ML20247P762

From kanterella
Revision as of 20:54, 9 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Util in Region IV Ofc on 890607 to Discuss Backlog of Past Due LERs & Apparent Violation of 10CFR50,App B,Criterion III Re Failure of Design Analysis to Address All Operating Modes
ML20247P762
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/24/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 8906060242
Download: ML20247P762 (2)


Text

_ _ _ . . _ . _

o N

UNITED STATES a -- ^ *a NUCLEAR REGULATORY COMMISSION

's { 'j REGION IV

.g 8 611 RYAN Pt AZA DRIVE, SUITE 1000 o, , ARLINGTON, TEXAS 76011 May 24, 1989 NOTICE OF SIGNIFICANT LICENSEE ;4EETING Name of Licensee: Arkansas Power & Light Company Name of Facility: Arkansas Nuclear One Docket: 50-313; 50-368 Date and Time June 7, 1989, 12:30 p.m. (CDT) of Meeting:

Location of Meeting: NRC Region IV office, 8th floor conference room Purpose of Meeting: Management Meeting to discuss backlog of past due licensee event reports (NRC Inspection Report 50-313/89-22; 50-368/89-22). Immediately following the Management Meeting there will be an Enforcement Conference to discuss an apparent violation of 10 CFR 50, Appendix B, Criterion III, in that the design analysis with respect to temperature for the Unit 1 HPI system did not address all possible operdting modes (i.e., the LPI/HPI piggyback mode) (NRC Inspection Report 50-313/89-04;50-368/69-04).

NRC Attendees: L. J. Callan, Director, Division of Reactor Projects J. L. Milhoan, Director, Division of Reactor Safety D. D. Chamberlain, Chief, Project Section A A. T. Howell, Project Engineer, Project Section A W. D. Johnson, Senior Resident Inspector, Project Section A R. C. Haag, Resident Inspector Project Section A '

T. F. Stetka, Chief, Plant Systems Section Licensee Attendees: T. G. Campbell, Vice President - Nuclear N. S. Carns, Director, Nuclear Operations E. C. Ewing, General Manager - Plant Support D. B. Lomax, Licensing Supervisor (ANO)

D. E. James, Licensing Supervisor (LRGO)

W. A. Eaton, Manager, Mechanical / Civil / Structural Design K. D. Lan6, Manager, ANO Engineering Note: Attencance by NRC personnel at the NRC/ licensee meeting should be made known by 4 p.m. June 2, 1939, via telephone call to A. Howell (FTS 728-8160).

Approved By Oh L. J. Callan, Director 8906060242 890524 i Division of Reactor Projects PDR ADOCK 05000313!

G PNV j /

/

N *t

Arkansas Power & Light Company Distribution:

J. M. Taylor, DEDR H. L. Thompson, DEDS T. E. Murley, D/NRR F. J. Miraglia, ADT/NRR J. G. Partlow, ADP/NRR J. Lieberman, D/0E L. J. Chandler, Asst. GC for Enf.

C. Harbuck, Project Manager, NRR T. O. Martin, OEDO Staff R. D. Martin, RIV R. E. Hall, RIV G. F. Sanborn, E0 C. A. Hackney, RSLO J. Gilliland, PAO, RIV

.NRC Attendees DMB IE45 Licensee Address List

_ - - - - . __ . _ _ _