Letter Sequence RAI |
---|
|
|
MONTHYEARCNL-20-053, Application to Revise Watts Bar Nuclear Plant, Unit 1, Technical Specifications for Steam Generator Tube Inspection Frequency & to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection, (WBN-392020-07-17017 July 2020 Application to Revise Watts Bar Nuclear Plant, Unit 1, Technical Specifications for Steam Generator Tube Inspection Frequency & to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection, (WBN-390- Project stage: Request CNL-20-040, License Amendment Request to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec (WBN-TS-20-07)2020-07-17017 July 2020 License Amendment Request to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec (WBN-TS-20-07) Project stage: Request CNL-20-078, Supplement to Application to Revise Watts Bar Nuclear Plant (Wbn), Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency and to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sa2020-10-13013 October 2020 Supplement to Application to Revise Watts Bar Nuclear Plant (Wbn), Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency and to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Samp Project stage: Supplement ML20323A3142020-10-29029 October 2020 Amendment 3 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Table of Contents to Sec 3.7 Project stage: Request ML21039A6402021-02-0808 February 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar Nuclear Plant, Unit 1 Technical Specifications Related to Steam Generator Tube Inspection Frequency Project stage: RAI CNL-21-021, Response to Request for Additional Information Regarding Application to Revise Watts Bar Nuclear Plant (Wbn), Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency and to Adopt TSTF-510, .2021-03-30030 March 2021 Response to Request for Additional Information Regarding Application to Revise Watts Bar Nuclear Plant (Wbn), Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency and to Adopt TSTF-510, . Project stage: Response to RAI ML21102A1312021-04-19019 April 2021 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Unit 1 Project stage: Withholding Request Acceptance ML21153A0492021-07-26026 July 2021 Issuance of Amendment No. 147 Regarding Change to Steam Generator Tube Inspection Frequency and Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-510 Project stage: Approval 2021-02-08
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24304A3752024-10-29029 October 2024 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Watts Bar Updated Final Safety Analysis Report (UFSAR) for Hydrologic Analysis ML24274A2762024-09-24024 September 2024 Email from K.Green to S.Hughes, Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, Hydrologic LAR to Revise the UFSAR ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24215A3152024-07-24024 July 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-276-A, Revision 2 TS 3.8.1, AC Sources ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24157A3152024-06-0303 June 2024 2024 Sequoyah Commercial Grade Dedication Inspection Information Request ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24156A0062024-05-22022 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Recapture Low-Power Testing Time ML24130A0132024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.11 for MCR Chiller Completion Time ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24082A0662024-04-17017 April 2024 Email to Stuart Rymer on Exemption Decision for Watts Bar ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24082A0682024-04-10010 April 2024 Email to Stuart Rymer Re_ Availability of EA-FONSI for Watts Bar ML24100A8392024-04-0909 April 2024 Response from State of Tn Regarding Review of Environmental Assessment for Watts Bar Exemption Request ML24100A8402024-04-0808 April 2024 Email to State of Tn Requesting Review of Environmental Assessment for Watts Bar Exemption Request ML24071A0982024-03-0707 March 2024 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate ML24058A0962024-02-26026 February 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant License Amendment Request to Revise UFSAR for Hydrologic Analysis ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24033A0562024-02-0101 February 2024 NRR E-mail Capture - Correction Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-427-A, Revision 2 Regarding Degraded Barriers ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation ML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22356A2982022-12-22022 December 2022 Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report ML22353A0812022-12-15015 December 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 2024-09-24
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24304A3752024-10-29029 October 2024 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Watts Bar Updated Final Safety Analysis Report (UFSAR) for Hydrologic Analysis ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23030A3512023-01-25025 January 2023 Notification of Watts Bar Nuclear Plant - Design Bases Assurance Inspection (Programs) and Initial Information Request ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to TVAs Request to Revised the TVA Plants Radiological Emergency Plans ML22115A1402022-04-25025 April 2022 NRR E-mail Capture - Requests for Confirmation of Information and Additional Information Regarding Watts Bar Nuclear Plant, Unit 2 Exemption Request Re 10 CFR Part 26 (L-2022-LLE-0017) ML22083A2372022-03-24024 March 2022 NRR E-mail Capture - Request for Additional Information and Confirmation of Information Related to TVAs Request for Changes to Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification 3.7.8 ML22056A3802022-02-25025 February 2022 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-02 ML21267A1392021-09-23023 September 2021 Document Request for Upcoming RP Inspection at Watts Bar ML21221A2602021-08-0909 August 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Watts Bar, Unit 1 Tech Specs Related to Continuous Opening of the Auxiliary Building Secondary Containment Enclosure