ML22157A387
ML22157A387 | |
Person / Time | |
---|---|
Site: | Clinton ![]() |
Issue date: | 01/28/2022 |
From: | Beeler M NRC/RGN-III/DRS/OLB |
To: | Bruce Bartlett NRC/RGN-III |
Bartlett B | |
Shared Package | |
ML20136A322 | List: |
References | |
Download: ML22157A387 (1) | |
Similar Documents at Clinton | |
---|---|
Category:E-Mail
MONTHYEARML23363A0302023-12-29029 December 2023
[Table view]NRR E-mail Capture - Preliminary RAIs for Clinton Partial Site Release ML23338A0402023-12-0404 December 2023 NRR E-mail Capture - Ready for Clean TS Pages and Updated Review Hours for Clinton Power Station, Unit 1, Request for License Amendment to Revise Technical Specifications Section 3.8.3 ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23261A0032023-09-15015 September 2023 NRR E-mail Capture - NRC Acceptance Review of Clinton Amendment Request to Revise Timing of Reactor Water Cleanup Isolation Valves ML23230B1682023-08-18018 August 2023 NRR E-mail Capture - Clinton Power Station, Unit 1, Preliminary Requests for Additional Information (Rais) Related to the Amendment Request to Revise Diesel Generator Starting Air Technical Specifications ML23219A2142023-08-0404 August 2023 NRR E-mail Capture - NRC Acceptance Review of Clinton Request for Partial Site Release ML23194A1102023-07-13013 July 2023 NRR E-mail Capture - Non-acceptance of Clinton Request for Partial Site Release ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23087A0122023-03-28028 March 2023 NRR E-mail Capture - NRC Acceptance Review of Clinton License Amendment Request to Revise Technical Specifications 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air (L-2023-LLA-0034) ML23033A0332023-02-0101 February 2023 NRR E-mail Capture - NRC Acceptance Review of Clinton License Amendment Request to Adopt TSTF-332 (L-2023-LLA-0007) ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22301A0902022-10-28028 October 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22173A0382022-06-21021 June 2022 NRR E-mail Capture - Request for Additional Information (RAI) Regarding Clinton License Amendment Request for Secondary Containment Design Basis (L-2022-LLA-0055) ML22165A1902022-06-14014 June 2022 NRR E-mail Capture - NRC Acceptance Review of Clinton Request to Adopt TSTF-230 (L-2022-LLA-0076) ML22165A1912022-06-14014 June 2022 NRR E-mail Capture - NRC Acceptance Review of Clinton Request to Adopt TSTF-269 (L-2022-LLA-0077) ML23089A0182022-05-24024 May 2022 NRR E-mail Capture - Clinton Power Station Acceptance Review Results - Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan ML22116A0422022-04-26026 April 2022 NRR E-mail Capture - NRC Acceptance Review of Clinton License Amendment Request to Revise Secondary Containment Design Basis ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21225A0392021-08-13013 August 2021 NRR E-mail Capture - Preliminary Request for Additional Information Regarding Clinton Request to Revise Degraded Voltage Instrumentation Setpoints ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21203A3062021-07-21021 July 2021 NRR E-mail Capture - NRC Acceptance Review - Clinton - Third Inservice Inspection Interval Relief Request I3R-18 ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21182A0722021-06-29029 June 2021 SUNSI and Proprietary Review Determination Email Regarding: Tn CoC 1042 (Eos) Amendment 3 Rsi Responses ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21057A1012021-02-26026 February 2021 NRR E-mail Capture - Clarification of Second Round RAI - Clinton TSTF-505 License Amendment Request ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21057A1002021-02-17017 February 2021 NRR E-mail Capture - Second Round RAI - Clinton TSTF-505 License Amendment Request ML21041A5442021-02-10010 February 2021 NRR E-mail Capture - NRC Acceptance Review for Clinton Request for License Amendment to Revise Degraded Voltage Relay Allowable Values (L-2021-LLA-0005) ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML20350B5602020-12-15015 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-582 and TSTF-583-T (EPIDs L-2020-LLA-0253 and L-2020-LLA-0254) ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20346A1012020-12-11011 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for an Alternative to Use ASME Code Case N-893 (EPIDs L-2020-LLR-0147 and L-2020-LLR-0148) ML20307A6592020-10-27027 October 2020 NRR E-mail Capture - Request for Additional Information Regarding TSTF-505 and 50.69 Applications ML20266G3032020-09-22022 September 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use Paragraph IWA-5120 of the 2017 Edition of the ASME B&PV Code, Section XI ML20295A4952020-08-27027 August 2020 NRR E-mail Capture - NRC Preliminary Audit Plan for Clinton TSTF-505 and 50.69 Submittals ML20191A0182020-07-0101 July 2020 NRR E-mail Capture - Exelon Fleet RR for SPI for Appendix J Valves 2023-09-22 Category:License-Operator MONTHYEARML23258A0212023-09-15015 September 2023
[Table view]Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A4782022-01-28028 January 2022 ES-301-3 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22153A4682022-01-28028 January 2022 ES-301-4 ML22153A4722022-01-28028 January 2022 ES-301-6 ML22010A0992022-01-11011 January 2022 Operator Licensing Examination Approval ML21215A5732021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21174A3062021-06-25025 June 2021 Confirmation of Initial License Examination IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 ML21144A2312021-04-13013 April 2021 Post Exam Submittal Letter ML21144A2382021-04-13013 April 2021 ES-301-6 ML21144A2582021-04-13013 April 2021 Scenarios ML21144A2232021-04-13013 April 2021 ES-201-1 ML21144A3032021-04-13013 April 2021 Administered RO Written Exam ML21144A2292021-04-13013 April 2021 ES-201-3 ML21144A3222021-04-13013 April 2021 ES-401-3 ML21144A2152021-04-13013 April 2021 ES-401-4 ML21144A3192021-04-13013 April 2021 ES-301-2 ML21144A3232021-04-13013 April 2021 ES-D-1 ML21144A3132021-04-13013 April 2021 Administered SRO Written Exam ML21144A2682021-04-13013 April 2021 SRO Admin JPM 2023-09-15 Category:Part 55 Examination Related Material MONTHYEARML23258A0212023-09-15015 September 2023
[Table view]Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22153A4722022-01-28028 January 2022 ES-301-6 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22153A4782022-01-28028 January 2022 ES-301-3 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 ML22153A4682022-01-28028 January 2022 ES-301-4 ML22010A0992022-01-11011 January 2022 Operator Licensing Examination Approval ML21215A5732021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21174A3062021-06-25025 June 2021 Confirmation of Initial License Examination IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 ML21144A2232021-04-13013 April 2021 ES-201-1 ML21144A2102021-04-13013 April 2021 Ile Outline Review Comments ML21144A3232021-04-13013 April 2021 ES-D-1 ML21144A2302021-04-13013 April 2021 ES-403-1 ML21144A3222021-04-13013 April 2021 ES-401-3 ML21144A3202021-04-13013 April 2021 ES-401-1 ML21144A3192021-04-13013 April 2021 ES-301-2 ML21144A3102021-04-13013 April 2021 Administered Sim JPM ML21145A0332021-04-13013 April 2021 ES-201-2 Written Outline ML21145A0442021-04-13013 April 2021 Operating Test Outline Submittal Letter ML21145A0362021-04-13013 April 2021 ES-201-2 ML21145A0402021-04-13013 April 2021 ES-301-5 2023-09-15 |
Text
To: Bruce Bartlett, NRC Chief Examiner From: Matthew Beeler, Clinton Power Station NRC Exam Author Date: 1/28/2022
Subject:
ILT 20-1 NRC Post Exam Submittal Package Enclosed you will find the ILT 20-1 NRC submittal package for the exam administered 1/18/22-1/27/22.
Package contents:
Volume 1:
Submittal letter Post-exam letter Photocopy of ungraded answer sheets Applicant's original answer sheet and examination cover sheet ES-403-1 Written Examination Grading Quality Checklist Written exam seating chart Candidate questions and proctor responses Post-exam candidate comments ES-201-3 Examination Security Agreement Volume 2: RO &SRO written exam answer keys As previously discussed, please hold the contents of the written exam from public disclosure for a period of two years.
Sincerely, 1f!!!:z) J CPS Lead Regulatory Exam Author