HL-5773, 1998 Annual Environ Operating Rept (Nonradiological), for Ei Hatch Plant,Units 1 & 2.With

From kanterella
Revision as of 23:30, 2 July 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
1998 Annual Environ Operating Rept (Nonradiological), for Ei Hatch Plant,Units 1 & 2.With
ML20205T071
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/31/1998
From: Sumner H
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HL-5773, NUDOCS 9904270127
Download: ML20205T071 (3)


Text

.

tawis Sunumr Seethern Nuclear

  • Vee President Operating Company, loc. j Hatch Project Support 40 invemess Parkway i Post Office Box 1295 Birmingham. Alabama 35201 Tel 205.992.7279 Fax 205.992.0341 SOUTHERN COWLPANY Energy to SernYour%rld*

Docket Nos. 50-321 HL-5773 50-366 U.S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, D.C. 20555 Edwin 1. Hatch Nuclear Plant Annual Environmental Operating Report Ladies & Gentlemen:

In accordance with the Edwin 1. Hatch Nuclear Plant Units 1 and 2 Environmental Protection Plan, Appendix B to Facility Operating Licenses DPR-57 and NPF-5, Subsection 5.4.1, Southern Nuclear Operating Company is submitting the enclosed Annual Emironmental Operating Report for 1998.

If you have any questions in this regard, please contact this office.

Sincerely, 4 E-  % i H. L. Sumner, Jr.

AHM/eb gT f

Enclosure:

Annual Environmental Operating Report for 1998 l l

cc: Southern Nuclear )peratine Comnaay Mr. P. H. Wells, Nuclear Plant General Manager SNC Document Management (R-Type A02.001)

~ ,.,q

' i V ' g 1Mr.U.S. Nuclear L. N. Olshan, Reculatory Project Commission. Washincton. D.C, Manager - Hatch U.S. Nuclear Regulatory Commission. Region 11 Mr. L. A. Reyes, Regional Administrator Mr. J. T. Munday, Senior Resident inspector - Hatch 9904270127 990420 PDR ADOCK 05000321 R

PDR .'

c. ..

L L ,

Enclosure EDWIN I. HATCH NUCLEAR PLANT - UNITS 1 AND 2 ANNUAL ENVIRONMENTAL OPERATING REPORT (NONRADIOLOGICAL) 1998 INTRODUCTION This report is submitted in accordance with Subsection 5.4.1 of the Edwin 1. Hatch Nuclear Plant Environmental Protection Plan, Appendix B to Facility Operating License DPR-57 and NPF-5. This repon is submitted describing implementation of the Environmental Protection Plan for the calendar year 1998.

REPORTING REOUIREMENTS A. Summaries and Analyses of Results of Environmental Monitoring Activities for the Reporting Period in Accordance with Environmental Protection Plan (EPP)

Subsection 4.2

1. Aquatic Monitoring - Liquid effluent monitoring was performed in accordance with the State of Georgia National Pollutant Discharge Elimination System (NPDES) Pennit GA0004120; there was no additional requirement for aquatic monitoring during 1998.
2. Terrestrial Monitoring - Terrestrial monitoring is not required, t
3. Maintenance of Transmission Line Corridors - There were no applications of )

herbicides within any of the Edwin I. Hatch Nuclear Plant transmission line corridors during 1998.

B. Comparisons of the 1998 Monitoring Activities With Preoperational Studies, Operational Controls, and Previous Nonradiological Environmental Monitoring Reports These comparisons were not required because no nonradiological emironmental monitoring programs were conducted during the reponing period beyond those performed in accordance with NPDES Permit No. GA0004120.

C. Assessment of the Observed Impacts of Plant Operation on the Environment There were no significant adverse emironmental impacts associated with plant operation i during 1998.  !

l l

1 l

HL-5773 E-1 i

)

. Enclosure Edwin I. Hatch Nuclear Plant - Units I and 2 Annual Environmental Operating Report - 1998 i .

D. EPP Noncompliance and Corrective Actions There were no EPP noncompliances during 1998.

E. Changes in Station Design or Operation, Tests, or Experiments Made in Accordance with EPP Subsection 3.1 Which Involved a Potentially Significant Unreviewed Environmental Question here were no changes in station design or operation, tests, or experiments in 1998 which involved a potentially significant unreviewed environmental question.

F. Nonroutine Reports Submitted in Accordance with EPP Section 5.4.2 There were no nonroutine reports submitted in 1998.