Boundary ML21102A1312021-04-19019 April 2021 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Unit 1 ML21095A0422021-04-0202 April 2021 NRR E-mail Capture - Added Clarification to RAI 2 for Thot LAR ML21095A0402021-04-0202 April 2021 NRR E-mail Capture - Request for Additional Information Re Generic Letter 95-05 90-Day Report and LAR to Adjust Growth Rate for Thot (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21091A0772021-04-0101 April 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21095A0412021-04-0101 April 2021 NRR E-mail Capture - Revised Draft RAI - Combined RAI Set for Watts Bar Unit 2 90-Day Report and Thot LAR (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21095A0442021-04-0101 April 2021 NRR E-mail Capture - Revised Draft RAI - Combined RAI Set for Watts Bar Unit 2 90-Day Report and Thot LAR (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21095A0462021-03-22022 March 2021 NRR E-mail Capture - Draft Request for Additional Information Regarding Tva'S Generic Letter 95-05 90-Day Report for Watts Bar Unit 2 ML21039A6402021-02-0808 February 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar Nuclear Plant, Unit 1 Technical Specifications Related to Steam Generator Tube Inspection Frequency ML21012A2032021-01-11011 January 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar UFSAR to Use Alternate Probability of Detection ML20350B5592020-12-15015 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Adopt Traveler TSTF-490 Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML20338A3202020-12-0303 December 2020 Notification of an NRC Fire Protection Team Inspection (NRC Inspection Report 05000390/2021011 and 05000391/2021011) and Request for Information ML20322A4412020-11-17017 November 2020 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise TS 3.7.11 Related to the MCR Chiller Replacement ML20322A4392020-11-0505 November 2020 NRR E-mail Capture - Draft Request for Additional Information Regarding Tva'S Request to Revise TS 3.7.11 Related to the MCR Chiller Replacement ML20308A3512020-11-0202 November 2020 Request for Additional Information on WBN Request for Exemption from 10 CFR Part 73, Appendix B, Section VI for the Conduct of an Annual Force-on-Force Exercise (EPID L-2020-LLE-0165 (COVID-19)) ML20253A1782020-09-0909 September 2020 Emergency Preparedness Program Inspection Request for Information ML20266G4592020-08-14014 August 2020 Notification of Inspection and Request for Information ML20196L8622020-07-14014 July 2020 NRR E-mail Capture - Watts Bar Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Request to Implement the Full Spectrum LOCA Methodology ML20086G4802020-03-26026 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) - Part 2 ML20085G3572020-03-25025 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML20084M1942020-03-24024 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML20083J3952020-03-12012 March 2020 NRR E-mail Capture - Draft Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML19340A6842019-12-0505 December 2019 NRR E-mail Capture - Request for Additional Information for WBN2 Request for One-Time Extension of Completion Time for TS 3.7.8 (L-2019-LLA-0020) ML19218A0302019-08-0505 August 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Second-Round Request for Additional Information Related to Application to Revise Technical Specifications Regarding DC Electrical Systems, TSTF-500, Revision 2 ML19218A0282019-07-25025 July 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Draft Second-Round Request for Additional Information Related to Application to Revise Technical Specifications Regarding DC Electrical Systems, TSTF-500, Revision 2 ML19186A4352019-07-0505 July 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Correction to Final Request for Additional Information Related to Application to Adopt 10 CFR 50.69 ML19169A3592019-06-18018 June 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Final Request for Additional Information Related to Application to Adopt 10 CFR 50.69 ML19148A7912019-05-28028 May 2019 NRR E-mail Capture - Sequoyah Nuclear Plant and Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request for Alternative to OM Code Requirements ML19106A0462019-04-15015 April 2019 NRR E-mail Capture - Watts BAR, Units 1 and 2 Request for Additional Informatin (RAI) Regarding Changes to Technical Specifications Sections 3.8.1, 3.8.7, 3.8.8, and 3.8.9 ML19071A3542019-03-0808 March 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request to Adopt TSTF-425 to Relocate Specific Surveillance Frequency Requirements to Licensee-Controlled Program ML18313A2202018-11-0707 November 2018 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML18282A6372018-10-0909 October 2018 NRR E-mail Capture - RAIs (Final) - LAR to Revise the Steam Generator Technical Specifications for Watts Bar Nuclear Plant, Unit 2 ML18270A2362018-09-26026 September 2018 NRR E-mail Capture - Watts Bar Units 1 and 2 RAIs - Modify TS 3.8.9 Completion Time for Inoperable 120V AC Vital Buses (L-2018-LLA-0050) 2024-09-10
[Table view] |
Text
From: Green, Kimberly Sent: Monday, February 8, 2021 6:49 AM To: Wells, Russell Douglas Cc: Shoop, Undine
Subject:
Request for Additional Information Regarding TVA's Request to Revise the Watts Bar Nuclear Plant, Unit 1 Technical Specifications Related to Steam Generator Tube Inspection Frequency (EPID L-2020-LLA-0161)
Attachments: Final RAI.pdf
Dear Mr. Wells,
By letter dated July 17, 2020 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML20199M346), as supplemented by letter dated October 13, 2020 (ADAMS Accession No. ML20287A569), Tennessee Valley Authority (TVA) requested changes to the Technical Specifications (TS) for Watts Bar Nuclear Plant, Unit 1. The proposed changes would revise the steam generator tube inspection frequency requirements in TS 5.7.2.12, Steam Generator (SG) Program, and TS 5.9.9, Steam Generator Tube Inspection Report. The proposed changes also include the adoption of Technical Specifications Task Force Technical Change Traveler 510, Revision 2.
