95 l

l Atlanta, Georgia 30302 NPDES Permit Number: GAOOO4120 l h

Discharge Location: 02B - Unit Two. Cooling Water Overflow To Storm Drains I i

l Location: Blowdown Blowdown Blowdown Tower Basin f- Tower Basin

} Type: Mitpl/ Grab Mltpl/ Grab Mitpl/ Grab Grab Grab  !

Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter 1/ Quarter Parameter: Fac Fac max. Total Time TRC Zinc Chromium i

rel & avg. max. max.

i f

(mg/1) (mg/l) (min) (mg/1) (mg/1) (mg/1) l Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 i Date:

! i t

This outfall was not utilized during the reporting period.

Month of Octobar-No. of Samples: 0 0 0- 0 0 0 Avg. Value: --- --- --- --- --- ---

Max. Value: --- --- --- --- --- --- >

Limits Exceeded:--- --- --- --- --- ---

1 l

1 Month of November

i. No. of Samples: 0 0 0 0 0 0 Avg. Value: --- --- --- --- --- ---

Max, Value: --- --- --- --- --- ---

i Limits Exceeded:--- --- --- --- --- ---

1 i

i Month of December:

, No. of Samples: 0 0 0 0 0 0

! Avg. Value: --- --- --- --- * --- --

Max. Value: --- --- --- --- --- -- ,

Limits Exceeded:--- --- --- --- --- -- ,

l 9 I l

l

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.1. Hatch From: 10-01-95 P.O. Box 4545 To: 12 31-95 Atlanta, Georgia 30302 NPDES Permit Number: GAOOO4120 Discharge Location: 02C - Unit Two cooling water overflow Location: Blowdown Blowdown Blowdown Tower Basin Tower Basin Type: Mltpl/ Grab Mltpl/ Grab Mltpl/ Grab Grab Grab Frequency: 1/ Week 1/ Week 1/ Week 1/ Quarter Parameter:

1/ Quarter Fac Fac max. Total Time TRC Zine Chromium rel & avg. max. max.

(mg/l) (mg/l) (min) (mg/1) (mg/1) (mg/1)

Limits: 0.2 0.5 120 N/A 1.0 0.2 PCS Code: 50064 50064 81400 50060 1092 1034 Date:

This outfall was not utilized during the reporting period.

v-- - ef O-tober-

Of Samples: 0 0 0 0 0 0 A /g . Value: --- --- --- --- --- ---

e:a x . Value: -- --- --- --- --- ---

Limits Exceeded:--- --- --- --- ---

vr-- of Nove-ber:

'o. of Samples: 0 0 0 0 0 0 A/g. Value: --- --- --- --- --- ---

.:a ;. . Value: --- --- --- --- --- ---

Limits Exceeded:--- --- --- --- --- ---

Month nf December:

.io , of Samples: 0 0 0 0 0 1

0 l A /g . Value: --- --- --- --- --- ---

a:- Value: --- --- --- --- --- ---

Limits Exceeded:--- --- --- --- --- ---

I i

10 i

1

l .

1 i.

QUARTERLY OPERATIONAL MONITORING REPORT l

Georgia Power Company t Plant E.I. Hatch From: 10-01-95 P.O. Box 4545 To: 12-31-95 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Discharge Location:

01E - Low Volume Waste (Liquid Radwaste System Unit One)

  • Type of Sample: Grab- i

! Frequency of Analysis: 2/ Month PCS Code: (530) (556)

Parameter: TSS O&G l Nitrite (Chill Water) Releases l mg/l mg/l to discharge point OSN 01

! Limits: Avg. 30 Avg. 15 Initial Amount

! Dilution Final Max.100 Max. 20 Conc. Drained Flow rate Conc.

,g,,(ppm)

(gallons) (gpm) (ppb) i Date:

10-02-95 0.5 0.0 -- -- -- --

l 10-07-95 -- --

1.6 6830 16000 6.7

'0-07-95 -- --

4.5 10950

' 17000 17.1 10-03-95 -- --

20 6740 17000 82.4- 1 l 10-08-95 -- --

12 6770 17000 I

48.0 1 10-09-95 -- --

12 10620 16000 47.3 l 10-09-95 -- --

23 6850 17000 93.4 10-09-95 -- --

25 10930 16000 100.0 10-09-95 -- --

30 6650 18000 111.7 10- $-$$ -- --

23 6170 16000 99.2 10-09-95 -- --

25 6840 17000 98.5 l 10-09-95 -- --

7 10930 17000 25.9

{ 10-10-95 -- --

23 6800 17000 89.3

'C-10-95 27 10950 18000 96.0 10-10-95 --

23 6340 15000 99.7 10-10-95 -- --

7 6300 18000 26.1 f 10-11-95 -- --

5 6430 16000 20.9 l 10-16-95 4,3 0.5 -- -- -- --

I 11-06-95 1.0 1.0 -- -- -- --

11-20-95 0.0 1.4 -- -- -- --

i I

! 12-04-95 1.4 0.0 -- -- -- --

. 12-19-95 1.0 1.0 -- -- -- --

l 11

_ - . . . _ . . . . . - . . . . - . - . . . _ . _ - - . - . - . . . . . . - . - . . . - ~ _ . _

QUARTERLY OPERATIONAL MONITORING REPORT  ;

Georgia Power Company Plant E.I. Hatch From: 10-01 95 ,

P.O. Box 4545 To: 12 31-95  !

l Atlanta, Georgia 30302

! NPDES Permit Number: GA0004120 '

t i

Month of October-l No'.'of Samples 2 2 16 16 16 16

! Average Value: 2.4 0.3 16.8 7944 16700 66'4 .

l Max. Value 4.3 0.5 30 10950 18000 111.7

! Limits Exceeded: 0 0 0 0 0 0 i

Month of November-No. of Samples 2 2 0 0 0 0' Average Value: 0.5 1.2 -- -- -- --

Max. Value 1.0 1.4 -- -- -- --

Limits Exceeded: 0 0 -- -- -- --  !

I' Month of December-No. of. Samples 2 2 0 0 0 0 i Average Value: 1.2 0.5 -- -- -- --

~

Max. Value 1.4 1.0 -- -- -- --

3 Limits Exceeded: 0 0- -- -- -- -- l

.]

I

\

1 I  !

l

\

l I

5 1 1

l 1

12 i

i

- _ - . . . . - - - - .~ .. -- . - . . _ - - . - . . - . - - - - - - . -

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.I. Hatch From: 10-01 95 P.O. Box 4545 To: 12 31-95 Atlanta, Georgia 30302.

NPDES Permit Number: GA0004120 -

Discharge Location: 02E - Low Volume Waste (Liquid Radwaste.. System I Unit Two)

  • Type of Sample: Grab Frequency of Analysis: 2/ Month PCS Code: (530) )'

(556)

Parameter: TSS O&G Nitrite (Chill Water) Releases l mg/l mg/l to discharge point OSN 02 i Limits: Avg. 30 Avg. 15 Initial ' Amount Dilution Final {

Max.100 Max. 20 Conc. Drained Flow rate Conc.  !

(ppm) (gallons) (gpm) (ppb)

Date-  ;

10-02-95 1.0 0.0 -- -- -- --

10-09-95 -- --

25 8723 15000 85.0 10-10-95 -- --

3.4 5008 15000 13.1 10-11-95 -- --

6.5 8725 12500 26.0 10-12-95 -- --

15 9507 14000 54.6 10-12-95 -- --

1.2 8999 12500 4.8 10-13-95 -- --

0.2 8759 14000 0.8 10-16-95 0.8 1.4 -- -- -- --

11-06-95 2.4 4.4 -- -- -- --

11-20-95 2.4 0.0 -- -- -- --

12-04-95 0.0 0.0 -- -- -- --

12-18-95 0.9 0.0 -- -- -- --

Month of October-No. of Samples 2 2 6 6 6 6 Average Value: 0.9 0.7 8.5 8286 13800 30.7 Max. Value 1.0 1.4 25 9507 15000 54.6 Limits Exceeded: 0 0 0 0 0 0 Month of November-No. of Samples 2 2 0 0 0 0 Average Value: 2.4 2.2 -- -- -- --

Max. Value 2.4 4.4 --

Limits Exceeded: 0 0 -- -- -- --

13

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.1. Hatch From: 10-01 95 P.O. Box 4545 To: 12 31-95 Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 Month of December-No. of Samples 2 2 0 0 0 0 Average Value: 0.5 0.0 -- -- -- --

Max, Value 0.9 0.0 -- -- -- --

Limits Exceeded: 0 0 -- -- -- --

l p

14

I l

l l

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.I. Hatch From: 10-01 95 P.O. Box 4545 To: 12 31-95 '

Atlanta, Georgia 30302 NPDES Permit Number: GAOOO4120  ;

