|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20203F7221999-02-12012 February 1999 Notification of 990224 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss Ongoing & Future Licensing Plans & Interactions Between ABB-CE & NRC ML20203F5261999-02-12012 February 1999 Notification of 990224 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss Proposed Improvements to Design of ABB-CE PWR Fuel.Draft Agenda Attached ML20203F5311999-02-11011 February 1999 Notification of 990225 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss ABB-CE Crossflow Ultrasonic Flow Measurement Device ML20236Q6001998-06-25025 June 1998 Forwards ABB-CE Sys 80+ Std Design Fda Pursuant to 10CFR52, App O & Notice of Issuance of Fda Pursuant to 10CFR52,App O, Sys 80+ Std Design ABB-CE,Inc ML20137J9491997-04-0101 April 1997 Notification of 970402 Meeting W/Abb Combustion Engineering in Rockville,Md to Discuss Seismic Design Site Parameters for Sys 80+ Std Design ML20134D7641997-01-28028 January 1997 Notification of Cancellation of 970206 Meeting w/ABB-CE in Rockville,Md to Discuss ABB-CE Response to NRC 961001 RAI on Small Break LOCA Evaluation Model Topical Rept (CENPD-137) ML20135F5891996-12-0404 December 1996 Forwards Summary of 961114 Meeting W/Ceog in Rockville,Md to Discuss Topics of Mutual Interest ML20129F6551996-10-24024 October 1996 Notification of 961030 Meeting w/ABB-Combustion Engineering in Rockville,Md to Discuss ABB-CE Response to 961001 Request for Addl Info on Small LOCA Evaluation Model Topical Rept. Proposed Agenda Encl ML20129C3241996-10-21021 October 1996 Forwards Response to NEI Proposals Re Three Design Certification Issues NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20149E5131994-05-31031 May 1994 Informs That NRC in Process of Completing FSERs for Both GE Advanced BWR & ABB-CE Sys 80+ Designs.Safety Conclusions Will Need to Be Reassessed by Both NRC & Design Certification Applicants on Listed Issues ML20059K8821994-01-28028 January 1994 Notification of 940131 Meeting w/ABB-CE in Rockville,Md to Discuss Boron Dilution During small-break loss-of-coolant Accidents ML20059K8051994-01-28028 January 1994 Notification of 940131 & 940201 Meetings w/ABB-CE in Rockville,Md to Review & Resolve Remaining Structural/ Geotechnical Design Issues of Nonnuclear Island Analysis & Design Calculations.Agenda Encl ML20059L3181994-01-27027 January 1994 Notification of 940131 Meeting w/ABB-CE in Rockville,Md to Discuss Key PRA Insights & Assumptions for Sys 80+ Standard Plant Design ML20059K1771994-01-26026 January 1994 Notification of 940201 Meeting W/Senior Mgt in Rockville,Md to Discuss Status of Certification Review of ABB-CE Sys 80+ Design ML20059J7861994-01-25025 January 1994 Notification of 940126 Meeting w/ABB-CE in Rockville,Md to Discuss Source Term & Ph Control for in-containment Refueling Water Storage ML20059J1291994-01-25025 January 1994 Notification of 940126 Meeting W/Util in Rockville,Md to Discuss Remaining Technical Issues Re Sys 80+ Std Design ML20058P4371993-12-20020 December 1993 Notification of 931221 Meeting w/ABB-CE in Rockville,Md to Discuss New Source Term & Application for Environ Qualification of Plant Equipment ML20058K5771993-12-13013 December 1993 Notification of 931214-16 Meeting w/ABB-CE in Windsor,Ct to Discuss Bases for TS Section 3.3, Instrumentation for Sys 80+ ML20058H2171993-12-0707 December 1993 Notification of 931209 Meeting w/ABB-CE in Rockville,Md to Discuss Remaining Severe Accident Issues for System 80+ ML20058G9931993-12-0101 December 1993 Notification of 931214 Meeting W/Us Dept of Energy in Rockville,Md to Discuss Status of Advanced