ML22153A476

From kanterella
Revision as of 09:39, 29 June 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day
ML22153A476
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/28/2022
From: Bruce Bartlett
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Bartlett B
Shared Package
ML20136A321 List:
References
Download: ML22153A476 (5)


Text

Clinton Power Station 8401 Power Road Clinton, IL 61727 Exelon Generation .

U-604644 November 1, 2021 Regional Administrator, Region Ill U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials, which Clinton Power Station (CPS) is submitting in support of the initial license exam scheduled for the weeks of 01/17/21 through 01/28/21, at CPS.

This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.

These examination materials have been developed in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. Please note that reference materials are included in the package.

Some modifications or adjustments to the examination material may be required due to procedural changes.

In accordance with NUREG-1021, Revision 11, Section ES-201, please ensure that these materials are withheld from public disclosure until after the examinations are complete.

There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter please contact Mr. Trevor Krawcyk, Senior Manager Site Training at (217) 937-4000. For questions concerning examination materials please contact Mr. Matthew Beeler, Lead Operations Instructor, at (217) 937-4078.

Respectfully,

~

Thomas D. Chalmers Site Vice President Clinton Power Station

U.S. Nuclear Regulatory Commission U-604644 Page 2 of 2

Enclosures:

(Mailed to Bruce Bartlett, NRC Region Ill Chief Examiner)

  • RO/SRO Composite Examination with references attached Control Room Systems and Facility Walk-Through Job Performance Measures with references attached
  • Integrated Plant Operation Scenario Guides Completed Checklists:
  • Operating Test Quality Checklist (Form ES-301-3)
  • Simulator Scenario Quality Checklist (Form ES-301-4)
  • Written Exam Quality Checklist (Form ES-401-6)
  • Examination Security Agreements (Form ES-201-3)

Record of Rejected K/As (Form ES-401-4) cc: Chief, NRC Operator Licensing Branch (without Enclosures)

NRC Senior Resident Inspector - Clinton Power Station (without Enclosures)

NRC Project Manager, NRR - Clinton Power Station (without Enclosures)

NRC Document Control Desk (without Enclosures)

U-604644

Subject:

Submittal of Integrated Initial License Training Examination Materials Bee: (without Enclosures)

Site Vice President - Clinton Station Regulatory Assurance Manager - Clinton Station Vice President - Licensing and Regulatory Affairs Director, Licensing - Cantera Manager, Licensing - Clinton Station Clinton Station Nuclear Licensing Administrator Exelon Document Control Desk Licensing (Hard Copy)

Exelon Document Control Desk Licensing (Electronic Copy)

Human Resources - Clinton Station Training Manager - Clinton Station

Exelon Generation LS-AA-117-1002 Revision 4 Page 1 of 1 LICENSING AND REGULATORY AFFAIRS CORRESPONDENCE CONCURRENCE FORM Station(s): Clinton Power Station Correspondence No.: U-604644 Subject/Document: __S~u=b___m~i=tt=al___o___f. .1. .n=i=tia=l~L=ic~e....n~se'------T~ra=in~i'"""ng---=E____x=am-----'"'-'-in=a=tio=n-'-----

Document Prepared by: Chelsie Miller Location: _B8_ Extension: '""x2=8=--=1'--'-1_ __

Required Review and Disciplines Assigned by: __C_.M_ill.e_r . . . ~/_R_e_g_u.la. . .___

to~ry~S_p_ec_i_al~is. .t. ._ _ _ __

Title Due Date: _T~B~D~--

Type of Review Required: D Technical Verification Team Review (Reference LS-AA-117) x Individual or Series Review D No Technical Review Note: If the subject document falls within the scope of AD-AA-102, "Station Qualified Review," one of the reviewers must be a Station Qualified Reviewer.