Sewage Treatment Plant Sludge Disposal (1bs/ day / month) '

October November  :

December  :

Date 1bs Date lbs Date lbs l No sludge removed. No' sludge removed. No sludge removed. I i ,

l l I'

I i

{

i i

t$

l

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.I. Hatch From: 10-01-95 L P.O. Box 4545 : To: 12-31-95 Atlanta, Georgia 30302 NPDES Permit Number: GAOOO4120 f

Discharge Location:

01 - Combined Plant Waste Streams Unit One

. Frequency of Analysis: 1/ Week Type of Samples: In Situ Grab Grab Grab Parameter: Temperature T.R.C. F.A.C. pH Limits: Degree F N/A N/A Min. 6.0/ Max. 9.0 PCS Code: (11) (50060) (50064) (400)

Date1 10-02-95 89 0.0 0.0 8.3 10-09-95 78 0.0 0.0 7.3 10-16-95 80 0.0 0.0 7.1 10-23-95 73 0.0 0.0 7.1 10-30-95 71 0.0 0.0 7.3 11-06-95 77 0.0 0.0 7.8 11-13-95 62 0.0 0.0 7.2 11-20-95 66 0.0 00 7.2 11-27-95 60 0.0 0.0 7.2 l 12-04-I5 64 0.0 0.0 7.4 12-11-95 55 0.0 0.0 7.2

12-18-95 77 0.0 0.0 ~[. 9 12-25-95 69 0.0 0.0 7.7 Month of Octobert No. of Samples 5 5 5 5 l A/erage Value
78 0.0 0.0 7.4 Max, Value 86 0.0 0.0 8.3 Limits Exceeded: 0 0 0 0 i

Month of November-No. of Samples 4 4 4 4 i

! Average Value: 66 0.0 O JD 7.4

Max. Value 77 0.0 0.0 7.8 j Limits Exceeded
0 0 0 0 16

I l

QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.1. Hatch From: 10-01-95 P.O. Box 4545 To: 12-31-95 '

Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 <

l Month of December. I No. of Samples 4 4 4 1

4 '

Average Value: 66 0.0 0.0 7.5 Max, Value 77 0.0 0.0 7.9 Limits Exceeded: 0 0 0 0 1

I i

l l

I 1

j i

l l

l l

l l ,

l l

17

l QUARTERLY OPERATIONAL MONITORING REPORT 1

l. Georgia Power Company l ' Plant E.I. Hatch From: 10-01 95 '

l P.O. Box 4545 To: 12 31 95 L Atlanta, Georgia 30302 1

NPDES Permit Number: GA0004120 j. ,.

Discharge Location: 02 -

Combined Plant Waste Streams Unit Two 1

l i

Frequency of Analysis: 1/ Week Type of Samples: In Situ Grab- Grab Grab '

Parameter: Temperature T.R.C. F.A.C. pH Limits: Degree F t

N/A N/A Min. 6 0/ Max. 9.0 .

Code: (11) (50060) t.

(50064) (400)

Date

10-02-95 79 0.0 0.0 7.5 I

10-09-95 76 0.0 0.0 l 7.5 10-16-95 71- 0.0 0.0 7.2 l 10-23-95 68 0.0 0.0 7.0 10-30-95 68 0.0 0.0 7.6

11-06-95 62 0.0 0.0 7.4 11-13-95 55 0.0 0.0 7.2 11-20-95 59 0.0 0.0 7.0 11-27-95 60 0.0 0.0 7.4

! 12-04-95 64 0.0 0.0 7.4 12 '.1-95 55 0.0 0.0 7.4

  • 2-18-95 77 0.0 0.0 8.1 12-25-95 68 0.0 0.0 s

7.8

'Mn-h of October-i

':. of Samples 5 5 5 5 l .Aterage Value: 72 0.0 0.0 7.4 Max. Value 79 0.0 0.0 7.6 Limits Exceeded: 0 0 0 0 Month of November-3 No. of Samples 4 4 4 4 Average Value: 59 0.0 0.0 7. 3-

-Max. Value 62 0.0 0.0 7.4 i Limits Exceeded: 0 0 0 0 18

.__..___..o _ ._ __ _ . _ . _ _ . . . _ . . . . _ _ _ _ . . _ . _ . . . _ _ . - _ . . . . _ . _ _ _ . _ . . _ - . _ _ _ .

l t

! QUARTERLY OPERATIONAL MONITORING REPORT Georgia Power Company Plant E.l. Hatch From: 10-01-95 t P.O. Box 4545 To: 12 31-95 ;

l Atlanta, Georgia 30302 NPDES Permit Number: GA0004120 >

l 1 .