Reactor Reviews. Agenda Encl ML20058G5621993-11-30030 November 1993 Notification of 931201 Meeting w/ABB-CE in Rockville,Md to Discuss Sys 80+ Final Rept on Potential for Containment Bypass During SG Tube Rupture Event ML20058A6451993-11-18018 November 1993 Notifies of 931122 Meeting W/Abb C-E in Rockville,Md Re Status of Certification Review of Sys 80+ ML20062J8461993-11-15015 November 1993 Notification of 911117 Meeting w/ABB-CE in Rockville,Md to Discuss NRC & Contractor Comments on TS for Instrumentation Proposed for Sys 80+ in Section 16.6 of CESSAR-DC ML20059K2781993-11-0909 November 1993 Notification of 931110 Meeting w/ABB-CE in Rockville,Md to Review Status of Structural/Geotechnical Design Issues for Sys 80+.Tentative Agenda Encl ML20058A2181993-11-0909 November 1993 Notification of 931129 Meeting W/Licensee in Rockville,Md to Discuss Credit for Boron in SFP ML20059B4851993-10-26026 October 1993 Notification of 931027 Meeting w/ABB-CE in Rockville,Md to Discuss Sys 80+ Fuel Design Under Tier 1,Tier 2 & Tier 2* Provisions ML20059B5001993-10-25025 October 1993 Notification of 931028 Meeting w/ABB-CE in Rockville,Md to Discuss Status of Certification Review of Sys 80+ ML20057F2611993-10-12012 October 1993 Notification of 931028 & 29 Meetings w/ABB-CE in Charlotte, Nc to Discuss Sys 80+ Nuclear Island Design Audit ML20057E1501993-10-0505 October 1993 Notification of 931021 Meeting w/C-E in Windsor,Ct to Discuss Comments of NRC Staff & Contractor on Software Program Manual for Sys 80+ ML20057E1441993-10-0505 October 1993 Notification of 931022 Meeting w/C-E in Windsor,Ct to Discuss NRC & Contractors Comments on TS for Instrumentation Proposed for Sys 80+ in Section 16.6 of CESSAR-DC ML20058N1441993-10-0505 October 1993 Notification of 931012 & 13 Meetings w/C-E in Boston,Ma to Audit Sys 80+ Non-nuclear Island Category I Structures Analysis & Design ML20057E0191993-09-30030 September 1993 Discusses CE Request for Exemption from Compliance W/Nrc Metrication Policy Re ABWR Design Certification, Specifically Exemption from Performing Conversion to SI or Providing Dual Units in Design Certification Rule Documents ML20057D7301993-09-28028 September 1993 Notification of 931006-07 Meeting w/ABB-CE in Windsor,Ct to Review Status of Steel Containment Vessel Buckling Analysis for ABB-CE Sys 80+ ML20057D0831993-09-24024 September 1993 Notification of 930924 Meeting w/ABB-CE in Windsor,Ct to Discuss Staff Comments on Tier 1 Design Certification Material for CE Sys 80+ Design ML20057C5401993-09-23023 September 1993 Notification of 931004 Meeting w/ABB-CE in Windsor,Ct to Discuss Closure of Issues of Final SER on CE Sys 80+ PRA ML20057B1121993-09-14014 September 1993 Notification of 930916 Meeting w/ABB-CE in Rockville,Md to Discuss ABB-CE Evaluation of Potential Design Alternatives to Cope W/Containment Bypass Event During SG Tube Rupture ML20056G0501993-08-25025 August 1993 Notification of 930902 Meeting W/Abb C-E in Windsor,Ct to Discuss Progress on Issue Closure for Pra.Proposed Agenda Encl ML20056G6341993-08-18018 August 1993 Forwards Info Transmitted & Received for ABB-CE System 80+ Std Plant Design Certification ML20056E0961993-08-17017 August 1993 Notification of 930818 Meeting w/C-E in Rockville,Md to Review Status of Safeguards Review for Sys 80+.Proposed Meeting Agenda Encl ML20057D1151993-08-16016 August 1993 Notification of 931005 Meeting w/DOE,ABB-CE & GE in Rockville,Md to Discuss Design Certification Reviews. Meeting Cancelled ML20056E0921993-08-16016 August 1993 Notification of 931005 Mgt Meeting W/Doe in Rockville,Md to Discuss Status of Design Certification Reviews