ML20210C377

From kanterella
Revision as of 15:56, 4 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests Review of Encl Draft Repts Entitled, Review of Westinghouse Advanced PWR (Wapwr) Probabilistic Safety Study & Assessment of Core Melt Progression & Fission Product Releases for Wapwr .... within 60 Days.W/O Encls
ML20210C377
Person / Time
Site: 05000601
Issue date: 04/30/1987
From: Kenyon T
Office of Nuclear Reactor Regulation
To: Johnson W
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 8705060173
Download: ML20210C377 (3)


Text

_ -- -_ _ - _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -_ - _____________________ _____________ - ____ ______ ___ -

)

April 30, 1987 Docket No. 50-601 Mr. W. J. Johnson, Manager Nuclear Safety Department Westinghouse Electric Corporation Water Reactor Division Box 355 Pittsburgh, Pennsylvania 15230

Dear Mr. Johnson:

SUBJECT:

DRAFT REPORTS REGARDING PROBABILISTIC SAFETY STUDY FOR THE RESAR SP/90 As part of our ongoing review of your application for a Preliminary Design Approval (PDA) for the RESAR SP/90 Advanced PWR, we contracted with Brookhaven National Laboratory (BNL) to assist us in our review of Module 16 "Probabilistic Safety Study." For your information, attached are two draft reports from BNL, entitled: "A Review of the WAPWR Probabilistic Safety Study,"

and " Assessment of Core Melt Progression and Fission Product Releases for the WAPWR Design."

We request that you review these reports, and provide us with your comments within 60 days of the date of receipt of this letter. Note that these are draft reports and have undergone only preliminary review by the NRC staff.

Review of this matter is still underway, and the conclusions reached in these reports are subject to change.

The material contained in these enclosures is considered to be proprietary and, therefore, is being withheld from public disclosure per 10 CFR 2.740. If you have any questions concerning this matter, please contact me at(301)492-7064 Sincerely, original signed by Thomas J. Kenyon, Project Manager Standardization and Non-Power 8705060173 DR 870430 Peactor Project Directorate p ADOCK 05000601 Division of Reactor Projects III, IV, PDR V and Special Projects

Enclosure:

Office of Nuclear Reactor Regulation As stated cc: See next page i DISTRIBUTION: V)O pocket File Trenyon HBerkow NRC PDR BHardin PDSNP Reading LocalPdR EHylton PDS f PRAB PDSN L PDs 9 TK h:cw BHardin Elfy on HBe ow 04 /87 04/bO /87 04/j0/87 04/D/87

,* nen e' og UNITED STATES

, [ 3e i NUCLEAR REGULATORY COMMISSION 5 g WASHINGTON, D. C. 20555

'. k,, N ,o/ April 30, 1987 Docket No. 50-601 Mr. W. J. Johnson, Manager Nuclear Safety Department Westinghouse Electric Corporation Water Reactor Division Box 355 Pittsburgh, Pennsylvania 15230

Dear Mr. Johnson:

SUBJECT:

DRAFT REPORTS REGARDING PROBABILISTIC SAFETY STUDY FOR THE RESAR SP/90 As part of our ongoing review of your application for a Preliminary Design Approval (PDA) for the RESAR SP/90 Advanced PWR, we contracted with Brookhaven National Laboratory (BNL) to assist us in our review of Module 16 "Probabilistic Safety Study." For your information, attached are two draft reports from BNL, entitled: "A Review of the WAPWR Probabilistic Safety Study,"

and " Assessment of Core Melt Progression and Fission Product Releases for the WAPWR Design."

We request that you review these reports, and provide us with your comments within 60 days of the date of receipt of this letter. Note that these are draft reports and have undergone only preliminary review by the NRC staff.

Review of this matter is still underway, and the conclusions reached in these reports are subject to change.

The material contained in these enclosures is considered to be proprietary and, therefore, is being withheld from public disclosure per 10 CFR 2.740. If you have any questions concerning this matter, please contact me at(301)492-7064.

Sincerely, e

Thomas J. K n,ProjectManager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects !!!, IV, cl Y and Special Projects Office of Nuclear Reactor Regulation cc: See next page L

+

s ..

p Dr. Robert Bari Prookhaven National Laboratory Building 130 Upton, New York 11973 Mr. William Schivley Westinghouse Electric Corporation ECE-410 Mail Step 4-08 Box 355 Pittsburgh, Pennsylvania 15230 0