Month of December-l No. of' Samples 4 4 4 4 1

Average Value:

66 0.0 0.0 7.7 Max. Value 77' O.0 0.0 8.1 Limits Exceeded: 0 0 0- 0 f

I 1

l i

l I-w a

l i

19 l . _ , . . . -

1 l

QUARTERLY OPERATIONAL MONITORING REPORT  :

i  !

Georgia Power Company
. Plant E.I. Hatch From
10-01-95 f

} P.O. Box 4545 To: 12 31-95' i 1

- Atlanta, Georgia 30302 NPDES Permit Nember
GA0004120 1 i

. I 5

)

4 l l

l' i

i 1

I certify under the penalty of law that this document and all' i

\

i 3 attachments were prepared under my direction or supervision in accordance i

with a system designed to assure that qualified personnel properly' gather j' and evaluate the information submitted. Based on my inquiry of the person

} or persons who manage the _ system, or those persons directly responsible d for gathering the information, the information submitted is, to the best i i

of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalti- for submitting i

false information, i

including the possibility of fir.e and imprisonment for known violations.

e t

+ l

\

l i I i

I a

r H. L. Sumner, Jr.

. General Manager Nuclear Plant 20

1 1

1 l

)

ATTACIIMENT 2 Edwin I. Hatch Nuclear Plant - Units 1 and 2 Annual Environmental Surveillance Report 1995 Flow Monitoring and Characterization Study l

1 1

f IIL-5127 ENV-96-053

1 Georg a Fu er C Jrrear,

. Tower B s t:r; 17n Floor 333 Pie:mc.1t Aver .?

Atlan:a. Gec ; a 30306 Telephone 404 526 6526 C.M.Hobson L +

uanager Environmenta; Atta rs GeorgiaPower

.. <. .rvn c e 1, s,:w ..

i January 31,1996 NPDES PERMIT REOUIREMENTS l Flow Monitoring and Characterization Studies Annual Priority Pollutant Certification Mr. Lawrence W. Hedges Georgia Environmental Protection Division industrial Wastewater Program 205 Butler Street, S.E., Suite 1070 l

Atlanta.GA 30334

Dear Mr. Hedges:

t As required by the following NPDES Permits, attached are the Flow Monitoring and Characterization Studies for the referenced ple.nts:

Plant Arkwright NPDES Permit No. GA0026069 '

Plant Bowen NPDES Permit No. GA0001449 l

}. Plant Branch NPDES Permit No. GA0026051 '

Plant Hammond NPDES Permit No. GA0001457 l Plant Hatch NPDES Permit No. GA0004120 Plant McDonough/Atkinson NPDES Permit No. GA0001431 Plant Mitchell NPDES Permit No. GA0001465 Plant Vogtle NPDES Permit No. GA0026786 Plant Wansley NPDES Permit No. GA0026778 Plant Yates NPDES Permit No. GA0001473 Plant Scherer NPDES Permit No. GA0035564 in accordance with the provisions of the following NPDES permits, Georgia Power Company eenilles that no priority pollutants. other than chromium or zinc, are present in detectable amounts in the cooling water discharges of the referenced plants. This cenification is based on the manufacturer's certification for their products and applies to pollutants present as a result of their presence in water treatment chemicals added by Georgia Power Company and not their presence in raw water supplies.

l Plant Bowen .

NPDES Permit No. GA0001449 Plant Hatch NPDES Permit No. GA0004120 Plant Vogtle NPDES Permit No. G A0026786 Plant Wansley NPDES Permit No GA0026778 Plant Yates NPDES Permit No. GA0001473 Plant Scherer NPDES Permit No. GA0035564

I l , .

GeorgiaPower A Page Two January 31,1996 l Mr. Lawrence W. Hedges Ifyou have questions or require additional information, please contact Howard Sheinutt at (404)S26-7058.

i Sincerely, i h e __

C. M, Hobson HLS/sm Attachment '

i l

1 ey e og

1 l-t Georgia Power Company Plant E. I. Hatch 1995 Flow Characterization Study 1

INTRODUCTION l This now study was performed in accordance with Part III, Section B.9, of the Georgia Power Company, E.1. Hatch Nuclear l Generating Facility, National Pollutant Discharge Elimination System,(NPDES), Permit No. G A 0004120; issued by the State of l Georgia, Department of natural Resources, Environmental Protection Division, on December 1,1992.

