Notice of Deviation from Insp on 870801-31.Deviation Noted: Licensee Made Changes to FSAR in Amend 5 Dtd 870722 Which Was Not Formally Evaluated & Documented for Review
ML20235T039
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/29/1987
From: Zech G
NRC OFFICE OF SPECIAL PROJECTS
To:
Shared Package
ML20235T033 List:
References
50-259-87-30, 50-260-87-30, 50-296-87-30, NUDOCS 8710090240
Download: ML20235T039 (2)


Text

__ _ - _ _ - - _-___

~

ENCLOSURE 1 NOTICE OF DEVIATION Tennessee Valley Authority Docket Nos. 50-259, 50-260, and 50-296 Browns Ferry 1, 2, and 3 ' License Nos. DPR-33, DPR-52 and DPR-68 During the Nuclear Regulatory Commission (NRC) inspection conducted on August 1-31, 1987, a deviation from your response to the findings in Inspection Report 50-259/86-05, 50-260/86-05, and 50-296/86-05 was identified. The deviation involved failure to perform and make available for review the formal justification for changes to the Final Safety Analysis Report (FSAR). The deviation is listed below:

The licensee informed the NRC in its letter to Dr. J. Nelson Grace, Regional Administrator for the NRC Region II, dated May 20, 1986, that future changes to the FSAR would be formally evaluated and justified before revising the FSAR and that the justifications would be available for review.

Contrary to the above, the licensee made changes to the FSAR in Amendment 5 dated July 22, 1987, which were not formally evaluated and documented for review. The following examples were identified:

1. Paragraph 2.2 was changed to delete a commitment to periodically examine the site description portion of the FSAR and to maintain a reasonable representation of the area population and land use. ,
2. Paragraph 13.3.1 was changed to delete a commitment to schedule  ;

training visits to other operating facilities for selected i supervisors.

3. Paragraph 2.6.2.1 was changed to delete collection of heavy particle fallout and rainwater samples at the local and perimeter environmental monitoring stations.

This deviation is applicable to all three units.

8710090240 870929 l PDR ADOCK 05000259 i G PDR l

. l 1

I l

~

Tennessee Valley Authority 2 Docket Nos. 50-259, 50-260, and 50-296 Browns Ferry 1, 2, and 3 License Nos. DPR-33, DPR-52 and DPR-68 Please provide, in writing within 30 days of the date of this Notice, a description of corrective actions regarding the deviation, actions taken to avoid further deviations, and the dates when these actions were or will be I completed.

FOR THE NUCLEAR REGULATORY COMMISSION s

Gary Zech, Assistant Director, Inspection Programs Division of TVA Projects Office of Special Projects Dated at Atlanta, Georgia thi s 49'4 day of September 1987 1