ML20056E5291993-08-0505 August 1993 Submits Daily Highlight Re 930812 Meeting w/ABB-CE in Rockville,Md to Review Staff Comments Re ABB-CE Nuplex 80+ Stds ML20056E4001993-07-29029 July 1993 Submits Daily Highlights Re Rescheduled 930809 Meeting to 930816 in Rockville,Md to Discuss ABB-CE Evaluation of Potential Design Alternatives to Cope W/Containment Bypass Event During SGTR ML20056D7131993-07-27027 July 1993 Notification of 930728 Meeting w/ABB-CE in Rockville,Md to Discuss & Review Calculations for Resistance to Sliding & Overturning of Steel Containment & Internals Under Seismic Event Conditions ML20128N6751993-02-19019 February 1993 Notification of 930222 Meeting w/ABB-CE in Rockville,Md to Discuss CE Sys 80+ Design to Resolve Interfacing Sys LOCA Issue 1999-02-12
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20203F5261999-02-12012 February 1999 Notification of 990224 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss Proposed Improvements to Design of ABB-CE PWR Fuel.Draft Agenda Attached ML20203F7221999-02-12012 February 1999 Notification of 990224 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss Ongoing & Future Licensing Plans & Interactions Between ABB-CE & NRC ML20203F5311999-02-11011 February 1999 Notification of 990225 Meeting with ABB-Combustion Engineering in Rockville,Md to Discuss ABB-CE Crossflow Ultrasonic Flow Measurement Device ML20236Q6001998-06-25025 June 1998 Forwards ABB-CE Sys 80+ Std Design Fda Pursuant to 10CFR52, App O & Notice of Issuance of Fda Pursuant to 10CFR52,App O, Sys 80+ Std Design ABB-CE,Inc ML20137J9491997-04-0101 April 1997 Notification of 970402 Meeting W/Abb Combustion Engineering in Rockville,Md to Discuss Seismic Design Site Parameters for Sys 80+ Std Design ML20134D7641997-01-28028 January 1997 Notification of Cancellation of 970206 Meeting w/ABB-CE in Rockville,Md to Discuss ABB-CE Response to NRC 961001 RAI on Small Break LOCA Evaluation Model Topical Rept (CENPD-137) ML20135F5891996-12-0404 December 1996 Forwards Summary of 961114 Meeting W/Ceog in Rockville,Md to Discuss Topics of Mutual Interest ML20129F6551996-10-24024 October 1996 Notification of 961030 Meeting w/ABB-Combustion Engineering in Rockville,Md to Discuss ABB-CE Response to 961001 Request for Addl Info on Small LOCA Evaluation Model Topical Rept. Proposed Agenda Encl ML20129C3241996-10-21021 October 1996 Forwards Response to NEI Proposals Re Three Design Certification Issues NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20149E5131994-05-31031 May 1994 Informs That NRC in Process of Completing FSERs for Both GE Advanced BWR & ABB-CE Sys 80+ Designs.Safety Conclusions Will Need to Be Reassessed by Both NRC & Design Certification Applicants on Listed Issues ML20059K8821994-01-28028 January 1994 Notification of 940131 Meeting w/ABB-CE in Rockville,Md to Discuss Boron Dilution During small-break loss-of-coolant Accidents ML20059K8051994-01-28028 January 1994 Notification of 940131 & 940201 Meetings w/ABB-CE in Rockville,Md to Review & Resolve Remaining Structural/ Geotechnical Design Issues of Nonnuclear Island Analysis & Design Calculations.Agenda Encl ML20059L3181994-01-27027 January 1994 Notification of 940131 Meeting w/ABB-CE in Rockville,Md to Discuss Key PRA Insights & Assumptions for Sys 80+ Standard Plant Design ML20059K1771994-01-26026 January 1994 Notification of 940201 Meeting W/Senior Mgt in Rockville,Md to Discuss Status of Certification Review of ABB-CE Sys 80+ Design ML20059J1291994-01-25025 January 1994 Notification of 940126 Meeting W/Util in Rockville,Md to Discuss Remaining Technical Issues Re Sys 80+ Std Design ML20059J7861994-01-25025 