BACKGROUND This study was conducted on the NPDES permitted waste streams using data collected during the time period of June 17 to June 30,1995. A description of the waste streams are as follows:

1. NON-CONTACT COOLING This system consisted of discharges from the Plant Auxiliary Heat Exchangers and the Diesel Generator Cooling. I The Plant Auxiliary Cooling Systems consisted of heat exchangers located in the control, radwaste, reactor, turbine and waste gas l

buildings. This system was supplied by the plant service water system and discharges into the circulating water system (cooling l towers) to provide make-up water. Flow rates were calculated using pump name plate data.

The Diesel Generator Cooling Water System was supplied by the plant service water system and discharges to the discharge structure mixing chamber via the radwaste discharge line. This system was used for cooling the emergency diesel generators.

The diesel generators for Unit One,(I A and IC), normally had a continuous flow of cooling water regardless of their operational ,

status. Unit One's diesel generator (IB) and Unit Two's diesel pnerators,(2A and 2C), were supplied with cooling water only I during system operation; which consisted of testing and emergencies. Flow rates and measurements were calculated using pump name plate data.

2. LOW VOLUME WASTE (NEUTRALIZATION TANK) 01G This waste stream consisted of demineralizer regeneration warte composed of sulfuric acid, sodium hydroxide and rinse water.

All regenerative waste was collected in a sump and recirculated into a 38,000 gallon aboveground tank until the pH was between J 6 and 9. De neutralization tank was discharged via gravity into the Unit One mixing chamber. The maximum flow rate achievable was calculated using the volume of the tank and the radius of the discharge pipe. The daily average flow rate was calculated by dividing the total volume discharged by the total minutes in the test period. The Dow rate measurements of this system were based on its calculated maximum flow rates and discharge duration.

3. LOW VOLUME WASTE (PRESSURE FILTER BACKWASH) 01H This waste stream consisted of backwash water originating from four pressure sand filters that preceded the demineralizer unit.

The backw ash waste gravity drair.ed into the neutralization tank discharge line. The maximum now rate achievable was based on the backwash pump name plate data. The daily average flow rate was calculated by using backwash flow rate data and operating J

times during the test period. The flow rate measurements of this system were based on flow indicators for each pressure filter. '

i

4. COOLING TOWER BLOWDOWN (UNIT ONE) 01A This waste stream consisted of discharges from the Unit One closed-loop circulating water system. Make-up water for this system was derived from non-contact auxiliary plant cooling water. The discharge originated at the circulating water pumps i discharge and was routed to the Unit One mixing chamber. The maximum flow rate achievable was based on the total pumping l capacity of the plant service water system. The daily average flow rate was calculated using the difference between the Unit One

! mixing chamber flow rates and the other Unit One waste streams. The flow rate measurements of this system were based on l mathematical computations relating this waste stream to all the others that were applicable.

F i

I S. COOLING TOWER BLOWDOWN (UNIT TWO) 02A This waste stream consisted of discharges from the Unit Two closed-loop circulating water system. Make-up water for this system was derived from the non-contact auxiliary p! ant cooling water. The discharge originated at the circulating water pumps discharge and was routed to the Unit Two mixing chamber. The maximum Dow rate achievable was based on the total pumping capacity of the plant service water system. The daily average now rate was calculated using the difference between the Unit Two mixing chamber now rates and the other Unit Two waste streams. The Dow rate measurements of this system were based on mathematical computations relating this waste stream to all the others that were applicable.

6. COOLING WATER OVERFLOW (UNIT ONE) 01B This waste stream consisted of discharges from the closed-loop circulating water system. Make-up water for the system originated from the non-contact auxiliary plant cooling water system. The discharge originated at the Unit One cooling tower nume and was routed to the Unit One mixing chamber. The maximum Dow rate achievable was based on the total pumping capacity of the plant service water system. The daily average Dow rate was calculated by dividing the total gallons discharged by the total minutes in the test period. The Dow rate measurements of this stream were based on the best conservative estimate at the I time of subsequent discharge.

NOTE: This waste stream was permitted for use in lieu of outfall number 01 A.

