ML20199H791

From kanterella
Jump to navigation Jump to search
Notification of 980304 Meeting W/Util in Russelville,Ar to Discuss SALP
ML20199H791
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 01/28/1998
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9802050123
Download: ML20199H791 (5)


Text

-_ __---_-_.__ _ _______ _ _ -

e e-

. *p@* MOQ

' UNITE 3 STATES NUCLEAR REGULATORY COMMISSION E

g

j.

g REGION Iv 611 RYAN PLAZA DRIVE. SUITE 400 AR LINGToN, TEXA5 760114064

+,,... +,

JAN 2 81998 NOTICE OF LICENSEE MEETING Name of Licensee:

, Entergy Operations, Inc.

Name of Facility:

Arkansas Nuclear One Dockets:

50-313;50-368 Date and Time March 4,1938 of Meeting:

11 a.m.

Location of Meeting Ritchie Training Center, Russelville, Arkansas Purpose of Meeting:

Management meeting to discuss the results of the Systematic Assessment of Licensee Performance NRC Attendees:

E. Merschoff, Regional Administrator T. Gwyrin, Director, Director of Reactor Projects (DRP) l J. Hannon, Director, Project Directorate IV-1, Office of Nuclear Reactor Regulation (NRR)

E. Collins, Chief, Project Branch C, DRP

- W. Reckley, Project Manager, Project Directorate IV-1, NRR B. Henderson, Public Affairs, Region IV Licensee Attendees:

R.- Hutchinson,' Vice President R. Edington, General Manager D. Mims, Director, Licensing R. Lane, Director, Design Engineering C. Zimmerman, Plant Manager, Unit 1 '

C. Anderson,-Plant Manager, Unit 2' NOTE:

-(1)-

This meeting is open to attendance by members of the general public.

I (2)

NRC personnel, not listed above, that desire to attend this meeting should notify Elmo Collins at (817) 860-8291 by COB on March 2,1998.

Approved By: /C

/2

'Thomag. Gwynn, Direc 9

0 Division of Reactor Proj ' ts PDR 0

m.

. r n

Entergy Operations, Inc. ~

cc: -

- C. Randy Hutchinson, Vice President Operations-

-- Arkansas Nuclear One

= Entergy Operations, Inc.

1448 S.R. 333 '

Russellville,' Arkansas ~ 72801-0967.

- Executive Vice President

& Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 -

.Jacksoni Mississippi 39286-1995 -

Vice President-Operations Support -

Entwgy Operations, Inc. -

1

P.O. Box 31995 '

Jackson, Mississippi. 39286 -

Manager, Washington Nuclear Operations

  • ABB Combustion Engineering Nuclear

' Power:

12300 Twinbrook Parkway, Suite 330

. Rockville, Maryland J 20852 -

-l

County Judge of Pope County -

' Pope County Courthouse.

~

l Russellville, Arkansas -72801

' Winston & Strawn.

1400 L Street, N.W.

l

---Washington, D.C. _20005 3502 l

- David D.lSnellings, Jr., Director-

! Division of Radiation Control and Emergency Management fArkansas Department of Health 4815 West Markham Street, Mail Slot 30 Little Rock, Arkansas 72205-3867 e

m ;

- Entergy Operations, Inc.,

Manager :

Rockville Nuclear Licensing.

Framatome Technologies -

1700 Rockville Pike, Suite 525

Rockville, Maryland - 20852 -

(.

4 l

l 0

f.

J

z ;

g.

Entergy Operations, Inc.

4-

- JAN 2 81998

,EQB

E-Mail To:

- (; )

NRC Attendees-PMNS

.Mtg Announcement Coordinator JKR DEDE:

PAB DEDR

FJM '

- A/D/NRR ACT Actingi ADT/NRR.

~

RPZ --

' ADP/NRR

~

L OEMAIL -

D/OE LJC -

OGC

-KMK

~ ANO Senior Resident inspector CAH C. A. Hackney, RSLO i

e _

DMK1-D. M. Kunihiro, WCFO

.GFS-G. F. Sanborn, EO ypgg.

g,u__?aom KEP' K. Perkins, Director, WCFO JAC1,CJG,JES4 RA Secretaries LAT, DLF, DMY DRP Division 1 CLG; LMB, NLH DRS Division

-- CMS, WSW, CAM 3. DNMS Division --

1

-- LSO i L. Ousley.

cc:'

' DMB (IE 45)--

OEDO RIV Coordinator (17G21) -

' Receptionist

-. ORA File RIV File DRP File L

...a

~

-- DOCUMENT NAME: R:\\_ANO\\AN3-4MN.DRP To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with encigoures "N" = N_o copy RIV:PE:DRP/C-C:DRP)C PAO ~

6 6' RSLO-Sh D:DRPL//

CSMarschall;df*

EECdllu6 BWHenderson CAHackney TPGwyff

1/27/98 1/7;//98 1/7(/98-1/'J1/98 1/ 8 /98' 2

~ *previously concurred

._ OFFICIAL RECORD COPY n

..;+- 4 Entergy Operations, Inc. JAN.2 81998 E Mail To:

EQB

.(

).--

NRC Attendees PMNS-Mtg Announcement Coordinator JKR DEDE PAB--

DEDR

- FJM

- A/D/NRR ACT-

' Acting, ADT/NRR -

-RPZ.

ADP/NRR -

OEMAIL D/OE LJC,

OGC KMK-ANO Senior Resident inspector CAH

.C. A. Hackney, RSLO DMK1 D. M Kunihiro, WCFO-GFS G. F. Sanborn, EO ypgg.

-g, u__

_a om KEP..

K. Perkins, Director, WCFO JAC1,CJG,JES4 RA Secretaries

- LAT, DLF, DMY DRP Division CLG, LMB, NLH DRS Division CMS, WSW, CAM 3 DNMS Division LSO L. _Ouslay cc:

WWE DE 45)U, OEDO RIV Coordinator (17G21)

Receptionist -

ORA File

. RIV File -

DRP File -

DOCUMENT NAME: R:\\_ANO\\AN3-4MN.DRP p

- To receive copy of document. Indicate in box:"C" = Copy without enclosures "E" = Copy with enchpures "N" = No copy RIV:PE:DRP/C C:DRP)C PAO-hff RSLO tM D:DRPL//

CSMarschall;df*

  • EEGM BWHenderson CAHackney TPGwy6(8" 1/27/98-1/2ff/98 1/l$1/98 1/'))/98 1/ 8 /98' 2
  • previously concurred.

OFFICIAL RECORD COPY