January 1994 Notification of 940126 Meeting w/ABB-CE in Rockville,Md to Discuss Source Term & Ph Control for in-containment Refueling Water Storage ML20058P4371993-12-20020 December 1993 Notification of 931221 Meeting w/ABB-CE in Rockville,Md to Discuss New Source Term & Application for Environ Qualification of Plant Equipment ML20058K5771993-12-13013 December 1993 Notification of 931214-16 Meeting w/ABB-CE in Windsor,Ct to Discuss Bases for TS Section 3.3, Instrumentation for Sys 80+ ML20058H2171993-12-0707 December 1993 Notification of 931209 Meeting w/ABB-CE in Rockville,Md to Discuss Remaining Severe Accident Issues for System 80+ ML20058G9931993-12-0101 December 1993 Notification of 931214 Meeting W/Us Dept of Energy in Rockville,Md to Discuss Status of Advanced Reactor Reviews. Agenda Encl ML20058G5621993-11-30030 November 1993 Notification of 931201 Meeting w/ABB-CE in Rockville,Md to Discuss Sys 80+ Final Rept on Potential for Containment Bypass During SG Tube Rupture Event ML20058A6451993-11-18018 November 1993 Notifies of 931122 Meeting W/Abb C-E in Rockville,Md Re Status of Certification Review of Sys 80+ ML20062J8461993-11-15015 November 1993 Notification of 911117 Meeting w/ABB-CE in Rockville,Md to Discuss NRC & Contractor Comments on TS for Instrumentation Proposed for Sys 80+ in Section 16.6 of CESSAR-DC ML20059K2781993-11-0909 November 1993 Notification of 931110 Meeting w/ABB-CE in Rockville,Md to Review Status of Structural/Geotechnical Design Issues for Sys 80+.Tentative Agenda Encl ML20058A2181993-11-0909 November 1993 Notification of 931129 Meeting W/Licensee in Rockville,Md to Discuss Credit for Boron in SFP ML20059B4851993-10-26026 October 1993 Notification of 931027 Meeting w/ABB-CE in Rockville,Md to Discuss Sys 80+ Fuel Design Under Tier 1,Tier 2 & Tier 2* Provisions ML20059B5001993-10-25025 October 1993 Notification of 931028 Meeting w/ABB-CE in Rockville,Md to Discuss Status of Certification Review of Sys 80+ ML20057F2611993-10-12012 October 1993 Notification of 931028 & 29 Meetings w/ABB-CE in Charlotte, Nc to Discuss Sys 80+ Nuclear Island Design Audit ML20057E1441993-10-0505 October 1993 Notification of 931022 Meeting w/C-E in Windsor,Ct to Discuss NRC & Contractors Comments on TS for Instrumentation Proposed for Sys 80+ in Section 16.6 of CESSAR-DC ML20057E1501993-10-0505 October 1993 Notification of 931021 Meeting w/C-E in Windsor,Ct to Discuss Comments of NRC Staff & Contractor on Software Program Manual for Sys 80+ ML20058N1441993-10-0505 October 1993 Notification of 931012 & 13 Meetings w/C-E in Boston,Ma to Audit Sys 80+ Non-nuclear Island Category I Structures Analysis & Design ML20057E0191993-09-30030 September 1993 Discusses CE Request for Exemption from Compliance W/Nrc Metrication Policy Re ABWR Design Certification, Specifically Exemption from Performing Conversion to SI or Providing Dual Units in Design Certification Rule Documents ML20057D7301993-09-28028 September 1993 Notification of 931006-07 Meeting w/ABB-CE in Windsor,Ct to Review Status of Steel Containment Vessel Buckling Analysis for ABB-CE Sys 80+ ML20057D0831993-09-24024 September 1993 Notification of 930924 Meeting w/ABB-CE in Windsor,Ct to Discuss Staff Comments on Tier 1 Design Certification Material for CE Sys 80+ Design ML20057C5401993-09-23023 September 1993 Notification of 931004 Meeting w/ABB-CE in Windsor,Ct to Discuss Closure of Issues of Final SER on CE Sys 80+ PRA ML20057D1801993-09-14014 September 1993 Staff Requirements Memo Suggesting NRC Continue Discussions W/Acrs on Generic RM & Monitor Progress of Reviews of Passive Designs ML20057B1121993-09-14014 