7. COOLING WATER OVERFLOW TO STORM DRAINS (UNIT ONE) 01J This waste stream consisted of discharges from the closed-loop circulating water system. Make-up water for the system originated from the non-contact auxiliary plant cooling water system. The discharge originated at the Unit One cooling tower basins and was routed to storm drains, then to the river. The maximum now rate achievable was based on the total pumping capacity of the plant service water system. The daily average flow rate was calculated by dividing the total gallons discharged by the total minutes in the test period. The Dow rate measurements of this stream were based on the best conservative estimate at the time of subsequent discharge.

NOTE: This waste stream was permitted for use in lieu of outfall number Ol A.

8. COOLING TOWER BASIN DRAINS (UNIT ONE) 01I This waste stream consisted of discharges from the closed loop circulating water system. Make-up water for the system originated from the non-contact auxiliary plant cooling water system. The discharge originated at the Unit One cooling tower basins and was routed to stonn drains. then to the river. The maximum flow rate achievable was based on the total pumping -

capacity of the plant service water system. The daily average Dow rate was calculated by dividing the total gallons discharged by l the total minutes in the test period. The now rate measurements of this stream were based on the best conservative estimate at the time of >ubsequent discharge. l NOTE: This w aste stream was permitted for use in lieu of outfall number 01 A. j

9. COOLING WATER OVERFLOW TO STORM DRAINS (UNIT TWO) 02B This waste stream consisted of discharges from the closed-loop circulating water system. Make-up water for the system orgmated from the non-contact auxiliary plant cooling water system. The discharge originated at the Unit Two cooling tower ba<ms and was routed to storm drains, then to the river. The maximum now rate achievable was based on the total pumping capacity of the plant service water system. The daily average Dow rate was calculated by dividing the total gallons discharged by the total minutes in the test period. The Dow rate measurements of this stream were based on the best conservative estimate at the time of subsequent discharge.

NOTE: This waste stream was permitted for use in lieu of outfall number 02A.

10. COOLING WATER OVERFLOW (UNIT TWO) 02C

( lhis waste stream consisted of discharges from the closed-loop circulating water system Make-up water for the system

orginated from the non-contact auxiliary plant cooling water system. The discharge originated at the Unit Two cooling tower Oume and was routed to the Unit Two mixing chamber. The maximum now rate achievable was based on the total pumping l capacity of the plant sersice water system. The daily average now rate was calculated by dividing the total gallons discharged by l

2

4 O

l the total minutes in the test period. The flow rate measurements of this stream were based on the best conservative estimate at the time of subsequent discharge.

NOTE: This waste stream was permitted for use in lieu of outfall number 02A. '

1

11. LOW VOLUME WASTE (LIQUID RADWASTE SYSTEM, UNIT ONE) 01E

) This waste stream consisted of waste water generated primarily in the reactor and turbine buildings. Examples of the waste water

( sources were floor drains, laundry drains, laboratory drains, seal cooling waters and bearing cooling waters. The collective waste l was filtered and demineralized then discharged to the Unit One mixing chamber or reused in-plant depending on the chemical

! and radiological quality. the maximum flow rate achievable was derived from the pump name plate data. The average daily flow

was calculated by dividing the total volume discharged by the total minutes in the test period. The flow rate measurements of this i

stream were based on integrator readings and discharge duration.

12. LOW VOLUME WASTE (LIQUID RADWASTE SYSTEM, UNIT TWO) 02E l This waste stream consisted of waste water generated primarily in the reactor and turbine buildings. Examples of the waste water sources were floor drains, laboratory drains, seal cooling waters and bearing cooling waters. The collective waste was filtered and demineralized, then discharged to the Unit Two mixing chamber or reused in-plant depending on the chemical and radiological quality. The maximum flow rate achievable was derived from the pump name plate data. The average daily flow was calculated by dividing the total volume discharged by the total minutes in the test period. The flow rate measurements of this stream were based on integrator readings and discharge duration.
13. COMBINED WASTE STREAMS (UNIT ONE) 01 This waste stream consisted of the total volume of all liquid waste being discharged from Unit One. The maximum flow rate was achieved using the total surface water pumping capacity on plant site. The daily average discharge was calculated from the Unit One daily discharge flow rates during the test period. The flow rate measurements were based on readings obtained from flow  !

rate strip charts.