The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has identified areas where additional information is needed to complete its review.
A draft request for additional information (RAI) was previously transmitted to you by email dated January 22, 2021. At your request, a clarification call was held on February 1, 2021, to clarify the NRC staffs requests. Based on the discussion during that call, the NRC revised request 5.a to separate the request into three separate requests (i.e., 5.a, 5.b, and 5.c) for clarity. Accordingly, request 5 now has five subparts (a through e). Minor editorial changes were made to requests 5.b and 5.c; however, no changes were made to the scope of the requests. The other requests remain the same.
As agreed during the call, a response to the attached RAI is requested by March 19, 2021.
The NRC staff considers that timely responses to RAIs help ensure sufficient time is available for staff review and contribute toward the NRCs goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1627 or via email at Kimberly.Green@nrc.gov.
Sincerely, Kimberly J. Green, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Hearing Identifier: NRR_DRMA Email Number: 1007 Mail Envelope Properties (MN2PR09MB57395A7E310A61D4C83D1A4A8F8F9)
Subject:
Request for Additional Information Regarding TVA's Request to Revise the Watts Bar Nuclear Plant, Unit 1 Technical Specifications Related to Steam Generator Tube Inspection Frequency (EPID L-2020-LLA-0161)
Sent Date: 2/8/2021 6:49:05 AM Received Date: 2/8/2021 6:49:05 AM From: Green, Kimberly Created By: Kimberly.Green@nrc.gov Recipients:
"Shoop, Undine" <Undine.Shoop@nrc.gov>
Tracking Status: None "Wells, Russell Douglas" <rdwells0@tva.gov>
Tracking Status: None Post Office: MN2PR09MB5739.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2098 2/8/2021 6:49:05 AM Final RAI.pdf 106623 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
REQUEST FOR ADDITIONAL INFORMATION TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-390 STEAM GENERATOR TUBE INSPECTION FREQUENCY CHANGES AND ADOPTION OF TECHNICAL CHANGE TRAVELER TSTF-510 INTRODUCTION By letter dated July 17, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20199M346), as supplemented by letter dated October 13, 2020 (ADAMS Accession No. ML20287A569), Tennessee Valley Authority (TVA, the licensee) requested changes to the Technical Specifications (TSs) for Watts Bar Nuclear Plant (Watts Bar), Unit 1. The proposed changes would revise the steam generator (SG) tube inspection frequency requirements in TS 5.7.2.12, Steam Generator (SG) Program, and TS 5.9.9, Steam Generator Tube Inspection Report. The proposed changes include the adoption of Technical Specifications Task Force (TSTF) Technical Change Traveler 510 (TSTF-510), Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection.
REGULATORY BASIS Section 50.36, Technical specifications," of Title 10 of the Code of Federal Regulations (10 CFR), establishes the regulatory requirements related to the content of the TSs. The TSs for all current pressurized-water reactor licenses require that an SG Program be established and implemented to ensure that SG tube integrity is maintained. Fundamental regulatory requirements with respect to the integrity of the SG tubing are established in 10 CFR Part 50.
Specifically, the general design criteria (GDC) in Appendix A to 10 CFR Part 50 establish minimum requirements for the principal design criteria for nuclear power plants and state that the reactor coolant pressure boundary shall have an extremely low probability of abnormal leakage, of rapidly propagating failure, and of gross rupture (GDC 14); shall be designed with sufficient margin (GDCs 15 and 31); shall be of the highest quality standards practical (GDC 30); and, shall be designed to permit (1) periodic inspection and testingto assess their structural and leak tight integrity (GDC 32). Section 3.1.2 of the Watts Bar UFSAR addresses conformance with the GDC in Appendix A to 10 CFR Part 50 (ADAMS Accession No. ML19176A129).
INFORMATION REQUESTED In order to complete its evaluation of whether the proposed TS changes meet the SG Program requirements described above, the U.S. Nuclear Regulatory Commission staff requests the following information.
- 1. Provide a correction or justification for the one instance of repair criteria in the proposed changes to 5.7.2.12.d.2. To conform to TSTF-510, as corrected by NRC letter
to the TSTF dated June 17, 2013 (ADAMS Accession No. ML13120A541), repair criteria in this instance should be replaced with plugging criteria.