September 1993 Notification of 930916 Meeting w/ABB-CE in Rockville,Md to Discuss ABB-CE Evaluation of Potential Design Alternatives to Cope W/Containment Bypass Event During SG Tube Rupture ML20056G0501993-08-25025 August 1993 Notification of 930902 Meeting W/Abb C-E in Windsor,Ct to Discuss Progress on Issue Closure for Pra.Proposed Agenda Encl ML20056G6341993-08-18018 August 1993 Forwards Info Transmitted & Received for ABB-CE System 80+ Std Plant Design Certification ML20056E0961993-08-17017 August 1993 Notification of 930818 Meeting w/C-E in Rockville,Md to Review Status of Safeguards Review for Sys 80+.Proposed Meeting Agenda Encl ML20057D1151993-08-16016 August 1993 Notification of 931005 Meeting w/DOE,ABB-CE & GE in Rockville,Md to Discuss Design Certification Reviews. Meeting Cancelled ML20056E0921993-08-16016 August 1993 Notification of 931005 Mgt Meeting W/Doe in Rockville,Md to Discuss Status of Design Certification Reviews ML20056E5291993-08-0505 August 1993 Submits Daily Highlight Re 930812 Meeting w/ABB-CE in Rockville,Md to Review Staff Comments Re ABB-CE Nuplex 80+ Stds ML20056E4001993-07-29029 July 1993 Submits Daily Highlights Re Rescheduled 930809 Meeting to 930816 in Rockville,Md to Discuss ABB-CE Evaluation of Potential Design Alternatives to Cope W/Containment Bypass Event During SGTR ML20056D7131993-07-27027 July 1993 Notification of 930728 Meeting w/ABB-CE in Rockville,Md to Discuss & Review Calculations for Resistance to Sliding & Overturning of Steel Containment & Internals Under Seismic Event Conditions 1999-02-12
[Table view] |
Text
.
o
. lLMe8 FF PDST R/F
- "*%, JWiIson y t UNITED STATES PUBLIC
!* j 2
NUCLEAR REGULATORY COMMlSSION WASHINGTON, D.C. 20s854001 i i
% * * * * * ,o June 25 1998, a.~
- - 1 2
- 02 gt; [XE.I i Ji l I~
MEMORANDUM TO: Rules Review and Directives Branch Division of Freedom of Information and Publications Services Office of Administration
~FROM: Office of Nuclear Reactor Regulation
SUBJECT:
One signed original of the FederalRegister Notice identified below is attached for your transmittal 1 to the Office of the Federal Register for publication. Additional conformed copies ( I ) of the Notice are enclosed for your use.
Notice of Receipt of Application for Construction Permit (s) and Operating Ucense(s).
Notice of Receipt of Partial Application for Construction Permit (s) and Facility Ucense(s):
Time for submission of Views on Antitrust matters.
Notice of Consideration of lasuance of Amendment to Facility Operating Ucense. (Call with 30-day insert date).
Notice of Receipt of Application for Facility Ucense(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of issuance of Facility Ucense(s) and Notice of Opportunity for Hearing.
Notice of Availability of NRC Draft / Final Environmental Statement.
Notice of Umited Work Authorization.
Notice of Availability of Safety Evaluation Raport.
1 Notice of Issuance of Construction Permit (s).
C Notice of issuance of Facility Operating Ucense(s) or Amendment (s).
Order.
Exemption.
Notice of Granting Exemption. I Environmental Assessment.
C Notice of Preparation of Environmental Assessment.
.Beceipt of Petition for Director's Decisica Under 10 CFR 2.206.
{C Issuance of Final Director's Decision Under 10 CFR 2.206.
1 Other: ABB-CE System 80+ Standard Destan Final Desion Anoroval (FDA) Pursuant to 20 CFR Part 52. Appendix 0. Notice of Issuance of FDA Pursuant to 10 CFR Part $2 Appendix 0 System 80+ Standard Design ABS-CE, Inc.
. DOCKET NO.52-002 Attachment (s): As stated
Contact:
Jerry M . Wilson, NRR Telephone: 415-3145 l m .
- .4 9
JWDs "
9807200359 900625 FDR ADOCK 05200002
% O (PD _.