1

14. COMBINED WASTE STREAMS (UNIT 7WO) 02 This waste stream consisted of the total volume of all liquid waste being discharged from Unit Twe. The maximum flow rate was achies ed using the total surface water pumping capacity on plant site. The daily average discharge was calculated from the Unit Tuo daily discharge flow rates during the test period. The flow rate measurements were based on readings obtained from flow rate strip charts.
15. INTAKE SCREEN BACKWASH 03 This waste stream consisted of river water being used continuously to backwash the plant's traveling water intake screen. The ris er water used to backwash the intake screen was gravity fed back to the river. The intake screens are backwashed approximately twice per day per unit for a total run time of both units of 120 minutes. This flow rate was estimated using pump plate data.
16. INTAKE STRAINER BACKWASH 03A This waste stream consisted of river water being used periodically to backwash the plant's intake pump's strainers. The river water used to backwash the intake strainers was fed back to the river via the stillwell associated with the intake. The intake l strainers ( 4 total ) are backwashed approximately once per shift for a combined units total of 24 minutes per day. This flow rate l was estimated using pump plate data.
17. 2P65 CHILLER WATER BLOWDOWN 04 l This waste stream consisted of discharges from the Unit Two Reactor Building and the Radwaste Building closed-loop circulating w ater systems. Make-up water for this system originated from the plant sanitary water system. The maximum flow rate i achievable was calculated using the pump name plate data. The daily average flow rate was calculated by dividing the total I

3

_ .____.m _ . . _ _ _ _ _ . . ___ . .___ ___._._ < _.__ _._ .. . . -__ _ . _ _ _ _ . _ _ _ . _ .

gallons of water discharged by the total minutes in the test period. The flow rate measurements were based on engineering data reviews.

18. SEWAGE TREATMENT EFFLUENT 01F This waste stream consisted of the plant domestic sewage waste that was created by two aeration package treatment plants.

! Discharge from this facility was routed to the Unit One mixing chamber. The maximum flow rate achievable was calculated l using the designed capacity of the aeration plants. The daily average flow rate was calculated by dividing the total gallons of l water discharged by the total minutes in the test period. The flow rate measurements were based on readings obtained from a l flow rate strip chart.

l l

i i

b.

l l

l I

h l

I 4

1 .

Georgia Power Company Pitnt E. L Hatch 1995 Flow Characterization Study l

llOutfalls Number:J.andiNamet x iMaximum%(ggpmg.);y (Daily /AverageR(ggpm)j f Non-Contact Cooling Water 3,500 1,420 (a)

( Diesel Generator Cooling) l j

Non-Contact Cooling Water 68,000 45,000 (i) l

( Plant Auxiliary Systems )

OlG Low Volume Waste 650 7 (b)

( Neutralization Tank )

01H Low Volume Waste 1,050 2(c)

( Pressure Filter Backwash )

Ol A Cooling Tower Blowdown 34,000 (0 18,150

( Unit One) 02A Cooling Tower Blowdown 34,000 (0 9,382

( Unit Two )

j 01B Cooling Water Overflow ( Unit One ) 34,000 (0 0 01J Cooling Water Overflow to Storm 34,000 (0 0 Drains ( Unit One )

Oil Cooling Tower Basin Drains 34,000 (0 0

( Unit One )

028 Cooling Tower Overflow to Storm 34,000 (0 0 Drains ( Unit Two )

02C Cooling Water Overflow 34,000 (0 0

( Unit Two )

01 E Low Volume Waste . Liquid Radwaste 100 9 (d)

( Unit One )

02E Low Volume Waste . Liquid Radwaste 100 11(e)

( Unit Two )

01 Combined Plant Waste Streams 50,000 19,607

( Unit One ) ~

02 Combined Plant Waste Streams 50,000 9,393 l

( Unit Two )  ;

03 Intake Screen Backwash 500 8 (g) 03 A Intake Strainer Backwash 500 3 (g) 04 2P65 Chiller Water Blowdown 500 1(h)

Ol F Sewage Treatment Plant 50 20 5

Georgim Pcwsr Ccmptny Pl. int E. I. Hetch 1995 Flow Characterization Study j FOOTNOTES I (a) The daily average flow rate for cooling water for the diesel generators 1,400 gpm. However, during the flow study test period, the diesels operated only 9.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

]

(b) Dunng the sample period, 196,500 gallons were discharged in 12 batches. l (c) Actual backwash time during the two week period was 40 minutes at a rate of 710 gpm and 40 minutes 1 at a rate of 250 gpm.

(d) During the sample period, 197,382 gallons of waste water were discharged from the Unit One mixing chamber in 28 batches.

l (e) During the sample period,201,567 gallons of waste water were discharged from the Unit Two mixing chamber in 31 batches.