- 2. On page 11 of Enclosure 1 to the LAR supplement, the third full paragraph in Section 3.1.2, Mechanical Wear at Horizontal [Advanced Tube Support Grid] ATSGs, contains a sentence about U-bend wear. This sentence appears to be in the wrong section of the report. Confirm the actual operating interval between inspections and the worst-case projected support structure wear indications.
- 3. In Enclosure 1 of the LAR, Section 3.2.7, Discussion of Growth Rates, OA Methods, Projections, and Results, contains a statement that, the observed behavior of ATSG wear growth rates are considered encompassing of that for tube wear occurring at U-bend supports. Clarify the meaning of this statement, considering that the paragraph that follows identifies higher wear growth rates at U-bend supports than at ATSG locations.
- 4. Attachment 7 to Enclosure 1 of the LAR supplement describes the process for comparing eddy current wear indications that were sized with the bobbin probe during different inspections. The comparison is complicated by the use of a different probe reference standard in the R14 inspection than in prior inspections. Please provide the following clarifications:
- a. Attachment 7 states that adjustment is necessary to compare U1R14 combination bobbin/array probe wear sizing to bobbin probe wear sizing in previous inspections, and that this adjustment is used to develop growth rates.
Describe the adjustment and explain how the adjustment was applied to the tables in Attachments 3 and 4 comparing wear depths from different inspections.
In addition, please clarify whether the wear values for U1R14 in Figure 3 (Enclosure 1) are adjusted in the way described in Attachment 7.
- b. Clarify the meaning of the statement in Attachment 7 that, Use of this sizing method is considered supplementary to the application of the condition monitoring limits associated with ETSS 96004.1. If this was the wear sizing method used in U1R14, and sizing is required to perform condition monitoring, explain why this method is considered supplementary.
- 5. Sections 4.1.4 and 4.2.4 of Enclosure 1 of the LAR supplement describe the use of a volume-based wear approach for assessing U-bend support wear and ATSG wear, respectively. The staff requests the following information about the volume-based wear approach.
- a. Clarify the description in Section 4.1.4 of how benchmarking was performed for the volumetric wear approach.
- b. Explain how the non-matched indications in Figure 4-1 were assigned values of predicted wear (i.e., x-axis values), the basis and meaning of the linear regression of the non-matched indications, and the significance of the upper bound line given that one value is above it.
- c. Discuss the statement in Section 4.1.4 that a slope less than unity indicates a conservative condition for application of the benchmarking parameters since it appears this is only true for data points below the red line with a slope of 1.
- d. Section 4.2.4 of Enclosure 1 of the LAR supplement states that volumetric wear evaluation for ATSG wear requires two of the flaws to be treated as tapered wear using rotating probe inspection data. The text refers to Figure A4-8 (labeled A4-16 in Attachment 4), which is an array probe terrain plot. Describe how the array probe terrain plots were used to provide the necessary flaw profile information.
- e. In the paragraph following Figure 4-1 in Section 4.1.4 of Enclosure 1 of the LAR, clarify the statement that the inputs to the volume-based wear model are measured wear depths from the U1R14 inspection and eddy current look-up depths for these flaws from the U1R8 and UR11 inspections. In addition, if U1R8 depths are used as inputs, explain why growth rates are based only on growth between U1R11 and U1R14.
- 6. During the review, the NRC staff identified the following apparent discrepancies.
Confirm the correct information.
- a. Several figures in Enclosure 1 of the LAR supplement appear to be mis-numbered as identified in the table below.
Table of Contents Text Figure Label Figure A3-1 Figure A3-1 Figure A3-5 Figure A3-2 Figure A3-2 Figure A3-6 Figure A3-3 Figure A3-3 Figure A3-7 Figure A3-4 Figure A3-4 Figure A3-8 Figure A4-1 Figure A4-1 Figure A4-9 Figure A4-2 Figure A4-2 Figure A4-10 Figure A4-3 Figure A4-3 Figure A4-11 Figure A4-4 Figure A4-4 Figure A4-12 Figure A4-5 Figure A4-5 Figure A4-13 Figure A4-6 Figure A4-6 Figure A4-14 Figure A4-7 Figure A4-7 Figure A4-15 Figure A4-8 Figure A4-8 Figure A4-16 Figure A5-1 Not used Figure A5-2 Figure A6-1 Figure A6-1 Figure A6-5 Figure A6-2 Figure A6-2 Figure A6-6 Figure A6-3 Figure A6-3 Figure A6-7 Figure A6-4 Figure A6-4 Figure A6-8 Not Used Not Used Figure A6-9 Figure A7-1 Figure A7-1 Figure A7-2
- b. The heading on Page E1-10 of 25 in the LAR identifies the U1R14 outage as occurring in Fall 2016 rather than Spring 2017.