,o f
DOCKET NO.52-002 ABB-COMBUSTION ENGINEERING. INC. (ABB-CE)
SYSTEM 80+ STANDARD DESIGN FINAL DESIGN APPROVAL (FDA)
PURSUANT TO 10 CFR PART 52. APPENDIX O (1) ABB-CE has submitted to the Nuclear Regulatory Commission (NRC) staff, for its review, a standardized design for a major portion of a nuclear power facility of the type described in 10 CFR 50.22. ABB-CE's System 80+ standard plant design is described in the Combus-tion Engineering Standard Safety Analysis Report - Design Certification (CESSAR-DC),
including Amendments A through X thereto.
(2) The CESSAR-DC contains design information required by 10 CFR Part 52, Appendix O, Paragraph 3, for a standard design. The System 80+ standard design, whose scope is defined in CESSAR-DC Section 1.1.1, is for a nuclear power facility with a rated reactor core power level of 3914 megawatts thermal.
(3) The NRC staff and the Advisory Committee on Reactor Safeguards (ACRS) have reviewed the System 80+ standard design. The findings of the staff's evaluation of the Syr, tem 80+
standard design are presented in the Final Safety Evaluation Report (FSER), dated August 1994 (NUREG-1462) and Supplement No.1 to NUREG-1462, dated May 1997.
The ACRS reported on the application for design certification in a letter dated May 11, 1994, as required by 10 CFR 52.53.
(4) On the basis of its review and the findings reported in the FSER and the supplement thereto, the staff concludes that the information in the CESSAR-DC, with respect to the System 80+ standard design as described in paragraph 2 above, complies with the requirements of 10 CFR Part 52, Appendix 0.
(5) The System 80+ standard design is acceptable for use as a reference design for construc-tion permit and operating license applications and combined license applications for -
facilities that are located at sites whose characteristics are within the envelope of site parameters given in CESSAR-DC, and the out-of-scope portions of the plant that interface with the approved design conform to the interface requirements given in CESSAR DC.
~
(6) _ This FDA and all applications for operating licenses incorporating it by reference, are
' subject to all applicable provisions of the Atomic Energy Act, as amended, and the rules, regulations, and orders of the Commission now or hereafter in effect.
l Enclosure 1 936S6eso 2p/2
1 1
o 2-l (7) This FDA does not constitute a commitment to issue a permit, design certification, or !
license, or in any way affect the authority of the Commission, the Atomic Safety and i Licensing Board, and other presiding officers, in any proceeding pursuant to 10 CFR j Part 2. j i
(8) This FDA is effective on the date of issuance and will expire on June 20,2012, unless extended by the staff, and supersedes previous FDAs for the System 80+ standard design.
The expiration of this FDA shall not affect its use in applications docketed before such date.
8 Dated in Rockville, Maryland, thi day of 70Mt.1998.
I FOR THE NUCLF.AR REGULATORY COMMISSION
( ector Office of Nuclear Reactor Regulation i
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ l
a s e UNITED S TATES NUCLEAR REGULATORY COMMISSION NOTICE OF ISSUANCE OF FINAL DESIGN APPROVAL PURSUANT TO 10 CFR PART 52, APPENDIX O SYSTEM 80+ STANDARD DESIGN ABB-COMBUSTION ENGINEERING, INC.
DOCKET NO.52-002 The U.S. Nuclear Regulatory Commission (NRC) has issued a revised final design approval (FDA) to ABB-Combustion Engineering, Inc. (ABB-CE) pursuant to 10 CFR Part 52, l
Appendix 0. This FDA allows the System 80+ standard design to be referenced in an application for a construction pemlit or operating license pursuant to 10 CFR Part 50, or in an application for a combined license pursuant to 10 CFR Part 52. The FDA is being revised to make it cotermi-l nous with the design certification rule that was issued on May 21,1997. This FDA supersedes the FDAs dated July 26 and November 23,1994.
A copy of the revised FDA has been placed in the NRC's Public Docket Room, the Gelman l Building,2120 L Street, NW., Washington, D.C. 20037, for review by interested persons.
Dated at Rockville, Maryland, this2 y of'7WE 1998.
FOR THE NUCLEAR REGULATORY COMMISSION
% * -2~>
Theodore R. Quay, Director Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation I
Enclosure 2 150t%rw39 Ip.