(f) This figure reflects the total surface water withdrawal capabilities at the plant consisting of service water capacity of 68,000 gpm and residual heat removal (RHR) piping capacity of 16,000 gpm. RHR is used primarily during plant shutdown.

(g) Under normal operating conditions, the Intake Screen Backwash and intake Strainer Backwash discharges at a daily average rate of 412 gpm.

l l

(h) Under normal operating conditions, the 2P65 Chiller Water Blowdown discharges at a daily average rate of 5 gpm.

(1) Under normal operating conditions the Unit One Auxiliary System uses approximately 22,000 gpm and under normal operating conditions the Unit Two Plant Auxiliary System uses approximately 21,250 gpm.

I 6

WATER TREATMENT CIIEMICAL INVENTORY This is a list of the chemicals used at Plant Edwin I. Hatch Nuclear Plant for the purpose of water treatment:

1. AC 3323 (scale and corrosion inhibitor)
2. Borax
3. Boric Acid
4. Orthophosphate (Ancool 3213, ALS-34s-220)
5. Calgon H-640
6. Calgon H-300
7. Sanuril 115 (Calcium Hypochlorite)
8. Sodium Hydroxide
9. Sodium Hypochlorite (MLP30 GAL)
10. Sodium Nitrite (Ancool 3733,3735,3730)
11. Sodium Pentaborate
12. Sulfuric Acid (SA230 GAL)
13. Power Boost j i
14. Tower Brom I 4

HL-5127 ENV-96-053

PLANT E.1. HATCH NPDES FLOW CHARACTERIZATION STUDY -

UNIT ONE FINAL PLANT DISCHARGE l l UNITTWO FINAL PLANT DISCHARGE 01/ 50000 gpm UNIT ONE UNIT TWO 02 / 50000 gpm MIXING BOX MIXING BOX UNIT ONE COOUNG WATER OVEHFLOW y A A an ,- UNIT TWO COOUNG WATER OVEHFLOW fn o uon oom e2c uwoapm UNIT ONE UNIT TWO ~ "

10,',"

em s xio -

c"'"a COOUNG TOWERS f

g COOUNG TOWERS aEN" = 4 g

. , - - =

gg =

3 g g ,

CIRC. g g 6 CIRC.

A WATER ( "g e $ WATER __

PUMPS o j 8 g PUMPS 1r o 6 l 1r u CONDENSER Sh n I CONDENSER d

i I

! I I I I

WT ONE Aux DESEL OEN. LOW WOLUME LOW WOLUME SEWAGE ggg g y NON CONTACT NON CONTACT WASTE WASM TREATMENT VASTE PRESSUR
NON MTACT P95 CML1ER N WATER X3OUNO WATER RADWASTE 01F M WATER yATER 9LOWDOWe ILTER BACKWAsie RADWASTE P 700(simMeest ciEi100mm, 50 - et gim 02E/ @ gam 1 I I I I I I I _

%=__ 666

____ 6 6 6 _ _6 _ 6_ 6 .__ m 5

-- ^2 _22=- = rso - % ava 225= -

A mx,ooo- -

,,A A

_ - _ _ _ _ .- _ . - _ . _ _ _ _ _ _ _ _ _ _ . - - _ _ _ _ - _ _ __ _ _ _ _ _ _ _ _ _ _ _ -_ _ _ m ___ w -et-

y.'

4 Interoffice Correspondence GeorgiaPower A  !

DATE: 09 October 1995 RE: PL ANT E.I. HATCH Priority Pollutant / Metal Cleaning Waste Certification Log: LR-GM-003-1095 RType: A04.43 l

FROM: H. L. Sumner, Jr. l TO: S. D. Holder l

l l

This is to certify that metal cleaning wastes were neither generated nor discharged within the past twelve months from Georgia Power Company Plant E. I. Hatch. This is to also certify that no Priority Pollutants other than Chromium and Zinc above detectable limits were discharged out of outfalls 01 A,02A,01 B,02B,02C, or 01J ( cooling tower blowdowns, or overflows ). This document satisfies the reporting requirements as prescribed in Part III Section B. Special Requirements of NPDES Permit No. GA 0004120.

1 If there are any concerns regarding any of this please contact Byron Feimster at extension 8-692- 1 2591.

e ..

f 0/AA _ imwi^- - 1 H. L. Sumner, Jr.

General Manager Nuclear Plant

& .J w yw CTM:WBK:WED:bkf xc: file

. ..