Disciplines Required:

D Maintenance D Radiation Protection D Chemistry x Training D Operations D Engineering - l&C D Radwaste x Reg Assurance / Licensing D Rx Engineering D Design Engineering D Engr - Mech Systems D Programs Engineering D Nuclear Fuels D Work Management D Engr - Elect Systems D Other: _ _ _ _ _ __

Review Concurrence: Signature indicates that the individual has reviewed the subject document and concurs that the content is factual and accurate. Concurrence via e-mail shall be provided using the declaration provided in LS-M-117.

Disci line Date Matthew Beeler/ 6 Training Trevor Krawcyk / Training Does this letter contain commitments? D Yes X No If yes, corporate or site commitment coordinator has been notified: _ _ _ _ _ _ _ Date:

Required Reviews and Signatures (check as appropriate):

D Station Qualified Review Required: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date:

0 PORC Approval Required: PORC Meeting No. _ _ _ _ _ _ _ _ _ _ __

Corporate Licensing Concurrence Required: ----.fu~. --+........,....-:rl---

_-,--++-------- Date:

X Site Regulatory Assurance Concurrence Required: -~==-- ...........~ - - - - - - - - Date: i . ./' Z-\ I X Site Vice President Approval Required: ___

SRRS Record ID: 5A.113 (Destroy at Option (DAO))

ssg Station Manager Approval Required : - - - . . . - - - - - - - - - - - - - - -Date:

~ - - i - - - - - - - - - - - Date: It /,l1,,(

Exelon Generation ~ LS-AA-117-1002 Revision 4 Page I of I LICENSING AND REGULATORY AFFAIRS CORRESPONDENCE CONCURRENCE FORM Station(s): Clinton Power Station Correspondence No.: U-604644 Subject/Document: __S=-u=b=-m-'-'=itt=a'--Io._.f"""In"'"'i=tia=l--=L=ic"""e""'n=se~T"'"'ra=in"'"'i-'---nq----=E=x=am""""'"in=a=ti=on'-'--_ _

Document Prepared by: Chelsie Miller Location: RA Extension: ~x2=8~1~1_ __

Required Review and Disciplines Assigned by: __C~.M=ill=e'--r__/..:..R=e=g=ul=a=to'-'-rys...-:::;S=pe=c=ia=l=is"--t_ _ _ __

Title Due Date: _T_B_D_ __

Type of Review Required: D Technical Verification Team Review (Reference LS-AA-117) X Individual or Series Review D No Technical Review Note: If the subject document falls within the scope of AD-AA-102, "Station Qualified Review," one of the reviewers must be a Station Qualified Reviewer.

Disciplines Required:

D Maintenance D Radiation Protection O Chemistry X Training D Operations D Engineering- l&C O Radwaste X Reg Assurance / Licensing D Rx Engineering D Design Engineering D Engr - Mech Systems D Programs Engineering D Nuclear Fuels D Work Management D Engr - Elect Systems D Other: _ _ _ _ _ __

Review Concurrence: Signature indicates that the individual has reviewed the subject document and concurs that the content is factual and accurate. Concurrence via e-mail shall be provided using the declaration provided in LS-AA-117 .

Print Name/ Sianature Discipline Date Matthew Beeler/ Training Trevor Krawcyk / Krawcyk, Trevor J. ~~~~~~'~21:~1";:9b~s~;~~~.~;~or J Training Does this letter contain commitments? D Yes X No If yes, corporate or site commitment coordinator has been notified: ________ Date:

Required Reviews and Signatures (check as appropriate):

D Station Qualified Review Required : _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date:

PORC Approval Required: PORC Meeting No.

D Corporate Licensing Concurrence Required: _ _ _ _ _ _ _ _ _ _ _ _ _ _Date:

X Site Regulatory Assurance Concurrence Required: _ _ _ _ _ _ _ _ _ _ _ _ Date:

O Station Manager Approval Required: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date: _ __

X Site Vice President Approval Required: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date:

SRRS Record ID: SA.113 (Destroy at Option (DAO))